HomeMy WebLinkAboutBID - 7658 MISCELLANEOUS CONCRETE ANNUALAddendum 1 – 7658 Miscellaneous Concrete Annual Page 1 of 12 ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of BID 7658: Miscellaneous Concrete Annual OPENING DATE: 3:00 PM (Our Clock) June 27, 2014 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: Exhibit 1 – Revised Bid Schedules Exhibit 2 – Clarifications & Revisions Please contact John Stephen, CPPO, LEED AP, Senior Buyer at (970) 221-6777 with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing EXHIBIT 1 – REVISED BID SCHEDULES (Please note that the Bid Schedules have also been uploaded as a separate Microsoft Excel file.) Addendum 1 – 7658 Miscellaneous Concrete Annual Page 2 of 12 202.01 Sawcut Concrete/Asphalt (0" < 4") Lineal Foot 20 $ - 202.02 Sawcut Concrete/Asphalt (4" < 6") Lineal Foot 20 $ - 202.03 Sawcut Concrete/Asphalt (6" < 8") Lineal Foot 20 $ - 202.04 Sawcut Concrete/Asphalt (8" ≤ 10") Lineal Foot 20 $ - 202.05 Sawcut - Additional 1" Depth Lineal Foot 25 $ - 202.06 Remove Concrete Sidewalk Square Foot 2100 $ - 202.07 Remove Concrete Curb & Gutter Lineal Foot 850 $ - 202.08 Remove Monolithic Curb, Gutter & Sidewalk Square Foot 1300 $ - 202.09 Remove Concrete Driveway/Apron/Crosspan Square Foot 3000 $ - 202.10 Remove Concrete Pavement - 10" Square Foot 300 $ - 202.11 Remove Concrete Pavement - Additional 1" Depth Square Foot 100 $ - 202.12 Remove Asphalt - 6" Square Foot 200 $ - 202.13 Remove Asphalt - Additional 1" Depth Square Foot 500 $ - 202.14 Remove Inlet Each 5 $ - 202.15 Remove and Haul Driveway Fillet Each 5 $ - 202.16 Remove Flagstone Square Foot Addendum 1 – 7658 Miscellaneous Concrete Annual Page 3 of 12 210.04 Adjust Valve Box Each 10 $ - 304.01 Aggregate Base Course/Recycled Concrete Base ≤ 5 Tons Ton 75 $ - 304.02 Aggregate Base Course/Recycled Concrete Base > 5 Tons Ton 50 $ - 304.03 Recycled Asphalt Base Ton 25 $ - 403.01 Temporary Asphalt Patching Ton 100 $ - 601.01 Exposed Sand Finish - Additional Charge Square Foot 500 $ - 602.01 Reinforcing Steel Pound 250 $ - 602.02 Reinforcing Steel - Epoxy Coated Pound 250 $ - 604.01 Install New Area Inlet Each 5 $ - 604.02 Area Inlet – Additional Foot Depth Lineal Foot 5 $ - 604.03 Reconstruct Area Inlet Deck – Remove & Replace Each 5 $ - 604.04 Reconstruct Area Inlet Deck - Additional Foot Opening – Remove & Replace Lineal Foot 5 $ - 604.05 Reconstruct Catch Basin Deck - Remove & Replace Each 10 $ - 604.06 Reconstruct Catch Basin Deck - Additional Foot Opening – Remove & Replace Lineal Foot 10 $ - 604.07 Install New Curb Inlet – 4’ Opening Each 5 $ - 604.08 Curb Inlet – Additional Foot Depth Lineal Foot 10 $ - 604.09 Reconstruct Curb Inlet Deck – Remove and Replace Each 10 $ - 604.10 Reconstruct Curb Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Foot 15 $ - 604.11 Install New Type R Inlet - 5' Opening Each 10 $ - 604.12 Type R Inlet – Additional Foot Depth Lineal Foot 15 $ - 604.13 Reconstruct Type R Inlet Deck – Remove and Replace Each 10 $ - 604.14 Reconstruct Type R Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Foot 10 $ - 604.15 Install New Modified Type 13 Curb Inlet (includes new Frame, Grate & Adjustable Curb Bonnet) Each 5 $ - 604.16 Modified Type 13 Curb Inlet – Additional Foot Depth Lineal Foot 10 $ - 604.17 Reconstruct Modified Type 13 Curb Inlet Deck – Remove & Replace Each 6 $ - 604.18 Reconstruct Modified Type 13 Curb Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Addendum 1 – 7658 Miscellaneous Concrete Annual Page 4 of 12 604.23 Additional Square Foot 5/8" Plate Square Foot 15 $ - 608.01 Driveover Curb, Gutter & 6" Sidewalk Lineal Foot 1,200 $ - 608.02 Driveover Curb and Gutter - No Sidewalk Lineal Foot 525 $ - 608.03 Vertical Curb, Gutter and 6" Sidewalk Lineal Foot 1000 $ - 608.04 Vertical Curb and Gutter - No Sidewalk Lineal Foot 2300 $ - 608.05 Out Fall Curb & Gutter Lineal Foot 100 $ - 608.06 Hollywood Curb, Gutter and 6" Sidewalk Lineal Foot 500 $ - 608.07 Hollywood Curb and Gutter - No Sidewalk Lineal Foot 300 $ - 608.08 Highback Curb and Gutter - No Sidewalk Lineal Foot 500 $ - 608.09 Barrier Curb - 6" x 18" Lineal Foot 100 $ - 608.10 Barrier Curb - Key Way Style Lineal Foot 100 $ - 608.11 Barrier Curb - Epoxy Lineal Foot 150 $ - 608.12 Mountable Curb - 12" x 18" Lineal Foot 125 $ - 608.13 Mountable Curb - Keyway Style Lineal Foot 125 $ - 608.14 Mountable Curb – Epoxy Lineal Foot Addendum 1 – 7658 Miscellaneous Concrete Annual Page 5 of 12 608.31 Splashblock - 4" Exposed Aggregate Square Foot 325 $ - 608.32 Splashblock - 4" San Diego Buff Square Foot 350 $ - 608.33 Median Cover - 4" San Diego Buff Square Foot 400 $ - 608.34 Fibermesh - Added to Any Item - Additional Charge Pounds / Cubic 75 $ - 608.35 24 Hour High Early Concrete - Added to Any Item - Additional Charge Cubic Yard 25 $ - 608.36 Stamp Pattern - Added to Any Item, Additional Charge Square Foot 150 $ - 608.37 6" Concrete Bollard Each 5 $ - 608.38 8" Concrete Bollard Each 5 $ - 608.39 Flowable Fill Cubic Yard 25 $ - 608.40 Non-reinforced Concrete Wall - 8" Square Face Foot 400 $ - 608.41 Non-reinforced Concrete Footer - 8" Square Foot 200 $ - 608.42 Concrete Staining/Sealing Square Foot 150 $ - 608.43 Expansion and Caulking Lineal Foot 250 $ - 608.44 Joint Sealant (Pavement) Lineal Foot 100 $ - 608.45 Irrigation Sleeve Lineal Foot 20 $ - 608.46 Dump Fee Ton 5 $ - 608.47 Asphalt Pavement Preservation Lineal Foot 500 $ - Addendum 1 – 7658 Miscellaneous Concrete Annual Page 6 of 12 630.14 Variable Message Board Per Each Per Day 110 $ - 630.15 Traffic Control Supervisor Per Day 25 $ - 630.16 Traffic Control Supervisor Hour 450 $ - 630.17 Flagging Hour 650 $ - FA1 Laborer Hour 15 $ - FA2 Foreman Hour 15 $ - FA3 Finisher Hour 15 $ - FA4 Form Setter Hour 15 $ - FA5 Skid Steer Hour 75 $ - FA6 Mini Trackhoe Hour 15 $ - FA7 Dump Truck Hour 15 $ - FA8 Backhoe Hour 15 $ - TOTAL COST $ - FORCE ACCOUNT Addendum 1 – 7658 Miscellaneous Concrete Annual Page 7 of 12 202.01 Sawcut Concrete/Asphalt (0" < 4") Lineal Foot 10 $ - 202.02 Sawcut Concrete/Asphalt 4" < 6" Lineal Foot 10 $ - 202.03 Sawcut Concrete/Asphalt 