HomeMy WebLinkAboutCORRESPONDENCE - RFP - 7368 PROFESSIONAL NETWORK ENGINEERING & IMPLEMENTATIONWork Order Number:OPP-68929
Purchase Order Number:
Project Title: Voicemail Integration with Exchange
Commencement Date: 08/05/2014
Completion Date: 09/30/2014
Maximum Fee: (time and reimbursable direct costs): $9022.45
Project Description: Professional services to integrate vm into MS Exchange
Scope of Services: Minimum discount of 48% on purchase order = $100 K or 45% < $100K list price.
Each site specific project requires a work order authorized by the project manager and Purchasing
agent for release of funds. Invoices to reflect specific work order number and PO number.
Service Provider agrees to perform the services
identified above and on the attached forms in
accordance with the terms and conditions
contained herein and in the Work Order Services
Agreement between the parties. In the event of a
conflict between or ambiguity in the terms of the
Work Order Services Agreement and this work
order (including the attached forms) the Work
Order Services Agreement shall control.
The attached forms consisting of OPP-68929 are
hereby accepted and incorporated herein, by this
reference, and Notice to Proceed is hereby given.
Service Provider:Z"n
By. — VbN
Date:
Submitted By: Bob Singleton
Network Administration Manager
(Project Manager)
Date: 08/05/2014
Approved by: Dan Coldiron
CIO
Date: 08/05/2014
Approved by:
Director of Purchasing & Risk Management
(if over $60,000.)
Date:
■GTR1.
N&P RELENTLESS COMMITMENT
Time and Materials Statement of Work
OPP-68929 6/26/2014
Privileged and Confidential Page 7 of 8
;GTRI.
N RELENTLESS COMMITMENT
Time and Materials Statement of Work
6. Signature Page
GTRI and Client agree that we have read this Statement of Work, its associated Master Sales Agreement,
understand them, and agree to be bound by their terms and conditions. BY SIGNING BELOW, YOU ARE
AGREEING TO THE MSA WHICH IS INCORPORATED HEREIN BY REFERENCE. Additionally, GTRI and Client
mutually agree that a photocopy of this document shall be treated as if it were an original. Client also
agrees that the contents of the document are proprietary, privileged and confidential and should not be
shared with any other entity outside of GTRI and Client.
Requested Project Start Date:
Agreed to:
Printed Name
City of Fort Collins
Signature
Printed Name
Purchase Order #:
Date
Title
Date
OPP-68929
Privileged and Confidential
6/26/2014
Page 8 of 8
,
I
ateria'ls Statement
of Mom
rt
{ �,�` o- �cemail
#1
Integration
e i -with--
Exchange
1
r
-
i
:.
7
1(.
�
l
J
GTRI.
RELENTLESS COMMITMENT
Prepared for:
City of Fort Collins
215 N. Mason St.
Fort Collins, CO 80524
Bob Singleton
bsingleton@fcgov.com
(970) 221-6789
Prepared by:
Global Technology Resources, Inc.
990 S. Broadway, Suite 300
Denver, CO 80209-4274
1-877-603-1984
Fax 1-888-803-6520
www.GTRI.com
SOW Template, Rmsim 5/2O/2014
■GTR1.
W&V RELENTLESS COMMITMENT Time and Materials Statement of Work
Table of Contents
1. Project Overview............................................................................................................................1
3. Design and Deployment Services...................................................................................................3
3.1. Planning and Design..................................................................................................................3
3.1.1. Planning Tasks......................................................................................................................3
3.1.2. Planning and Design Deliverables........................................................................................3
3.2. Deployment.......................................................::.....................................................................3
3.2.1. Deployment Tasks ........................................................ '......................................................
3
3.2.2. Deployment Deliverables.....................................................................................................4
4. Assumptions..................................................................................................................................5
5. Project Pricing................................................................................................................................6
6. Signature Page...............................................................................................................................8
OPP-68929 6/26/2014
Privileged and Confidential Page i of i
■GTRI.
RELENTLESS COMMITMENT
Time and Materials Statement of Work
1. Project Overview
1.1. Understanding Your Needs
WHO: City of Fort Collins
WHAT: Time and Materials Statement of work to update Cisco Unity Connection to deliver voice
messages to Exchange
WHY: Voice message will be accessible in email and via mobile phones in email to improve Client user
experience and responsiveness along with ability to easily forward messages.
