Change Order Form
PROJECT TITLE: Intersection Priority Study
PROJECT NUMBER: 400901805.521020.3
CONTRACTOR: Muller Engineering Co. (PO #9104357)
CHANGE ORDER NUMBER: 2
n preparing change oraers snow in oraer as separate numbered paragraphs the following
1. Reason for change. 2. Description of change.
3. Change in contract cost. 4. Charge in contracttime.
1&2. See attached sheet for detail.
3. The contract cost will increase by $ 37,485.00
4. The contract lime will be extended through November 1, 2014.
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CI4ANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % THIS CHANGE ORDER
TOTAL C.O. % ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
ACCEPTED BY
( nt 1
REVIEWED BY:
(Engine
SUBMITTED BY:
(Project
APPROVED BY:
( parti
APPROVED BY:
(Purchasing Agent over $60,000)
co: Contractor
Pul "Ing
PK{eG File
24.49%
31.W.
$153,G47.00
$10,876.DD
$0.00
$37.485.00
$201,408.00
DATE: O119 / 701*
DATE: 6 — ( ol — (mil
DATE: G • 19, l7
uMtir:4i
City of Fort Collins
Arterial Intersection Prioritization Study— Phase 2 Scope and Fee
1. Information Gathering and Data Collection/Compilation
Objective: To gather all relevant information and data about each intersection and to gain a
thorough understanding of existing conditions.
Description: The initial task of this project will involve assembling information and data that, for the
most part, has already been collected or is readily available from various sources. Information and
data to be assembled includes:
ata
Source
Peak Period Turning Movement Counts
Fort Collins Traffic Operations
Pedestrian/Bicycle Counts
Fort Collins Traffic Operations
Hourly Link Counts
Fort Collins Traffic Operations
Intersection Crash Records
Fort Collins Traffic Operations
Aerial Imagery
Muller Engineering
Citywide Synchro Model
Fort Collins Traffic Operations
Right -of -Way
Fort Collins GIS
Preliminary List of Potential Projects
Fort Collins Engineering, Transportation
Planning and Traffic Operations
List of Project Stakeholders
Fort Collins Transportation Planning
Construction Cost Data
Fort Collins Engineering and CDOT
Existing Concept Plans and/or
Preliminary Engineering Plans
Fort Collins Engineering
Site Evaluation
Muller Engineering
Muller will review the above information and identify any gaps or anomalies in the data. If additional
information is required, Muller will request supplementary data from the City. During this process,
Muller will also conduct preliminary analyses of the traffic and safety data as a means of examining
existing conditions at each intersection.
Deliverables: Technical Memorandum summarizing base conditions of intersection operations and
crash data.
2. Screening Process
Objective: Use the developed comprehensive methodology to prioritize intersection improvements
based on need and funding opportunities.
Description: The intersection screening process will be a two-step process established during Phase
1 of the Arterial Intersection Prioritization Study. The intent of the Level 1 screening will be to conduct
a broad evaluation of the arterial intersections using both traffic operations and safety analyses with
the latest data from Fort Collins Traffic Operations. This information will be exported from the City s
Signal Timing Synchro model into an Excel spreadsheet. This will be completed for each time period,
to develop an overall composite operational ranking. Muller will use a similar analysis for intersection
crash data exported from the City's Crash Magic program. The intersections will then be ranked
according to their operational and safety assessments. This process will provide a quantifiable
June 3, 2014 Muller Engineering Company Page 1 of 3
City of Fort Collins
Arterial Intersection Prioritization Study — Phase 2 Scope and Fee
analysis and allow the project team to identify the most apparent problem intersections. Screening
results will be reviewed with City staff to ensure the results of this Level 1 screening analysis are
reasonable and that known problem intersections have not been missed during the screening. The
number of intersections that will be carried forward to Level 2 screening will be determined based on
input from City staff and will be in the range of 20-30 intersections.
Identification of Potential Improvements
Using the list of intersections developed from the Level 1 screening process, Muller will develop an
initial list of potential improvement options for each intersection based on the specific operational
and/or safety needs at that intersection. This list may include such items as: adding turn lanes, signal
phasing changes, intersection channelization, reducing crosswalk distance, bike lanes, roundabouts,
ITS devices, bus pull-outs, medians, access management strategies, etc. The Muller team will
endeavor to identify cost-effective Transportation System Management (TSM) strategies that provide
the best "return on investment". Muller will also look to develop strategies for each intersection that
are not necessarily mutually exclusive and can be packaged to match available funding sources.
Muller will identify one or more improvement options for each intersection which will then be used
in the Level 2 screening analysis.