6" < 8" Lineal Foot 10 $ - 202.04 Sawcut Concrete/Asphalt 8" ≤ 10" Lineal Foot 10 $ - 202.05 Sawcut - Additional 1" Depth Lineal Foot 10 $ - 202.06 Remove Concrete Sidewalk Square Foot 100 $ - 202.07 Remove Concrete Curb and Gutter Lineal Foot 100 $ - 202.08 Remove Monolithic Curb, Gutter & Sidewalk Square Foot 100 $ - 202.09 Remove Concrete Driveway/Apron/Crosspan Square Foot 100 $ - 202.10 Remove Concrete Pavement - 10" Square Foot 500 $ - 202.11 Remove Concrete Pavement - Additional 1" Depth Square Foot 100 $ - 202.12 Remove Asphalt - 6" Square Foot 100 $ - 202.13 Remove Asphalt - Additional 1" Depth Square Foot 100 $ - 202.14 Remove Inlet Each 1 $ - 202.15 Remove and Haul Driveway Fillet Each 1 $ - 202.16 Remove Flagstone Square Foot 50 $ - 203.01 Excavation - General Less Than 50 CY Cubic Addendum 1 – 7658 Miscellaneous Concrete Annual Page 8 of 12 210.04 Adjust Valve Box Each 1 $ - 304.01 Aggregate Base Course/Recycled Concrete Base ≤ 5 Tons Ton 5 $ - 304.02 Aggregate Base Course/Recycled Concrete Base > 5 Tons Ton 50 $ - 304.03 Recycled Asphalt Base Ton 10 $ - 403.01 Temporary Asphalt Patching Ton 20 $ - 601.01 Exposed Sand Finish - Additional Charge Square Foot 500 $ - 602.01 Reinforcing Steel Pound 150 $ - 602.02 Reinforcing Steel - Epoxy Coated Pound 150 $ - 604.01 Install New Area Inlet Each 1 $ - 604.02 Area Inlet – Additional Foot Depth Lineal Foot 5 $ - 604.03 Reconstruct Area Inlet Deck – Remove & Replace Each 1 $ - 604.04 Reconstruct Area Inlet Deck - Additional Foot Opening – Remove & Replace Lineal Foot 5 $ - 604.05 Reconstruct Catch Basin Deck - Remove & Replace Each 1 $ - 604.06 Reconstruct Catch Basin Deck - Additional Foot Opening – Remove & Replace Lineal Foot 5 $ - 604.07 Install New Curb Inlet – 4’ Opening Each 1 $ - 604.08 Curb Inlet – Additional Foot Depth Lineal Foot 5 $ - 604.09 Reconstruct Curb Inlet Deck – Remove and Replace Each 1 $ - 604.10 Reconstruct Curb Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Foot 5 $ - 604.11 Install New Type R Inlet - 5' Opening Each 1 $ - 604.12 Type R Inlet – Additional Foot Depth Lineal Foot 5 $ - 604.13 Reconstruct Type R Inlet Deck – Remove and Replace Each 1 $ - 604.14 Reconstruct Type R Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Foot 5 $ - 604.15 Install New Modified Type 13 Curb Inlet (includes new Frame, Grate & Adjustable Curb Bonnet) Each 1 $ - 604.16 Modified Type 13 Curb Inlet – Additional Foot Depth Lineal Foot 5 $ - 604.17 Reconstruct Modified Type 13 Curb Inlet Deck – Remove & Replace Each 1 $ - 604.18 Reconstruct Modified Type 13 Curb Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Addendum 1 – 7658 Miscellaneous Concrete Annual Page 9 of 12 604.22 Metal Sidewalk Culvert - 2' Opening, Materials Only Each 1 $ - 604.23 Additional Square Foot 5/8" Plate Square Foot 5 $ - 608.01 Driveover Curb, Gutter & 6" Sidewalk Lineal Foot 150 $ - 608.02 Driveover Curb and Gutter - No Sidewalk Lineal Foot 25 $ - 608.03 Vertical Curb, Gutter and 6" Sidewalk Lineal Foot 50 $ - 608.04 Vertical Curb and Gutter - No