1.2. Project Requirements
Based on discussions and documentation provided by City of Fort Collins, the following requirements
were outlined to GTRI.
1. Client needs assistance with setup and deployment with testing for initial deployment group
2. Document migration process so Client can continue process and migrate remaining users
3. Retention policy is 90 days, should be same in Unity Connection and Exchange
4. Admin HandoffTraining— BasicTroubleshootingTraining
5. Would like to have complete by Sept 1. 2014
1.3. Proposal Terms
This Statement of Work serves as confidential written documentation and the basis of understanding for
technical integration services to be performed by Global Technology Resources, Inc. (hereinafter GTRI)
for City of Fort Collins (hereinafter Client). Client understands and acknowledges that the contents of
this Statement of Work are confidential as between GTRI and Client and shall not be shared with third
parties without the written approval of GTRI. Unless otherwise negotiated, the terms and conditions
outlined in the Master Sales Agreement (MSA) govern the work contained herein excluding Federal and
some State and Local agencies. The MSA, located online at www.gtri.com/MSA, is the most current
version and may be updated from time to time.
OPP-68929 6/26/2014
Privileged and Confidential Page 1 of 8
�� GTRI.
N RELENTLESS COMMITMENT Time and Materials Statement of Work
2. Project Coordination
2.1. Project Kick-off
2.1.1. Kick-off Call
• GTRI will conduct a brief project kick-off call prior to work commencing to review the project
scope, requirements and project schedule.
• This meeting will be led by the GTRI Project Coordinator and include the Client and Lead Engineer
or Project Team.
2.2. Project Planning
2.2.1. Schedule
• Project Coordinator will work with the Client to establish a project schedule for required work and
coordinate with internal Resource or Subcontractor Management for scheduling and back-up if
required. (Schedule to be outlined and confirmed in email format)
2.3. Project Control
2.3.1. Project Status and Change Management
• Project Coordinator will provide project statuses as required to the project team and stakeholders
during the duration of the project. This will be in the format of an audio call or email.
• Project Coordinator will act as the project Main Point of Contact and will handle any changes,
extensions or cancellations, and will also facilitate any required escalations.
2.4. Project Close-out
• GTRI will conduct a project closure call to review all completed tasks and components of the
project scope. This will include reviewing any project outstanding items or exceptions and
deliverance and review of any included project deliverable documentation as per this SOW.
• Upon completion of the close-out, GTRI will present the Project Close and Acceptance form to the
client for acceptance and hand-off the project to GTRI Managed Services if purchased.
• This meeting will be led by the GTRI Project Coordinator and include the Client Lead Engineer or
Project Team.
OPP-68929 6/26/2014
Privileged and Confidential Page 2 of 8
GTRI.
RELENTLESS COMMITMENT
Time and Materials Statement of Work
3. Design and Deployment Services
This section identifies the work that will be performed as part of this project. The project will follow the
order of the activities as they are shown below.
3.1. Planning and Design
This portion of the project is a detailed planning and design phase that incorporates both a discovery
and a design component. During this process all elements that potentially impact project success are
examined. Once complete, detailed design recommendations and a project implementation schedule
are created that will ensure the proposed solution meets the Client's requirements.
3.1.1. Planning Tasks
Planning and Design Session with Client
Verify UC and Exchange requirements
Client will create/verify service accounts for Exchange connection
Design for resiliency
Verify capacity by reviewing Unity Connection usage
• Plan basic documentation on how the voice messages will be delivered including diagram with
flow and authentication dependencies shown.
Document high level plan for migrating and testing pilot group
3.1.2. Planning and Design Deliverables
Below are the deliverables GTRI will provide as part of the planning and design.
GTRI will provide documentation as defined in the planning and design tasks
GTRI will detail any modifications to the project design, assumptions and costs identified during
the planning and design and provide any required project change orders
3.2. Deployment
This section of the Statement of Work covers the work that will be performed during the deployment
phase of this project. This covers all phases of the deployment of the solution.
3.2.1. Deployment Tasks
GTRI will deploy according to planning with testing and verification.
GTRI will provide administration training and review documentation for Client to complete migration of
users.
GTRI will provide basic troubleshooting and verification training to Client Staff.
OPP-68929 6/26/2014
Privileged and Confidential Page 3 of 8
�GTR1.
