Change Order Form
PROJECTTITLE: N.College - Rear Access Rd.
PROJECT NUMBER: 400903961.3
CONTRACTOR: Interwest ConsullIng Group (PO #9132530)
CHANGE ORDER NUMBER: 1
n preparing change orders show in order as separate numbered paragraphs the g:
1. Reason for change. 2. Descrjptlonofchange.
3. Change in contract cost 4. Change in contract time.
1&2. See attached sheet for detall.
3. The contract cost will increase by
4. There will be no change in contract time.
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % THIS CHANGE ORDER
TOTAL C.O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
ACCEPTED BY:
REVIEWED BY:
SUBMITTED BY
4,480.00
11.79%
11.79%
$38,000.00
$0.00
$0.00
$4,480.00
$42,480.00
/9 h" AA/ DATE:
(Con or's epresentativ )
U/ i6 DATE:
(En ine�
1) DATE:
(Pro)e a alger)
APPROVED BY: DATE: 8 5 t Y
/ epartment Head)
APPROVED BY: DATE:
(Purchasing Agent over $60.000)
ar Contractor
Putds"
Project Re
July 25, 2014
Mr. Kyle Lambrecht
City of Fort Collins
281 College Avenue
Fort Collins CO 80522
RE: N. College Avenue West Access Drive
Additional Service Request #1
Dear Kyle,
Please accept this request for additional services in the amount of $4,480 for the West Access Drive project
based on our previous discussions.
Summary
The Interwest Team provided additional services as further described below to include stormwater
management design services.
Additional Services
Task 1—Stornnvnter Management: Interwest was requested to design a storm drainage retention pond on
the existing City of Fort Collins property west of N College just south of the Brew Property to offset the
flows in the existing Dry Creek pipe network to N. College Avenue. This pond was intended to alleviate
flows to the mainline system within N College while providing water quality for the proposed west access
road with the understanding that there was no viable outfall to discharge runoff from the pond. Upon
review of the retention pond design, city stormwater staff requested that the pond be redesigned to a dry
pond with an outlet to old Dry Creek which required a complete redesign of the system and outfall
culverts.
Interwest Labor Fee; $4,480
Change Order 41Total $4,480
Thank you for your consideration of this request. Please call me at 970-460-8487 if you have any questions or
need any additional information.
Sincerely,
lad
Robert Almirall, PE
Senior Project Manager