Sidewalk Lineal Foot 50 $ - 608.05 Out Fall Curb & Gutter Lineal Foot 25 $ - 608.06 Hollywood Curb, Gutter and 6" Sidewalk Lineal Foot 25 $ - 608.07 Hollywood Curb and Gutter - No Sidewalk Lineal Foot 25 $ - 608.08 Highback Curb and Gutter - No Sidewalk Lineal Foot 50 $ - 608.09 Barrier Curb - 6" x 18" Lineal Foot 25 $ - 608.10 Barrier Curb - Key Way Style Lineal Foot 25 $ - 608.11 Barrier Curb - Epoxy Lineal Foot 25 $ - 608.12 Mountable Curb - 12" x 18" Lineal Foot 25 $ - 608.13 Mountable Curb - Keyway Style Lineal Foot 25 $ - 608.14 Mountable Curb – Epoxy Lineal Addendum 1 – 7658 Miscellaneous Concrete Annual Page 10 of 12 608.28 Enhanced Crosswalk - 10" Brick Red, Stamped Square Foot 25 $ - 608.29 Colored Trail with Fibermesh - 5" Yosemite Brown Square Foot 25 $ - 608.30 Mow Strip - 4" x 12" Lineal Foot 25 $ - 608.31 Splashblock - 4" Exposed Aggregate Square Foot 25 $ - 608.32 Splashblock - 4" San Diego Buff Square Foot 25 $ - 608.33 Median Cover - 4" San Diego Buff Square Foot 25 $ - 608.34 Fibermesh - Added to Any Item - Additional Charge Pounds / Cubic 25 $ - 608.35 24 Hour High Early Concrete - Added to Any Item - Additional Charge Cubic Yard 20 $ - 608.36 Stamp Pattern - Added to Any Item, Additional Charge Square Foot 25 $ - 608.37 6" Concrete Bollard Each 5 $ - 608.38 8" Concrete Bollard Each 5 $ - 608.39 Flowable Fill Cubic Yard 25 $ - 608.40 Non-reinforced Concrete Wall - 8" Square Face Foot 25 $ - 608.41 Non-reinforced Concrete Footer - 8" Square Foot 25 $ - 608.42 Concrete Staining/Sealing Square Foot 25 $ - 608.43 Expansion and Caulking Lineal Foot 50 $ - 608.44 Joint Sealant (Pavement) Addendum 1 – 7658 Miscellaneous Concrete Annual Page 11 of 12 630.11 Safety Fence Per Roll Per Day 5 $ - 630.12 Light Per Day Per Each 25 $ - 630.13 Advance Warning Flashing or Sequencing Arrow Panel Per Day Per Each 10 $ - 630.14 Variable Message Board Per Day Per Each 10 $ - 630.15 Traffic Control Supervisor Per Day 5 $ - 630.16 Traffic Control Supervisor Hour 25 $ - 630.17 Flagging Hour 25 $ - FA1 Laborer Hour 20 $ - FA2 Foreman Hour 20 $ - FA3 Finisher Hour 20 $ - FA4 Form Setter Hour 20 $ - FA5 Skid Steer Hour 20 $ - FA6 Mini Trackhoe Hour 20 $ - FA7 Dump Truck Hour 20 $ - FA8 Backhoe Hour 20 $ - TOTAL COST $ - ADDITIONAL SERVICES EXHIBIT 2 – CLARIFICATIONS & REVISIONS Addendum 1 – 7658 Miscellaneous Concrete Annual Page 12 of 12 REVISIONS 1. Remove and Eliminate: Base Bid Schedule 1; Line Item 626.01; Mobilization – Invoices Under $500 2. Remove and Eliminate: Federal Bid Schedule 2; Line Item 626.01; Mobilization – Invoices Under $500 3. The Special Revision amendment to section 626.01 on page 39 shall be stricken and eliminated and replaced the following: Subsection 626.01 shall be amended to include the following: No mobilization charge will be levied for work completed under this City of Fort Collins Miscellaneous Concrete Bid/s for personnel, equipment and supplies at the project (work order) site in preparation for work on the project. A minimum work charge of $1000 US dollars shall be