Loading...
HomeMy WebLinkAboutPrebid - RFP - 7620 DRAKE & SHIELDS INTERSECTION IMPROVEMENTS PROJECT1 Welcome to the Pre-Proposal Meeting for: Drake and Shields Intersection Improvement Project (Bid # 7620) March 21, 2014 2 Key Dates and Facts • Proposals Due – April 8, 2014 at 3:00 pm (Our Clock) • Eight (8) Copies – Written or Electronic o City can Receive up to Twenty-Five (25) MB Files • Twenty-Five (25) Page Maximum o Page Count Exclusive of Covers / Dividers o 11x17 Sheets Count as One (1) Page o Cover Letter is not Considered in Page Count 3 Introduction / General Information • Seeking single design services consultant for delivery of intersection improvements • Inclusion of Shields Street North and South bound Right Turn Lanes • Installation of ¾ movement at Shields and Davidson • No DBE for the design phase • Design fee’s not factored into selection process • Federal funded project with local match 4 Required Elements • Design sufficient storage and radii in right turn lane movement for both directions of Shields Street. • Improve air quality through reduced vehicle wait time • Improve safety for vehicles, bicycles and pedestrians (bicycle accidents have been reported at both intersections) 5 Required Elements • Design and construct utility improvements with potential water quality features • Design any applicable landscaping, irrigation and urban design elements • Design and construct the project in a sustainable fashion which balances the environmental, social and economic needs of the City and adjacent land owners 6 Funding Summary Funding Summary TABLE Funding Source Funding Amount Federal Hazard Elimination Grant (through CDOT) $ 887,400 Building on Basics Intersection Fund (City) $ 98,600 Total Anticipated Funding $ 986,000 7 Location / Proximity Factors – Major Arterial / Arterial Intersection with an Average Daily Traffic count of 53,000 vehicle – High pedestrian and cyclist activity – Close proximity to CSU Campus and Vet Hospital, Rocky Mountain High School, Transfort Bus route 8 Location Photos Shields Southbound Shields Northbound 9 Location Photos Shields / Davidson 10 General Project Schedule Project Kick-Off & Prelim Engineering May, ‘14 – Fall, ‘14 Final Engineering Fall, ‘14 -- Winter, ‘15 Right-of-Way Acquisition Summer, ‘14 – Spring, ‘15 Advertise for Construction April, ‘15 Begin Construction June, ‘15 11 Quality Assurance / Quality Control • The Consultant Team is Fully Responsible for the QA / QC of the Plans, Specifications, Cost Estimates and Constructability of the Design • Please Include the Following in Your Proposal: o QA / QC Processes o Methods for Design Support During Construction o Accountability 12 Questions? • Please address questions through e-mail to: John Stephen jstephen@fcgov.com - and - Tracy Dyer tdyer@fcgov.com • RFP Download Available @ www.fcgov.com/eprocurement