Loading...
HomeMy WebLinkAboutCHANGE ORDER - RFP - 7260 PROSPECT ROAD BRIDGE & MULBERRY STREET BRIDGE REPLACEMENT DESIGN SERVICES (3)City of rt Collins Engineering Planning, Development & Transportstto- Englneiring 281 North Collago Avenue P.O. Box am Fort Collins, CO 80522,0580 970.221.6605 970.221,6378• fix Change Order Form PROJECT TITLE W. Mulberry/Prospect Bridge Replacement PROJECT NUMBER: 254902102.3 (RFP H726O) - PO #9116411 CONTRACTOR: KDG Engineering, LLC CHANGE ORDER NUMBER: 3 In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change. 2. Description of change. 3. Change in contract cosL 4. Change in contract time. 1&2. See attached sheet for detail. 3. The contract cost will Increase by $ 41,644.00 4. There will be no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED BY: REVIEWED BY: ACCEPTED BY: ACCEPTED BY: Head) $195.499.00 $27.000.00 $0.00 $41,644.00 21.30% 35.11 % $264,143.00 DATE: 7// I ZQ DATE: 1- -q Ot r'( DATE: 7 APPROVED BY: DATE: (Purchasing Agent over $60,000) w Ca�hacta PL'1U1a91ng Project P9e M KDG Engineering LLC 3500 S. Wadsworth Blvd. Suite 400, Lakewood, CO 80235 Ph.: 720.420.9069 Fax:303.957.5477 K11009 July 3, 2014 Mr. Jin Wang City of Fort Collins Engineering 281 North College Avenue Fort Collins, CO 80521 Subject: Proposal for Additional Environmental and Design Services Fees — Work Order 3 Prospect Road & Mulberry Street Bridge Replacements Dear Jin: As discussed, CDOT has now taken direct involvement in this project for the Mulberry Street bridge replacement. During our last meeting with them, the extent of the environmental services has increased along with the design effort that is required to meet all the CDOT requirements. In addition to CDOT, FHWA has much stricter design and environmental requirements due to the recent flood issues. The extent of the environmental services has also increased due to the findings of the initial environmental evaluation of the site. In addition, the extent of the construction services for the Prospect Road bridge replacement is exceeding our early estimates, primarily due to the extensive urban design features that were added to the bridge. . We are therefore requesting additional funds to complete this project. The attached Exhibit A has the fee proposal for this effort. Please review my fee proposal and scope of services to verify that they are acceptable to you. If you have questions or need additional information, please contact me at 720-420-9069 or e-mail me at skobayashi64@msn.com. Sincerely, Stan Kobayashi, PE Project Manager Attached: Exhibit A, Engineer's Estimate of Fees ® KDG Engineering LLC 3500 S. Wndev Blvd. 801a 400 Lakewood, CO W235 rT:i2a4N9069 skoNs3bJGkdgenVreerinrcwn EXHIBIT A - FEE SCHEDULE - WORK ORDER 3 ENGINEER'S ESTIMATE OF FEES FOR PROJECT CHANGES -COOT REO'D ENVIROMENTAL AND DESIGN ADDTIONS PROSPECT ROAD AND MULBERRY STREET BRIDGE REPLACEMENT 7/112014 LABOR HOURS Scope Item KOG Engineering Piny an Env. Tot His. Labor Expenses Total Fee Sr. BridgeBridge Engr.I Bridge Bridge EIT Engr. Pdnc. Prej' Scientist Billing Rates: $120.00 $88.00 $65.00 $75.00 $140.00 1 $120.00 1 'AODITIONAL�SERVICES�/,„V 1,$4100 0 _;IBB 0? � �"'+90:OY e.� -"a5780.0"� �r 200„ C' ��'(, 80 0, $' ;,�'t,438.0i,D i$411594 00 >-&,$50.00 d--$41,644.00 1A COOT required additional work for environmental and design submittals and reviews. 100.0 88.0 90.0 60.0 20.0 60.0 438.0 $41,594. $50.00 S41,844.00 Total AddendumFees Not to Exceed Hours and Fees 100.0 88.0 90.0 80.0 20.0 60.0 438.0 $41,594.0 $50.00 $41,644.00 Fees $120DO.00 $7744.00 SS 850,00 $8,000.00 $2.800.00 E7,200.00 Total Fees Per Firm $31,594.00 31D,060.00