A -ONE ROCKY MOUNTAIN
CHIPSEAL'RIW PAVEMENT
www.a-lchipseal.com www.rockymountainpavement.com
Customer Attention Date
City of Fort Collins Mike Breeze 07/28/14
281 College Ave. (970) 224-6061
fc Proposal #
Fort Collins, CO 80522- Mbreeze @ 9ov.com
16423
Proposal for
Operations Services - Oak & Remington - Fort Collins
Item# Description Qnty/Unit Unit Price Total Price
Option# 1 Oak & Olive Lot Maintenance
01 Infrared - (5) Oak Lot & (1) Olive Lot 6 EA $135.00 $810.00
Repair potholes and damaged asphalt using the infrared method of asphalt pavement
patching. These areas are marked onsite with fluorescent marking paint.
(Each infrared patch repair is approx. 5'x7') The infrared process includes:
'Clean the damaged areas of all dirt and debris.
-Heat the asphalt to a working temp of 300 F by the infrared process.
'Rake heated area and remove any deteriorated asphalt.
'Add new asphalt
'Compact with a vibratory roller.
'Clean-up.
...................................................................................................................................................................................
03 Slurry Seal 9,300 SY $3.55 $33,015.00
Type II Slurry in place on existing asphalt pavement.
`AII labor, material, equipment shall be fumished.
•AII work shall be done in accordance with the Standard Specifications for Slurry Seal
Applications.
"Slurry is a rigid product this product will have reflective cracking, scuffing and aggregate
shedding. The benefits of this product are that it will reduce oxidation, slow water
damage, extend the life of the pavement, and beautifies the surface area.
...................................................................................................................................................................................
04 Mobilization 1 HR $.00 $0.00
Mobilization to and from the jobsite.
05 Striping
Same as Existing
Price includes 350 If of red curb
1 EA $2,145.00 $2,145.00
...................................................................................................................................................................................
Accepted_ Total for Option# 1 $35,970.00
�r d - 7 (//7.
A-1 Rockv Mountain Pavement Proposal# 16423 Page 1 of 3