Loading...
HomeMy WebLinkAboutCHANGE ORDER - RFP - 7394 N COLLEGE IMPROVEMENTS PROJECT - CONIFER TO WILLOX (2)Of Planning, Development & Transportation FV Eng modnq �/C1pt'■�hr/ ■ V Colh nS 811rkN, Cofto Avenue . �Engln�eerin'g` P.O. Box 880 Fort Collins, Co 80522.0580 070.221.9605 970.221.837a - fax Change Order Form PROJECTTITLE N. College, Conifer to Wlllox PROJECT NUMBER: 400903960.3 CONTRACTOR: Interweat Consul8ng Group (PO #9124822) CHANGE ORDER NUMBER: 2 n preparing change orders snow in oraer as separate numbered paragraphs the talovAng: 1. Reason forchange. 2. Description of change. 3. Change In contract cost. 4. Change in contract time. 1&2. See attached sheet for detail. 3. The contract cost will Increase by $ 32.041.00 4. There will be no change In contract time. ORIGINAL CONTRACT COST $675.649.67 TOTAL APPROVED CHANGE ORDERS $39,203.06 _ TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER .. $32,041.00 .. TOTAL % OF THIS CHANGE ORDER 4.74% TOTAL C.O. % OF ORIGINAL CONTRACT 10.5411. ADJUSTED CONTRACT COST $746,893.67 (Assuming an change orders approved) ACCEPTED BY: REVIEWED BY: SUBMITTED BY: / d-lij (.(� 0 DATE: (Con ctoes a E sentativ) `, (J T DATE: -04 ( e DATE (Pro) tanager) APPROVED BY:I(%1j/},a DATE: 8 • S• L�/ Department Head) APPROVED BY: (Purchasing Agent over $60,000) ca Cordndw Puniueinp PMJW Fk DATE: July 24, 2014 Mr. Kyle Lambrecht City of Fort Collins 281 College Avenue Fort Collins CO 80522 RE: N. College Avenue — Conifer to Willox Change Order Request #2 Dear Kyle, INTERW GST CONSULTING GROUP Please accept this request for additional services in the amount of $32,041 for the North College — Conifer to Willox Improvement Project based on our previous discussions. Summary The Interwest Team will provide additional services as further described below to include design modifications. Additional Services 1. Design Modifications Task I — Conifer SlorinDrain Oulfall: Interwest and AECOM evaluated design alternatives related to the drainage outfall for the east side of N College Ave. In order to avoid crossing conflicts with the existing Century Link Duct Bank, an alternative design along Conifer was designed in general conformance with the future NECCO system. This system was coordinated with city Stormwater and a portion of the costs for construction will be shared between departments. AECOM scope includes design and modeling of the system. Interwest scope includes plan preparation/dra8ing and project management. Interwest Labor Fee: S 3,112 AECOM Labor Fee: S 5,820 Interest Reimbursable Expenses: $ 100 AECOM Reimbursable Expenses: $ 984 Task Subtotal $10,016 Task 2 —CDOT Bid Items: Interest and AECOM updated the plans and specifications to follow CDOT nomenclature as requested by the State representative at the FOR meeting. These changes required the bid items to follow standard CDOT names and pay procedures unless a Special Provision was developed for each bid item. This approach is inconsistent with previous local agency oversight projects by CDOT due to a recent change in the LArepresentative. Interwest Labor Feet S2,264 AECOM Labor Fee: $iM45 Task Subtotal $5,409 Task 3 — Waterline Design: Subsequent to the design of the storm sewer system at the Conifer and Hickory intersection, it was determined that the existing City of Fort Collins 8-inch waterline should be abandoned in place and a new line installed that would not conflict with the proposed stoma drainage system. Interwest prepared a waterline plan and profile and coordinated the design with the appropriate utility department staff. AECOM revised the previously designed storm system alignment to coincide with the updated waterline. Interwest Labor Fee; $1,368 AECOMLaborFee: $_1m Task Subtotal $3,263 Task 4—Drainage Ou fall Modeling: The initial scope of work had assumed the storm drainage system design and modeling for Phase 1 had included the west half of N College between Hickory and Willox. It was later determined that this segment of the corridor had not been analyzed or included in the Phase 1 pipe network. Stormwater staff requested that AECOM model the entire system between Willox and the Poudre River cattail, including the changes associated with the NECCO split flow system. This required additional analysis, modeling and updates to the Drainage Report. AECOM Labor Fee: $6,930 Task S — Raised Medlar Design. Subsequent to the State FOR meeting it was determined that the previously designed double curb system would not be acceptable by CDOT along a roadway in their state highway system. Alternative curb designs were analyzed and presented to CDOT for approval. The accepted 12 inch battered barrier curb system was incorporated into the plans including all appropriate plans, details, bid tabulations and specifications. In addition this task included the design of a dual median underdrain system by AECOM as requested by CDOT to replace the previously designed center drain. Interwest Labor Fee: $2,688 AECOM Labor Fee: $91E8 Taslt Subtotal $4,583 Task 6 — Dry Utility Designs: Interwest prepared detailed plans, profiles and cross sections for the installation of the proposed Traffic Fiber and Xcel Energy gas line along the west side of N College. The design of dry utility mains is not typical and was not anticipated in the initial scope of work; however, due to the numerous utility crossings and constraints along the corridor, Interwest was requested to facilitate the design on behalf of the city and the utility providers. Interwest Labor Fee: $1,840 Change Order #2 Summary: Interwest Total $11,372 AECOM Total $20.669 Change Order #2 Total $32,041 Thank you for your consideration of this request. Please call me at 970-460-8487 if you have any questions or need any additional information. Sincerely, lad Alm Robert Almirall, PE Senior Project Manager