Loading...
HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9134834!-#0 )4"ALe73333333333333333333333333333333333333333333 EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS and Biobabitats July 23, 2014 Work Order Number: NAD — 1965 :Modification Project Title: Construction of Phase 2 Restoration at N10lurn Natural Area Commencement Date: Ruh'24.'014 Completion Date: .August 31. 1014 Maximum Fee: 527,000.00 Project Description: See attached letter. Scope of Services: See attached letter. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms), the Services Agreement shall control. Service Prov er By: 1 6 Date: APPROVAL: Director of Purchasing The attached forms consisting of zero (0) pages are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given. City of Fort Collin By:'� Date: Biohabitats SOUTHERN ROCKY MOUMAIN BIOREGION 1732 Wazee Street Suite 209 Denver, CO 80202 July 23, 2014 Rick Bachand Project Manager Fort Collins Natural Areas Program PO Box 580 Fort Collins, CO 80522-0580 PROJECT: McMurry Phase 2 Restoration Construction Scope and Fee Modification PROJECT NO. NAD-1965 (Bio No: 10910-05) Dear Mr. Bachand, Per your request, this letter proposal describes our scope of work and fee to conduct additional construction activities needed to address high water impacts which occurred this spring. To provide extra protection against floodplain scouring during large flow events and to provide additional stabilization while vegetation has a chance to become established, we are proposing the installation of buried riprap in the floodplain at the scour location. It will consist of buried Class 3 riprap approximately 5-feet wide and 3-feet deep extending parallel to the river. As reviewed with Rachel Steeves, Marsha Hilmes-Robinson, and Mark Kempton today in our plan -in - hand field meeting, the scope of work will include: • Raising the elevation of the bank at the Poudreometer and lowering the elevation of areas just downstream; • Adding overbank protection in the scour area south of the west pond (per the design detail and analysis memorandum dated 7/17/2014) and transplanting willows on both sides of the riprap; • Excavating the main deposition area in the west pond to 4973.5 (even with design water level) and using the material to fill scour areas south of the west pond and at the headcut • Regrading to shift the low point between the ponds to be south of the power pole and filling scour areas with cobble, and; • Extending boulder toe in the downstream reach and transplant willows. We expect to begin the earthwork on July 24 or 25, depending on final approval from Marsha. Our fee to conduct the additional work is $27,000. Thank you for your consideration of this request and for the opportunity to continue to assist you on this project. If you have any questions or concerns, please call Mike Lighthiser or Vince Sortman at (303) 477- 0660. Sincerely, Claudia Browne, Project Manager