used in place of the totaled unit prices on and for those project (work order) installations where the project installation cost total is less than $1000 dollars. The project cost total can be from multiple locations within a Project Area. The Project Area shall be defined as all concrete removal and replacement work under this Contract within a city block area to be defined as 500-foot roadway length from the central installation along a public Right-of-Ways or Access Easement to an adjacent installation in which the equipment and man power can moved to the secondary installations without significant remobilization efforts. CLARIFICATIONS 1. Does the City require a Bid Bond to be submitted with the bid? No. 2. Does the City require a copy of our Certificate of Insurance to be submitted with the bid? No. Lineal Foot 50 $ - 608.45 Irrigation Sleeve Lineal Foot 25 $ - 608.46 Dump Fee Ton 25 $ - 630.01 "NO PARKING" Sign With Stand Per Day Per Each 25 $ - 630.02 Vertical Panel Without Light Per Day Per Each 25 $ - 630.03 Channelizing Barrels Per Day Per Each 25 $ - 630.04 Type I/II Barricade Without Light Per Day Per Each 25 $ - 630.05 Type III Barricade Without Light Per Day Per Each 10 $ - 630.06 Size A Sign With Stand Per Day Per Each 10 $ - 630.07 Size B Sign With Stand Per Day Per Each 10 $ - 630.08 Size A Specialty Sign - Cost of Manufacturing Each 2 $ - 630.09 Size B Specialty Sign - Cost of Manufacturing Each 2 $ - 630.10 Cone With Reflective Strip Per Day Per Each 100 $ - Foot 25 $ - 608.15 Pedestrian Access Ramp Square Foot 300 $ - 608.16 Pedestrian Access Ramp, Highback Curb Square Foot 50 $ - 608.17 Truncated Dome Panel Square Foot 25 $ - 608.18 Apron - 8" Square Foot 20 $ - 608.19 Crosspan - 8" Square Foot 20 $ - 608.20 Valley Pan - 6" Square Foot 20 $ - 608.21 Flatwork - 4" Square Foot 25 $ - 608.22 Flatwork - 6" Square Foot 100 $ - 608.23 Replace Flatwork - 1" Additional Depth Square Foot 960 $ - 608.24 Concrete Pavement 8" (Joints Sealed) Square Foot 500 $ - 608.25 Alley Approach - 8" Square Foot 25 $ - 608.26 Enhanced Crosswalk - 10" Tile Red Square Foot 25 $ - 608.27 Enhanced Crosswalk - 10" San Diego Buff Square Foot 25 $ - Foot 5 $ - 604.19 Modified Type 13 Curb Inlet – Materials only - (Frame, Grate, & adjustable bonnet (East Jordan Iron Works 7030 or Equivalent Material) Each 2 $ - 604.20 Concrete Sidewalk Culvert – 4’ opening Each 1 $ - 604.21 Metal Sidewalk Culvert - 2' Opening, Remove & Replace Each 1 $ - Yard 25 $ - 203.02 Excavation - General Over 50 CY Cubic Yard 100 $ - 203.03 Excavation - Walls Only Cubic Yard 25 $ - 203.04 Excavation - New Inlet Each 1 $ - 203.05 Borrow - Less than 100 Ton Ton 25 $ - 203.06 Borrow - Over 100 Ton Ton 100 $ - 208.01 Stormwater Protection - Rock Filled Wattle Lineal Foot 25 $ - 208.02 Stormwater Protection - Recycled Rubber Filled Wattle Lineal Foot 25 $ - 208.03 Stormwater Protection - Straw Bales Each 25 $ - 210.01 Reset Flagstone Square Foot 50 $ - 210.02 Reset Brick Pavers Square Foot 250 $ - 210.03 Adjust Manhole Each 1 $ - ADDENDUM 1 