After the Level 1 screening process, Muller will meet with City staff in a workshop session to review
the potential intersection improvements to be carried forward to Level 2 screening. Muller and City
staff will also identify additional problem intersections that may not that be operationally or safety
deficient, but would benefit from the more in-depth analysis conducted during the Level 2 screening.
Level 2 Screening
The Level 2 screening process will provide a more comprehensive evaluation of each intersection that
passed the Level 1 screening. The screening will be applied to these intersections and to the list of
potential improvement projects identified in the preceding subtask. The Level 2 screening will begin
to look at potential fatal flaws, community benefits/impacts, preliminary costs and potential funding
sources. Similar to the Level 1 screening, the evaluation criteria established during Phase 1 of the
Arterial Intersection Prioritization Study will be entered into a spreadsheet as a means of tracking
each criterion and also for conducting sensitivity analyses, matching alternative project scenarios to
the available budget or funding source.
The Level 2 screening process will result in a short list (10) of projects that can be carried forward to
concept design and cost estimating. The Level 2 screening process will also include the re -prioritization
of the intersections previously identified in the study that have not yet entered the design phase.
Outcome/Deliverables: Technical memorandum describing screening methodology and the
prioritization list of projects (10) that could be carried forward to concept design (approximately 20%
design).
3. Documentation
Objective: Revise documentation that packages the alternatives to match available funding sources
and to leverage the City's BOB funding.
Description: Muller will update and revise the previously prepared Arterial Intersection Prioritization
Study Final Report that summarizes the project process, findings and recommendations. Technical
data will be included in an appendix or separate volume. The project's technical evaluation will also
June 3, 2014 Muller Engineering Company Page 2 of 3
City of Fort Collins
Arterial Intersection Prioritization Study —Phase 2 Scope and Fee
be compiled in spreadsheet form to assistthe project team in querying and sorting the data to address
potential project scope and/or funding changes.
Deliverables: Project Final Report (5 copies); One -Page Intersection Summary Reports; Spreadsheet of
Project Evaluation Criteria and Data
4. Project Management
The project management task includes communication and coordination between Muller
Engineering, city staff and project subconsultants. Additional project management tasks include
preparing monthly progress reports to the City's Project Manager. Project Management also includes
one Scoping/Kickoff Meeting, two Progress Meetings, and one Transportation Board meeting.
Fee Estimate
The attached table provides a breakdown of staff hours, labor costs and expenses for each task identified
above. Muller Engineering's total fee for Phase 2 of the Arterial Intersection Prioritization Study is
$37,485.
MULLER ENGINEERING COMPANY -STAFF HOUR AND FEE ESTIMATE
City of Fort Collins
Arterial Intersection Prioritization Study -Phase 2
T,,k
NO.
TOak
OeadPtion
RPurl R fe
jikN-
Task Total
AiMlp91
will
I59
PM
N
I3I
Rrole[t
ERprV
=' U2
Pmfect
E,q N
1m11
=Oe99 r
jF pNll
101 •
Snes�
]01
raaa
Adm1
Mle y,
Tmm,:
1
bOlmOn011 Gntherin Ond 001. COIIKVen
cmhn oM fam 'IC Pob
4
8
16
28
RMewpN PMvn AnPl o apla
I
8
16
28
TPIk$ub1rXM
8
16
32
$6
IIW
2
bq Pr.
Inxll Scrernirg
0
4
24
32
Devcl00 Potenfivll r men[a
]l
20
33
I[M11YMeni
9
2a
00
6I
$170
Taft$ubtrRPl
20
M
61
1)D
$12P
$1S.T/8
3
patementnbn
Po(FOryng OJAIICTOtlerr
4
12
16
Repro[ W[nrneOmlinl
•
20
4
26
$32
ialk$pbtotPl
8
32
4
M
$37$
$61099
4
WOInt M.npPrment
Pmjttl Mpnp9emeM
4
12
16
MeetiMz/1.knpin ,2Pry/ess,l TRemdf
16
16
32
p
s31P
Teeksebwfal
20
Zr
12
8
6s
s34P
$91M
1PIPI HppTs
16
U0
1W
D
4
296
Fee, Brain, Rpfe
TPlpl Expenus
$ON
$]$,nD
SI0,908
$D08
SSbe
53460P
-
SN$
-
Total - - $37,05
Nmez
hp¢nses inrlude mpor[repratlu[[bnaM schiOe mgeage. Repast reproduc[bn bcbtlerstlmh repartzantl $fmL repwua[a [O[al mst of $3T6.
PO other eapeme Wrgmare larrehkk Mbage be[weemm�sultanl9ffce arq rwt Capbs ietlaal mileage rate of $P56/mge applies.
Project Schedule
Assuming a mid -June notice to proceed date, the project completion date would occur on or before
September 30, 2014.