HomeMy WebLinkAboutPrebid - BID - 7654 WESTSIDE ACCESS ROAD - NORTH COLLEGE ROAD IMPROVEMENTS1
11
West Side Access Road
North College Road Improvements
BID NO. 7654
PRE-BID CONFERENCE
June 6, 2014
10:00 AM
215 N. Mason Street
Training Room 2E
City of Fort Collins
Engineering Dept.
Capital Improvements Program
22
INTRODUCTIONS
• Engineering:
• Capital Projects Program:
• Dean Klingner – Capital Projects Manager 221-6511
• Kyle Lambrecht – Project Manager (Design) 221-6566
• Randy Maizland – Project Manager (Construction) 218-5658
• Matt Baker – Project Manager (Construction) 222-0748
• Joe Crabill - Construction Inspector 222-1134
• Purchasing:
• John Stephen - Purchasing Agent 221-6777
• Consultant Engineer:
• Interwest Consulting Group
• Bob Almirall 970-460-8487
2
33
ATTENDANCE
• Please be sure to register
• BID OPENING
• When: June 18, 2014 @ 3:00 P.M.
• Where: 215 North Mason Street (2nd
Floor)
44
Vicinity Map
3
55
Vicinity Map
66
IMPORTANT CONTRACT DATES:
• AWARD CONTRACT
• Approximately June 23, 2014
• PRE-CONSTRUCTION MEETING
• Mandatory Meeting Prior to Start of Construction
• Date to be determined after contract is awarded
• CONSTRUCTION START DATE
• Approximately July 7, 2014
• SUBTANTIAL COMPLETION
• 60 calendar days
• FINAL COMPLETION
• 15 Calendar days after Substantial
4
77
SUMMARY OF WORK
West Side Rear Access Road Improvements:
• 1. Clearing and Grubbing
•2. Removals
• 3. Erosion Control
• 4. Grading and paving
• 5. Water quality/detention pond
• 6. Fencing and gates
• 7. Private light relocations and installations
88
HIGHLIGHTS FROM GENERAL CONDITIONS AND
GENERAL REQ’S:
• PROJECT MEETINGS:
• Once a week. Location and time to be determined.
• Agree to weekly quantities
• PROGRESS AND SCHEDULE REVISIONS:
• Prior to construction, initial schedule must be submitted and
approved
• Schedules shall be updated weekly
• Record Drawings Plan Set
• Contractor will be required to keep record drawings
• Will be submitted to the City at the end of the project
5
99
Highlights from Specifications
1010
Section 202 Removals
1235 N. College
6
1111
Section 202 Removals
1235 N. College
Remove Wood Fence
Sidewalk C&G
Remove Chain Link
Saw cut and remove asphalt
Small section of wood fence removal at NE corner of Valley Steel property.
Will need temporary security fence. Paid
with LS traffic control.
1212
Section 202 Removals
1235 N. College
Relocate private lights. Coordinate with
owner for new locations.
7
1313
Section 202 Removals
1295 N. College
1414
Section 202 Removals
1295 N. College
Clear & Grub
Tree Removals
8
1515
Section 202 Removals
City of Fort Collins Property
1616
Section 202 Removals
City of Fort Collins Property
• Clear and Grub
• Protect Existing
Trees
• Trees to be trimmed
by others
Remove Ex. Headwall and Tree Stump
9
1717
Section 202 Removals
Brew Property
Clear and Grub
1818
Section 202 Removals
1319 N. College
10
1919
Section 202 Removals
1319 N. College
• Remove Chain Link
• Protect Wood Fence
• Clear and Grub
• Salvage Chain Link
• Temporary Security Fence – Paid with Traffic Control
2020
Section 202 Removals
1475 N. College
11
2121
Section 202 Removals
• Remove Chain 1475 N. College
Link
• Clear and Grub
• Remove 4 – Base
Post Foundations
2222
Section 202 Removals
1505 N. College
Removal of Barb Wire Fence and Trees
Clear and Grub
12
2323
Section 202 Removals
Hibdon Court
Remove Existing Asphalt
Remove Existing Gravel (Incl. in Unclassified Ex.
Protect Existing Inlets (Modify South Inlet)
2424
Section 202 Removals
Miscellaneous Debris Removals
• 1319 N. College
• 1475 N. College
• 1505 N. College
The City has notified property owners that all private property
must be removed by July 4th. Any miscellaneous debris left behind or not
moved may need to be relocated or removed and disposed of by the
contractor . We anticipate this may occur at the following locations:
13
2525
203 Unclassified Excavation – 3684 CY
o Established, plan quantity. Payment will be plan quantity. Any
removals beyond plan limits by contractor will not be paid by
the City
EARTHWORK
2626
EARTHWORK
2.7 AC-FT Pond
No Export
2.7 AC-FT Pond 888 CY Topsoil
Strip, Stockpile, Place
Excavated soil to be
spread across west side of
City property.
14
2727
SECTION 208 – Erosion Control
More than an acre of disturbance. SWMP plan required by the State to
be obtained and managed by the contractor
LS Erosion Control Includes:
1. All devices and BMP’s
2. Supervisor Duties
3. Inspection Duties
Concrete Wash Out and Vehicle
Tracking Pad Paid Separately
• Pond area to be drill seeded
• All other areas hydro-seeded
2828
HMA AND CONCRETE PAVING
• 403 Hot Mix Asphalt (Grading S) (75) (PG 64-22) – 1732 Tons
• 609 Concrete 12” Wide Ribbon – 3765 LF
• 304 Class 5 Aggregate Base Course – 2704 Tons
• 412 Concrete Drive Approach (8 Inch) - 28 SY
200 LF Rock Drain
15
2929
Drainage Structures
• 63 LF - 8 INCH PVC
• 40 LF - 12 INCH RCP
• 24 LF - 24 INCH RCP
• 48 INCH Manhole
• Concrete End Sections
• Rip-Rap
3030
Chain Link Fencing
1650 LF Chain Link Fence (6 Foot)
16
3131
Chain Link Gates
9 Swinging Gates
4 Large Sliding Gates
Please read the specification for
Gates. CDOT M-Standards will be
followed.
Shop Drawings Required
Cantilever Gates May Be
Considered
3232
Private Light Standards
210 Reset Private Light Standard – 4 EA
Install New Lights – 3 EA at 1475 N. College
City to furnish lights. Contractor to install
lights on new foundations and connect
wiring. Contractor to pull required permits.
17
3333
Thanks For Attending!
• Any Questions or concerns can be addressed to:
• John Stephen
• Phone: (970) 221-6777
• Email: jstephen@fcgov.com
OR
• Randy Maizland
• Phone: (970) 218-5658
• Email: rmaizland@fcgov.com