HomeMy WebLinkAboutCHANGE ORDER - BID - 7513 HOT-IN-PLACE RECYCLING PROJECT (2)Fart Collins
Change Order Form
PROJECT TITLE: 2014 Street Mstnl9r er Pregr rn, HI -en -Place
PROJECT NUMBER: 902120 (84 17513)
CONTRACTOR;- CaIIN Repaving (PO 9143663)
CHANGE ORDER NUMBER: 1
In prepeirp change orders Mow m weer ea aepaete MMbemd pemgMpe4 the lolbwing.
1. Reason for change. 2. Oescrphan of change.
3. Change m eenhecl rY1a1, 4. Change In centred time,
1.92. RexvIc"chengacrear
3. The contract cost Mla be e4Ve84ee by $17.11529
4 There MAD be M charge in contmn orris.
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O. % ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
9
ACCEPTED BY:
SUBMITTED BY:
APPROVEDBY:
(PSAMasinp Agem wa S60A0o)
w cvrsow
Fwd"
Frryte Fit
Planning, Development 8 TranWortation
Stmeta Oepenment
625 North Street
P.O Box 560
Fon COIMS, CO $0522.0580
970.221.6515 • Phene
970.221.6270 - Fax
$444.315 00
$0.00
$0 00
IS17.115.29)
$427,199.71
.. DATE:
_ DATE: ✓ D
DATE:
vo . q'tL} 31o%3
0'02 1%2..53 ip10
�endsr 7A2`'�2l
RECONCILING CHANGE ORDER
City of Fort Collins
2014 Hot -In -Place
Cutler Re -Paving
Bid No. 7513
Item
Description
Contract<
'Unit
Unit'Cost
Contract Cost
Actual
Actual Cost
No:
Quantity
quantity
107.12
Tree Protection Labor
640.00
Hour
$ 20.00
$ 12,800.00
259.00
$ 5,160.00
405.01
Hot -In -Place Recycling
125,000.00
SY
$ 2.60
$ 325,000.00
112,363.35
$ 292,144.71
405,02
Rejuvenating Agent
9,950.00
GAL
$ 3.80
$ 37,810.00
8,M5.00
$ 31,749.00
210.01
Adjust Valve Box
50.00
EA
$ 90.00
$ 4,500.00
40.00
$ 3,600.00
210.03
Adjust Valve Box with Ring
25.00
EA
$ 110.00
$ 2,750.00
22.00
$ 2,420.00
210.05
Adjust Manhole with Ring
75.00
EA
$ 160.00
$ 12,000.00
62.00
$ 9,920.00
630.20
Traffic Control
1.00
Lump Sum
$ 25,350.00
$ 25,350.00
1.00
$ 25,350.00
630.30
Variable Message Board
35.00
Per Each/ Per$
195.00
$ 6,825.00
60.00
$ 11,700.00
Day
630.40
Flagging
480.00
Hour
$ 32.00
$ 15,360.00
1,410.50
$ 45,136.00
630.50
Advanced Warning Arrow Board
20.00
1 Each/ Per
$ 96.00
$ 1,920.00
-
$
Da Y
-O.FRIGINAL,CON;T;RACT,AMO-UNT-.
j$ 44:4;315:00
1,427,199:71.
1,
S:\Streets\PMP\Common\p.m.p\PROJECTS\2014\HIP\Pay Applications\CUTLER HIP PAY APP 2014.XLS