Loading...
HomeMy WebLinkAboutCORRESPONDENCE - BID - 7417 ASPHALT SURFACE TREATMENT PROJECT01 /C,(uu 3� A -ONE ROCKY MOUNTAIN CHIPSEAL'RIW PAVEMENT www.a-lchipseal.com www.rockymountainpavement.com Customer Attention Date City of Fort Collins Mike Breeze 07/28/14 281 College Ave. (970) 224-6061 fc Proposal # Fort Collins, CO 80522- Mbreeze @ 9ov.com 16423 Proposal for Operations Services - Oak & Remington - Fort Collins Item# Description Qnty/Unit Unit Price Total Price Option# 1 Oak & Olive Lot Maintenance 01 Infrared - (5) Oak Lot & (1) Olive Lot 6 EA $135.00 $810.00 Repair potholes and damaged asphalt using the infrared method of asphalt pavement patching. These areas are marked onsite with fluorescent marking paint. (Each infrared patch repair is approx. 5'x7') The infrared process includes: 'Clean the damaged areas of all dirt and debris. -Heat the asphalt to a working temp of 300 F by the infrared process. 'Rake heated area and remove any deteriorated asphalt. 'Add new asphalt 'Compact with a vibratory roller. 'Clean-up. ................................................................................................................................................................................... 03 Slurry Seal 9,300 SY $3.55 $33,015.00 Type II Slurry in place on existing asphalt pavement. `AII labor, material, equipment shall be fumished. •AII work shall be done in accordance with the Standard Specifications for Slurry Seal Applications. "Slurry is a rigid product this product will have reflective cracking, scuffing and aggregate shedding. The benefits of this product are that it will reduce oxidation, slow water damage, extend the life of the pavement, and beautifies the surface area. ................................................................................................................................................................................... 04 Mobilization 1 HR $.00 $0.00 Mobilization to and from the jobsite. 05 Striping Same as Existing Price includes 350 If of red curb 1 EA $2,145.00 $2,145.00 ................................................................................................................................................................................... Accepted_ Total for Option# 1 $35,970.00 �r d - 7 (//7. A-1 Rockv Mountain Pavement Proposal# 16423 Page 1 of 3