RELENTLESS COMMITMENT Time and Materials Statement of Work
3.2.2. Deployment Deliverables
Below are the deliverables GTRI will provide as part of the deployment.
• GTRI will implement the solution as identified in the statement of work
• GTRI will provide documentation as defined in the deployment tasks
• GTRI will provide information regarding the verification tests run on the installed components that
are a part of the project and the results of those tests
• GTRI will provide training as outlined in this statement of work
5PP-68929 6/26/2014
Privileged and Confidential Page 4 of 8
"GTRI.
Nfttf RELENTLESS COMMITMENT
Time and Materials Statement of Work
4. Assumptions
This section of the statement of work covers the assumptions that are made as part of this project.
These assumptions include tasks that the Client will agree to perform as part of this project. These
assumptions will also include what items are in scope and out of scope for this project.
General Assumptions
• Client will provide GTRI with a single point of contact or key staff necessary for completion of the
project.
• All communications for project details including scheduling, planning and work changes must be
communicated from the client point of contact to the GTRI primary point of contact.
• Client will provide GTRI with information about their currently deployed IT infrastructure as
applicable to this project. The Client will provide information to GTRI about sites of operation,
WAN circuits, Network topology, IP Telephony system information, and all IT computing systems.
• Client will work with GTRI to gather all data necessary for the work to begin on the first day of the
project.
• Client will ensure all appropriate power/environmental requirements are provided to the specific
project needs and environmental standards are being met prior to start date. This includes rack
space, power and cooling. Client will verify all cabling requirements are completed prior to the
beginning of the project.
• Client will clearly identify in writing to GTRI in advance of any Services to be provided hereunder
all Client Property that will be placed under control of GTRI during the time in which the Services
under this SOW are provided. This list will be confirmed in writing during the project kickoff
meeting and maintained and updated in writing as necessary by Client through the life of the
project.
Project Assumptions
• Engineering may be done remotely or on -site as determined during kick-off meeting, pricing
includes rate for one way travel for 5 days on -site.
• No additional hardware or licensing is required.
OPP-68929 6/26/2014
Privileged and Confidential Page 5 of 8
;% GTRI.
% RELENTLESS COMMITMENT Time and Materials Statement of Work
5. Project Pricing
This is a Time and Materials engagement with a minimum commitment of four (4) hours for each
occurrence of on -site services performed by GTRI. Client agrees that requirements and completion
metrics cannot be clearly defined at this time and that GTRI will be performing work on a best -effort
basis. GTRI will complete as much of the requested work requirements as possible using appropriate
resources, but does not guarantee completion under any fixed amount of time.
If GTRI completes the work in less time than stated in this agreement, GTRI shall only bill actual time
accrued. If completion of project scope requires more time than originally estimated, GTRI will provide
the additional time estimate which must be approved by Client via email or separate signed document
containing the same information.
Start date will be determined by availability of the GTRI resources and readiness of the Client. If
requested, GTRI will attempt to provide the appropriate resources as quickly as possible. GTRI requires a
two week time period from the date of this signed agreement (and from each subsequent request for
resources) to confirm resource availability and possible start date.
GTRI Resource
Rate
Estimated Time
Price
IP Telephony Engineer Level 3
$144.30/hr.
34
$ 4,906.20
SV-IPT3
IP Telephony Engineer Level 3
$216.45/hr.
8
$ 1,731.60
SV-IPT3 (Non -Business Hours)
IP Telephony Engineer Level 3
$144.30/hr.
8
$ 1,154.40
SV-IPT3 (Travel Time One Way,
5 trips)
Project Coordinator Level 3
$ 108.10
10
$ 1,081.00
SV-PC3
Subtotal:
$ 8,873.20
Estimated Travel Expenses - Billed as Actual:
$ 149.25
Total Price:
$,9,022.45"-
Engineering time used outside of normal business hours, Monday through Friday, Sam - 5pm, will be
billed at the following rates:
Non -Business Hours and Weekends: 150%of applicable rate
Holidays: 200% (Dependent on availability)
All prices are quoted in U.S dollars. Prices do not include tax, freight, or customs charges. The services
pricing for this agreement is good for 90 days from the date it is issued. If the proposed start date for the
project is greater than 90 days from the creation of this document then this document will potentially
need to be revised.
OPP-68929 6/26/2014