Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BID - 7658 MISCELLANEOUS CONCRETE ANNUAL (2)
Addendum 2 – 7658 Miscellaneous Concrete Annual Page 1 of 11 ADDENDUM NO. 2 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of BID 7658: Miscellaneous Concrete Annual OPENING DATE: 3:00 PM (Our Clock) June 27, 2014 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: 1. REVISIONS TO THE BID SCHEDULE A. Remove and Eliminate: Base Bid Schedule 1; Line Item 627.02; Truck and Equipment Time (hour) B. Remove and Eliminate: Base Bid Schedule 1; Line Item 627.03; Trip Hazard Removal (Linear Foot) REASON: These items are not needed for the contract and were mistakenly included in the schedule. 2. EXHIBIT 1 – REVISED BID SCHEDULES Please contact John Stephen, CPPO, LEED AP, Senior Buyer at (970) 221-6777 with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing EXHIBIT 1 – REVISED BID SCHEDULES (Please note that the Bid Schedules have also been uploaded as a separate Microsoft Excel file.) Addendum 2 – 7658 Miscellaneous Concrete Annual Page 2 of 11 202.01 Sawcut Concrete/Asphalt (0" < 4") Lineal Foot 20 $ - 202.02 Sawcut Concrete/Asphalt (4" < 6") Lineal Foot 20 $ - 202.03 Sawcut Concrete/Asphalt (6" < 8") Lineal Foot 20 $ - 202.04 Sawcut Concrete/Asphalt (8" ≤ 10") Lineal Foot 20 $ - 202.05 Sawcut - Additional 1" Depth Lineal Foot 25 $ - 202.06 Remove Concrete Sidewalk Square Foot 2100 $ - 202.07 Remove Concrete Curb & Gutter Lineal Foot 850 $ - 202.08 Remove Monolithic Curb, Gutter & Sidewalk Square Foot 1300 $ - 202.09 Remove Concrete Driveway/Apron/Crosspan Square Foot 3000 $ - 202.10 Remove Concrete Pavement - 10" Square Foot 300 $ - 202.11 Remove Concrete Pavement - Additional 1" Depth Square Foot 100 $ - 202.12 Remove Asphalt - 6" Square Foot 200 $ - 202.13 Remove Asphalt - Additional 1" Depth Square Foot 500 $ - 202.14 Remove Inlet Each 5 $ - 202.15 Remove and Haul Driveway Fillet Each 5 $ - 202.16 Remove Flagstone Square Foot Addendum 2 – 7658 Miscellaneous Concrete Annual Page 3 of 11 210.04 Adjust Valve Box Each 10 $ - 304.01 Aggregate Base Course/Recycled Concrete Base ≤ 5 Tons Ton 75 $ - 304.02 Aggregate Base Course/Recycled Concrete Base > 5 Tons Ton 50 $ - 304.03 Recycled Asphalt Base Ton 25 $ - 403.01 Temporary Asphalt Patching Ton 100 $ - 601.01 Exposed Sand Finish - Additional Charge Square Foot 500 $ - 602.01 Reinforcing Steel Pound 250 $ - 602.02 Reinforcing Steel - Epoxy Coated Pound 250 $ - 604.01 Install New Area Inlet Each 5 $ - 604.02 Area Inlet – Additional Foot Depth Lineal Foot 5 $ - 604.03 Reconstruct Area Inlet Deck – Remove & Replace Each 5 $ - 604.04 Reconstruct Area Inlet Deck - Additional Foot Opening – Remove & Replace Lineal Foot 5 $ - 604.05 Reconstruct Catch Basin Deck - Remove & Replace Each 10 $ - 604.06 Reconstruct Catch Basin Deck - Additional Foot Opening – Remove & Replace Lineal Foot 10 $ - 604.07 Install New Curb Inlet – 4’ Opening Each 5 $ - 604.08 Curb Inlet – Additional Foot Depth Lineal Foot 10 $ - 604.09 Reconstruct Curb Inlet Deck – Remove and Replace Each 10 $ - 604.10 Reconstruct Curb Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Foot 15 $ - 604.11 Install New Type R Inlet - 5' Opening Each 10 $ - 604.12 Type R Inlet – Additional Foot Depth Lineal Foot 15 $ - 604.13 Reconstruct Type R Inlet Deck – Remove and Replace Each 10 $ - 604.14 Reconstruct Type R Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Foot 10 $ - 604.15 Install New Modified Type 13 Curb Inlet (includes new Frame, Grate & Adjustable Curb Bonnet) Each 5 $ - 604.16 Modified Type 13 Curb Inlet – Additional Foot Depth Lineal Foot 10 $ - 604.17 Reconstruct Modified Type 13 Curb Inlet Deck – Remove & Replace Each 6 $ - 604.18 Reconstruct Modified Type 13 Curb Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Addendum 2 – 7658 Miscellaneous Concrete Annual Page 4 of 11 604.23 Additional Square Foot 5/8" Plate Square Foot 15 $ - 608.01 Driveover Curb, Gutter & 6" Sidewalk Lineal Foot 1,200 $ - 608.02 Driveover Curb and Gutter - No Sidewalk Lineal Foot 525 $ - 608.03 Vertical Curb, Gutter and 6" Sidewalk Lineal Foot 1000 $ - 608.04 Vertical Curb and Gutter - No Sidewalk Lineal Foot 2300 $ - 608.05 Out Fall Curb & Gutter Lineal Foot 100 $ - 608.06 Hollywood Curb, Gutter and 6" Sidewalk Lineal Foot 500 $ - 608.07 Hollywood Curb and Gutter - No Sidewalk Lineal Foot 300 $ - 608.08 Highback Curb and Gutter - No Sidewalk Lineal Foot 500 $ - 608.09 Barrier Curb - 6" x 18" Lineal Foot 100 $ - 608.10 Barrier Curb - Key Way Style Lineal Foot 100 $ - 608.11 Barrier Curb - Epoxy Lineal Foot 150 $ - 608.12 Mountable Curb - 12" x 18" Lineal Foot 125 $ - 608.13 Mountable Curb - Keyway Style Lineal Foot 125 $ - 608.14 Mountable Curb – Epoxy Lineal Foot Addendum 2 – 7658 Miscellaneous Concrete Annual Page 5 of 11 608.31 Splashblock - 4" Exposed Aggregate Square Foot 325 $ - 608.32 Splashblock - 4" San Diego Buff Square Foot 350 $ - 608.33 Median Cover - 4" San Diego Buff Square Foot 400 $ - 608.34 Fibermesh - Added to Any Item - Additional Charge Pounds / Cubic 75 $ - 608.35 24 Hour High Early Concrete - Added to Any Item - Additional Charge Cubic Yard 25 $ - 608.36 Stamp Pattern - Added to Any Item, Additional Charge Square Foot 150 $ - 608.37 6" Concrete Bollard Each 5 $ - 608.38 8" Concrete Bollard Each 5 $ - 608.39 Flowable Fill Cubic Yard 25 $ - 608.40 Non-reinforced Concrete Wall - 8" Square Face Foot 400 $ - 608.41 Non-reinforced Concrete Footer - 8" Square Foot 200 $ - 608.42 Concrete Staining/Sealing Square Foot 150 $ - 608.43 Expansion and Caulking Lineal Foot 250 $ - 608.44 Joint Sealant (Pavement) Lineal Foot 100 $ - 