BID SCHEDULE 2 - FEDERAL REQUIREMENTS WITH DAVIS BACON Unit Price Total Item No. Description Unit Contract Quantity 627.02 Truck and Equipment Time Hour 62 $ - 627.03 Trip Hazard Removal - Precision Concrete Grinding (Maximum 2" height) Lineal Foot 600 $ - 630.01 "NO PARKING" Sign With Stand Per Each Per Day 375 $ - 630.02 Vertical Panel Without Light Per Each Per Day 400 $ - 630.03 Channelizing Barrels Per Each Per Day 650 $ - 630.04 Type I/II Barricade Without Light Per Each Per Day 800 $ - 630.05 Type III Barricade Without Light Per Each Per Day 25 $ - 630.06 Size A Sign With Stand Per Each Per Day 350 $ - 630.07 Size B Sign With Stand Per Each Per Day 75 $ - 630.08 Size A Specialty Sign - Cost of Manufacturing Each 2 $ - 630.09 Size B Specialty Sign - Cost of Manufacturing Each 2 $ - 630.10 Cone With Reflective Strip Per Each Per Day 3500 $ - 630.11 Safety Fence Per Roll Per Day 20 $ - 630.12 Light Per Each Per Day 20 $ - 630.13 Advance Warning Flashing or Sequencing Arrow Panel Per Each Per Day 15 $ - 100 $ - 608.15 Pedestrian Access Ramp Square Foot 750 $ - 608.16 Pedestrian Access Ramp, Highback Curb Square Foot 375 $ - 608.17 Truncated Dome Panel Square Foot 100 $ - 608.18 Apron - 8" Square Foot 1450 $ - 608.19 Crosspan - 8" Square Foot 1200 $ - 608.20 Valley Pan - 6" Square Foot 500 $ - 608.21 Flatwork - 4" Square Foot 1,850 $ - 608.22 Flatwork - 6" Square Foot 3,800 $ - 608.23 Replace Flatwork - 1" Additional Depth Square Foot 250 $ - 608.24 Concrete Pavement 8" (Joints Sealed) Square Foot 1,500 $ - 608.25 Alley Approach - 8" Square Foot 1000 $ - 608.26 Enhanced Crosswalk - 10" Tile Red Square Foot 450 $ - 608.27 Enhanced Crosswalk - 10" San Diego Buff Square Foot 450 $ - 608.28 Enhanced Crosswalk - 10" Brick Red, Stamped Square Foot 450 $ - 608.29 Colored Trail with Fibermesh - 5" Yosemite Brown Square Foot 400 $ - 608.30 Mow Strip - 4" x 12" Lineal Foot 150 $ - Foot 10 $ - 604.19 Modified Type 13 Curb Inlet – Materials only - (Frame, Grate, & adjustable bonnet (East Jordan Iron Works 7030 or Equivalent Material) Each 5 $ - 604.20 Concrete Sidewalk Culvert – 4’ opening Each 5 $ - 604.21 Metal Sidewalk Culvert - 2' Opening, Remove & Replace Each 4 $ - 604.22 Metal Sidewalk Culvert - 2' Opening, Materials Only Each 5 $ - 200 $ - 203.01 Excavation - General Less Than 50 CY Cubic Yard 25 $ - 203.02 Excavation - General Over 50 CY Cubic Yard 125 $ - 203.03 Excavation - Walls Only Cubic Yard 100 $ - 203.04 Excavation - New Inlet Each 5 $ - 203.05 Borrow - Less than 100 Ton Ton 50 $ - 203.06 Borrow - Over 100 Ton Ton 125 $ - 207.01 Imported Topsoil Cubic Yard 25 $ - 208.01 Stormwater Protection - Rock Filled Wattle Lineal Foot 100 $ - 208.02 Stormwater Protection - Recycled Rubber Filled Wattle Lineal Foot 25 $ - 208.03 Stormwater Protection - Straw Bales Each 5 $ - 210.01 Reset Flagstone Square Foot 100 $ - 210.02 Reset Brick Pavers Square Foot 250 $ - 210.03 Adjust Manhole Each 10 $ - ItemDescription No. ADDENDUM 1 BID SCHEDULE 1 - BASE BID (Non-Federal) Contract Quantity Unit Unit Price Total