EXHIBIT "A"
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
and
Biobabitats
July 23, 2014
Work Order Number: NAD — 1965 :Modification
Project Title: Construction of Phase 2 Restoration at N10lurn Natural Area
Commencement Date: Ruh'24.'014
Completion Date: .August 31. 1014
Maximum Fee: 527,000.00
Project Description: See attached letter.
Scope of Services: See attached letter.
Service Provider agrees to perform the services
identified above and on the attached forms in
accordance with the terms and conditions contained
herein and in the Services Agreement between the
parties. In the event of a conflict between or
ambiguity in the terms of the Services Agreement
and this work order (including the attached forms),
the Services Agreement shall control.
Service Prov er
By: 1 6
Date:
APPROVAL:
Director of Purchasing
The attached forms consisting of zero (0) pages are
hereby accepted and incorporated herein by this
reference, and Notice to Proceed is hereby given.
City of Fort Collin
By:'�
Date:
Biohabitats
SOUTHERN ROCKY MOUMAIN BIOREGION
1732 Wazee Street
Suite 209
Denver, CO 80202
July 23, 2014
Rick Bachand
Project Manager
Fort Collins Natural Areas Program
PO Box 580
Fort Collins, CO 80522-0580
PROJECT: McMurry Phase 2 Restoration Construction
Scope and Fee Modification
PROJECT NO. NAD-1965 (Bio No: 10910-05)
Dear Mr. Bachand,
Per your request, this letter proposal describes our scope of work and fee to conduct additional
construction activities needed to address high water impacts which occurred this spring. To provide extra
protection against floodplain scouring during large flow events and to provide additional stabilization while
vegetation has a chance to become established, we are proposing the installation of buried riprap in the
floodplain at the scour location. It will consist of buried Class 3 riprap approximately 5-feet wide and 3-feet
deep extending parallel to the river.
As reviewed with Rachel Steeves, Marsha Hilmes-Robinson, and Mark Kempton today in our plan -in -
hand field meeting, the scope of work will include:
• Raising the elevation of the bank at the Poudreometer and lowering the elevation of areas just
downstream;
• Adding overbank protection in the scour area south of the west pond (per the design detail and analysis
memorandum dated 7/17/2014) and transplanting willows on both sides of the riprap;
• Excavating the main deposition area in the west pond to 4973.5 (even with design water level) and using
the material to fill scour areas south of the west pond and at the headcut
• Regrading to shift the low point between the ponds to be south of the power pole and filling scour areas
with cobble, and;
• Extending boulder toe in the downstream reach and transplant willows.
We expect to begin the earthwork on July 24 or 25, depending on final approval from Marsha. Our fee to
conduct the additional work is $27,000.
Thank you for your consideration of this request and for the opportunity to continue to assist you on this
project. If you have any questions or concerns, please call Mike Lighthiser or Vince Sortman at (303) 477-
0660.
Sincerely,
Claudia Browne, Project Manager