608.45 Irrigation Sleeve Lineal Foot 20 $ - 608.46 Dump Fee Ton 5 $ - 608.47 Asphalt Pavement Preservation Lineal Foot 500 $ - Addendum 2 – 7658 Miscellaneous Concrete Annual Page 6 of 11 630.15 Traffic Control Supervisor Per Day 25 $ - 630.16 Traffic Control Supervisor Hour 450 $ - 630.17 Flagging Hour 650 $ - FA1 Laborer Hour 15 $ - FA2 Foreman Hour 15 $ - FA3 Finisher Hour 15 $ - FA4 Form Setter Hour 15 $ - FA5 Skid Steer Hour 75 $ - FA6 Mini Trackhoe Hour 15 $ - FA7 Dump Truck Hour 15 $ - FA8 Backhoe Hour 15 $ - TOTAL COST $ - FORCE ACCOUNT Addendum 2 – 7658 Miscellaneous Concrete Annual Page 7 of 11 202.01 Sawcut Concrete/Asphalt (0" < 4") Lineal Foot 10 $ - 202.02 Sawcut Concrete/Asphalt 4" < 6" Lineal Foot 10 $ - 202.03 Sawcut Concrete/Asphalt 6" < 8" Lineal Foot 10 $ - 202.04 Sawcut Concrete/Asphalt 8" ≤ 10" Lineal Foot 10 $ - 202.05 Sawcut - Additional 1" Depth Lineal Foot 10 $ - 202.06 Remove Concrete Sidewalk Square Foot 100 $ - 202.07 Remove Concrete Curb and Gutter Lineal Foot 100 $ - 202.08 Remove Monolithic Curb, Gutter & Sidewalk Square Foot 100 $ - 202.09 Remove Concrete Driveway/Apron/Crosspan Square Foot 100 $ - 202.10 Remove Concrete Pavement - 10" Square Foot 500 $ - 202.11 Remove Concrete Pavement - Additional 1" Depth Square Foot 100 $ - 202.12 Remove Asphalt - 6" Square Foot 100 $ - 202.13 Remove Asphalt - Additional 1" Depth Square Foot 100 $ - 202.14 Remove Inlet Each 1 $ - 202.15 Remove and Haul Driveway Fillet Each 1 $ - 202.16 Remove Flagstone Square Foot 50 $ - 203.01 Excavation - General Less Than 50 CY Cubic Addendum 2 – 7658 Miscellaneous Concrete Annual Page 8 of 11 210.04 Adjust Valve Box Each 1 $ - 304.01 Aggregate Base Course/Recycled Concrete Base ≤ 5 Tons Ton 5 $ - 304.02 Aggregate Base Course/Recycled Concrete Base > 5 Tons Ton 50 $ - 304.03 Recycled Asphalt Base Ton 10 $ - 403.01 Temporary Asphalt Patching Ton 20 $ - 601.01 Exposed Sand Finish - Additional Charge Square Foot 500 $ - 602.01 Reinforcing Steel Pound 150 $ - 602.02 Reinforcing Steel - Epoxy Coated Pound 150 $ - 604.01 Install New Area Inlet Each 1 $ - 604.02 Area Inlet – Additional Foot Depth Lineal Foot 5 $ - 604.03 Reconstruct Area Inlet Deck – Remove & Replace Each 1 $ - 604.04 Reconstruct Area Inlet Deck - Additional Foot Opening – Remove & Replace Lineal Foot 5 $ - 604.05 Reconstruct Catch Basin Deck - Remove & Replace Each 1 $ - 604.06 Reconstruct Catch Basin Deck - Additional Foot Opening – Remove & Replace Lineal Foot 5 $ - 604.07 Install New Curb Inlet – 4’ Opening Each 1 $ - 604.08 Curb Inlet – Additional Foot Depth Lineal Foot 5 $ - 604.09 Reconstruct Curb Inlet Deck – Remove and Replace Each 1 $ - 604.10 Reconstruct Curb Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Foot 5 $ - 604.11 Install New Type R Inlet - 5' Opening Each 1 $ - 604.12 Type R Inlet – Additional Foot Depth Lineal Foot 5 $ - 604.13 Reconstruct Type R Inlet Deck – Remove and Replace Each 1 $ - 604.14 Reconstruct Type R Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Foot 5 $ - 604.15 Install New Modified Type 13 Curb Inlet (includes new Frame, Grate & Adjustable Curb Bonnet) Each 1 $ - 604.16 Modified Type 13 Curb Inlet – Additional Foot Depth Lineal Foot 5 $ - 604.17 Reconstruct Modified Type 13 Curb Inlet Deck – Remove & Replace Each 1 $ - 604.18 Reconstruct Modified Type 13 Curb Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Addendum 2 – 7658 Miscellaneous Concrete Annual Page 9 of 11 604.22 Metal Sidewalk Culvert - 2' Opening, Materials Only Each 1 $ - 604.23 Additional Square Foot 5/8" Plate Square Foot 5 $ - 608.01 Driveover Curb, Gutter & 6" Sidewalk Lineal Foot 150 $ - 608.02 Driveover Curb and Gutter - No Sidewalk Lineal Foot 25 $ - 608.03 Vertical Curb, Gutter and 6" Sidewalk Lineal Foot 50 $ - 608.04 Vertical Curb and Gutter - No Sidewalk Lineal Foot 50 $ - 608.05 Out Fall Curb & Gutter Lineal Foot 25 $ - 608.06 Hollywood Curb, Gutter and 6" Sidewalk Lineal Foot 25 $ - 608.07 Hollywood Curb and Gutter - No Sidewalk Lineal Foot 25 $ - 608.08 Highback Curb and Gutter - No Sidewalk Lineal Foot 50 $ - 608.09 Barrier Curb - 6" x 18" Lineal Foot 25 $ - 608.10 Barrier Curb - Key Way Style Lineal Foot 25 $ - 608.11 Barrier Curb - Epoxy Lineal Foot 25 $ - 608.12 Mountable Curb - 12" x 18" Lineal Foot 25 $ - 608.13 Mountable Curb - Keyway Style Lineal Foot 25 $ - 608.14 Mountable Curb – Epoxy Lineal Addendum 2 – 7658 Miscellaneous Concrete Annual Page 10 of 11 608.28 Enhanced Crosswalk - 10" Brick Red, Stamped Square Foot 25 $ - 608.29 Colored Trail with Fibermesh - 5" Yosemite Brown Square Foot 25 $ - 608.30 Mow Strip - 4" x 12" Lineal Foot 25 $ - 608.31 Splashblock - 4" Exposed Aggregate Square Foot 25 $ - 608.32 Splashblock - 4" San Diego Buff Square Foot 25 $ - 608.33 Median Cover - 4" San Diego Buff Square Foot 25 $ - 608.34 Fibermesh - Added to Any Item - Additional Charge Pounds / Cubic 25 $ - 608.35 24 Hour High Early Concrete - Added to Any Item - Additional Charge Cubic Yard 20 $ - 608.36 Stamp Pattern - Added to Any Item, Additional Charge Square Foot 25 $ - 608.37 6" Concrete Bollard Each 5 $ - 608.38 8" Concrete Bollard Each 5 $ - 608.39 Flowable Fill Cubic Yard 25 $ - 608.40 Non-reinforced Concrete Wall - 8" Square Face Foot 25 $ - 608.41 Non-reinforced Concrete Footer - 8" Square Foot 25 $ - 608.42 Concrete Staining/Sealing Square Foot 25 $ - 608.43 Expansion and Caulking Lineal Foot 50 $ - 608.44 Joint Sealant (Pavement) Addendum 2 – 7658 Miscellaneous Concrete Annual Page 11 of 11 630.11 Safety Fence Per Roll Per Day 5 $ - 630.12 Light Per Day Per Each 25 $ - 630.13 Advance Warning Flashing or Sequencing Arrow Panel Per Day