Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 7392 CIVIL ENGINEERING DESIGN DRAFTING & SURVEY SERVICES ON-CALL (5)EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND INTERWEST CONSULTING GROUP INC. / DATED.. 't Work Order Number: 07-*6pga1ga,0_1q. l Purchase Order Number: ProjectTitle: 7392 CIVIL ENGINEERING, DESIGN, DRAFTING & SURVEY SERVICES ON -CALL Remington and Laurel Conceptual Civil Design Commencement Date: 7-1-14 Completion Date: 10-1-14 Maximum Fee: (time and reimbursable direct costs): $9,000 Project Description: SEEATTACHED Scope of Services: SEE ATTACHED City P.M. Acceptance Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached for the Professional Services Agreement shall control. one[: Interwest 1 441J- 0 6 . Date. 7-1-14 The attached forms consisting of Two (2) pages are hereby accepted and incorporated herein, by City of Fart Collins this reference, and Notice to Proceed is hereby given. By: Gerry Paul Director of Purchasing and Risk Management (over$60,000.00) Date: RFP 7392 Civil Engineering, Design, Drafting & Survey Services On -Call July 1, 2014 Mr. Tim Kemp City of Fort Collins - Engineering PO Box 580 Fort Collins, CO 80522-0580 Remington and Laurel Conceptual Civil Design Project Description and Scope of Services Dear Tim, Attached is the project scope and description: Description 3NTlRWlST CO NSU ITtNG GROVY Interwest will work with your department as well as BHA and ALTA to create a conceptual plan for the mini - roundabout at Laurel and Remington as a part of the Remington Greenway project This phase of the project will also define the scope for the final construction project (bulb -outs, stormwater treatment facilities, etc.). Once the construction project layout is defined, a second work order for the construction plans will be prepared. Scope of Services 1. Base Map Preparation — Interwest will assemble existing aerial photography, parcel maps, and City Lidar data into a base file for use by the team. Additionally, a base map of the City provided survey will be prepared for the Remington and Laurel Intersection. Estimated Fee: $2,000 2. Remington and Laurel Mini -Roundabout Conceptual Plans — Interwest will work with the City and the Team to create a roundabout layout that is suitable for the intersection and meets the project budget. At this time it is assumed that all work will be in existing right of way, the City will provide pavement design and surveying. Estimated Fee: $5,000 3. Meetings/Coordination(Corridor Scoping — Interwest will attend meetings and coordinate with the team and City. This task includes working with the team to determine locations of bulb -outs and water quality facilities in the corridor and scoping the final construction documents for the project. Estimate Fee $2,000 Total proposed fee - $9,000 Assumptions- 1. Interwest will have no subconsultants on this project. Surveying, environmental services, utility locating and potholing, property acquisition, structural design, landscape architecture, and floodplain modeling will be provided by others (as necessary).Geotechnical exploration and report (with pavement and earthwork recommendations) will be provided by others. 2. Drainage calculations, if required, will be prepared by the City. 3. Specifications and bid documents will not be required at this time. 4. Interwest will not provide CM or CA services. 1218 W. ASH, STE C, WINDSOR. COLORADO80550 TEL 970.674.3300 - FAX 970.674.3303 Schedule We can proceed immediately with the project. Please call me at 970-460-8471 if you have any questions or need any additional information. Thanks, /NJ-1Q ak4l-" Michael Oberlander, PE