Per Each 10 $ - 630.14 Variable Message Board Per Day Per Each 10 $ - 630.15 Traffic Control Supervisor Per Day 5 $ - 630.16 Traffic Control Supervisor Hour 25 $ - 630.17 Flagging Hour 25 $ - FA1 Laborer Hour 20 $ - FA2 Foreman Hour 20 $ - FA3 Finisher Hour 20 $ - FA4 Form Setter Hour 20 $ - FA5 Skid Steer Hour 20 $ - FA6 Mini Trackhoe Hour 20 $ - FA7 Dump Truck Hour 20 $ - FA8 Backhoe Hour 20 $ - TOTAL COST $ - ADDITIONAL SERVICES Lineal Foot 50 $ - 608.45 Irrigation Sleeve Lineal Foot 25 $ - 608.46 Dump Fee Ton 25 $ - 630.01 "NO PARKING" Sign With Stand Per Day Per Each 25 $ - 630.02 Vertical Panel Without Light Per Day Per Each 25 $ - 630.03 Channelizing Barrels Per Day Per Each 25 $ - 630.04 Type I/II Barricade Without Light Per Day Per Each 25 $ - 630.05 Type III Barricade Without Light Per Day Per Each 10 $ - 630.06 Size A Sign With Stand Per Day Per Each 10 $ - 630.07 Size B Sign With Stand Per Day Per Each 10 $ - 630.08 Size A Specialty Sign - Cost of Manufacturing Each 2 $ - 630.09 Size B Specialty Sign - Cost of Manufacturing Each 2 $ - 630.10 Cone With Reflective Strip Per Day Per Each 100 $ - Foot 25 $ - 608.15 Pedestrian Access Ramp Square Foot 300 $ - 608.16 Pedestrian Access Ramp, Highback Curb Square Foot 50 $ - 608.17 Truncated Dome Panel Square Foot 25 $ - 608.18 Apron - 8" Square Foot 20 $ - 608.19 Crosspan - 8" Square Foot 20 $ - 608.20 Valley Pan - 6" Square Foot 20 $ - 608.21 Flatwork - 4" Square Foot 25 $ - 608.22 Flatwork - 6" Square Foot 100 $ - 608.23 Replace Flatwork - 1" Additional Depth Square Foot 960 $ - 608.24 Concrete Pavement 8" (Joints Sealed) Square Foot 500 $ - 608.25 Alley Approach - 8" Square Foot 25 $ - 608.26 Enhanced Crosswalk - 10" Tile Red Square Foot 25 $ - 608.27 Enhanced Crosswalk - 10" San Diego Buff Square Foot 25 $ - Foot 5 $ - 604.19 Modified Type 13 Curb Inlet – Materials only - (Frame, Grate, & adjustable bonnet (East Jordan Iron Works 7030 or Equivalent Material) Each 2 $ - 604.20 Concrete Sidewalk Culvert – 4’ opening Each 1 $ - 604.21 Metal Sidewalk Culvert - 2' Opening, Remove & Replace Each 1 $ - Yard 25 $ - 203.02 Excavation - General Over 50 CY Cubic Yard 100 $ - 203.03 Excavation - Walls Only Cubic Yard 25 $ - 203.04 Excavation - New Inlet Each 1 $ - 203.05 Borrow - Less than 100 Ton Ton 25 $ - 203.06 Borrow - Over 100 Ton Ton 100 $ - 208.01 Stormwater Protection - Rock Filled Wattle Lineal Foot 25 $ - 208.02 Stormwater Protection - Recycled Rubber Filled Wattle Lineal Foot 25 $ - 208.03 Stormwater Protection - Straw Bales Each 25 $ - 210.01 Reset Flagstone Square Foot 50 $ - 210.02 Reset Brick Pavers Square Foot 250 $ - 210.03 Adjust Manhole Each 1 $ - ADDENDUM 2 BID SCHEDULE 2 - FEDERAL REQUIREMENTS WITH DAVIS BACON Unit Price Total Item No. Description Unit Contract Quantity 630.01 "NO PARKING" Sign With Stand Per Each Per Day 375 $ - 630.02 Vertical Panel Without Light Per Each Per Day 400 $ - 630.03 Channelizing Barrels Per Each Per Day 650 $ - 630.04 Type I/II Barricade Without Light Per Each Per Day 800 $ - 630.05 Type III Barricade Without Light Per Each Per Day 25 $ - 630.06 Size A Sign With Stand Per Each Per Day 350 $ - 630.07 Size B Sign With Stand Per Each Per Day 75 $ - 630.08 Size A Specialty Sign - Cost of Manufacturing Each 2 $ - 630.09 Size B Specialty Sign - Cost of Manufacturing Each 2 $ - 630.10 Cone With Reflective Strip Per Each Per Day 3500 $ - 630.11 Safety Fence Per Roll Per Day 20 $ - 630.12 Light Per Each Per Day 20 $ - 630.13 Advance Warning Flashing or Sequencing Arrow Panel Per Each Per Day 15 $ - 630.14 Variable Message Board Per Each Per Day 110 $ - 100 $ - 608.15 Pedestrian Access Ramp Square Foot 750 $ - 608.16 Pedestrian Access Ramp, Highback Curb Square Foot 375 $ - 608.17 Truncated Dome Panel Square Foot 100 $ - 608.18 Apron - 8" Square Foot 1450 $ - 608.19 Crosspan - 8" Square Foot 1200 $ - 608.20 Valley Pan - 6" Square Foot 500 $ - 608.21 Flatwork - 4" Square Foot 1,850 $ - 608.22 Flatwork - 6" Square Foot 3,800 $ - 608.23 Replace Flatwork - 1" Additional Depth Square Foot 250 $ - 608.24 Concrete Pavement 8" (Joints Sealed) Square Foot 1,500 $ - 608.25 Alley Approach - 8" Square Foot 1000 $ - 608.26 Enhanced Crosswalk - 10" Tile Red Square Foot 450 $ - 608.27 Enhanced Crosswalk - 10" San Diego Buff Square Foot 450 $ - 608.28 Enhanced Crosswalk - 10" Brick Red, Stamped Square Foot 450 $ - 608.29 Colored Trail with Fibermesh - 5" Yosemite Brown Square Foot 400 $ - 608.30 Mow Strip - 4" x 12" Lineal Foot 150 $ - Foot 10 $ - 604.19 Modified Type 13 Curb Inlet – Materials only - (Frame, Grate, & adjustable bonnet (East Jordan Iron Works 7030 or Equivalent Material) Each 5 $ - 604.20 Concrete Sidewalk Culvert – 4’ opening Each 5 $ - 604.21 Metal Sidewalk Culvert - 2' Opening, Remove & Replace Each 4 $ - 604.22 Metal Sidewalk Culvert - 2' Opening, Materials Only Each 5 $ - 200 $ - 203.01 Excavation - General Less Than 50 CY Cubic Yard 25 $ - 203.02 Excavation - General Over 50 CY Cubic Yard 125 $ - 203.03 Excavation - Walls Only Cubic Yard 100 $ - 203.04 Excavation - New Inlet Each 5 $ - 203.05 Borrow - Less than 100 Ton Ton 50 $ - 203.06 Borrow - Over 100 Ton Ton 125 $ - 207.01 Imported Topsoil Cubic Yard 25 $ - 208.01 Stormwater Protection - Rock Filled Wattle Lineal Foot 100 $ - 208.02 Stormwater Protection - Recycled Rubber Filled Wattle Lineal Foot 25 $ - 208.03 Stormwater Protection - Straw Bales Each 5 $ - 210.01 Reset Flagstone Square Foot 100 $ - 210.02 Reset Brick Pavers Square Foot 250 $ - 210.03 Adjust Manhole Each 10 $ - ItemDescription No. ADDENDUM 2 BID SCHEDULE 1 - BASE BID (Non-Federal) Contract UnitQuantity Unit Price Total