HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 9143405Cityof
Fort Collins
EXHIBIT'A'
WORK ORDER FORM
AGREEMENT BETWEEN THE CITY OF FORT COLLINS
AND VOGEL CONCRETE, INC.
BID NO: 7391
Email work orders to mail(a).vogelconcrete com
DATE: June 12. 2014
REQUESTED BY: Transfort, Emma Belmont
WORK ORDER NO: I,'f`'°1l
PHONE NUMBER: 970-224-6197
BILL TO (name, address, zip): Transfort. PO Box 580 80524
EMAIL ADDRESS: ebelmontlafcgov.com DEPARTMENT: Transfort
PROJECT TITLE/DESCRIPTION: 2014 Stop Improvements
SCOPE OF SERVICES: Install 6 bus stop Pads. COST: $15,000 (estimate)
and upgrade curb ramps nearby that don't
meet ADA accessibility standards
COMMENCEMENT DATE: July 1. 2014
CITY OF FORT COLLINS:
BY: Emma Belmont
� y75- y
COMPLETION DATE: August 15, 2014
DATE: June 12, 2014
Vogel Concrete, Inc: agrees to perform the services identified above and on the attached forms in accordance with the
terms and conditions contained herein and in the Services Agreement between parties. In the event of a conflict
between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms), the
Services Agreement shall control.
VOGEl C, IN
BY:
By: Robert Mosbey
Project Manager
Date: 06/12/2014
By:
Gerry Paul
Director of Purchasing and Risk Management
(over $60,000.00)
Date:
DATE: ii" ra%a — / j/
CC: Purchasing; the attached form(s)consisting of i&; Icy page(s) are hereby accepted and Incorporated herein by this reference,
and Notice to Proceed is hereby given.
Miscellaneous Concrete Annual - Page 1 of 1
System for Award Management
Page 1 of 1
Search Results
Notice: This printed document represents only the first page of your SAM search results. More results may 5e available To print your canplete sea Rh results,
you can download the ME and pant it
N
o records found for current searm.
SFM I Syatem br Award ManagemeM 1.0
Note to all Users: This Is a Federal Government computer system. Use of this
systan constitutes consent to moniNnng at all fimes.
IBM v1. 1792.20140531-1220
z K —1
Glossary
Search
Results
Entity
&tlusion
Sea ch
Fiten
By Record
Status
BY
Functional
Area - Entity
Management
By
Functbnal
Area -
Performance
Information
https://www.sam.gov/portal/SAW?navigationalstate=JBPNS rOOABXdcACJgYXZheC5... 6/17/2014
N
OGE OCLnc ETU'RT COLLINS COLORADO
Bill To:
City of Fort Collins
Transfort
250 North Mason St.
Fort Collins, CO 80524
Attn: Emma McArdle
6330 S. College Ave.
Fort Collins, CO 80525
Estimate
Date
Estimate#
8/21/2013
204
Project Location
Misc. Bus stop Improvements
. P.O.! Work order#
Terms
Representat...
Net 30
JH
Description
Qty
Unit
Cost
Total
Prospect Parkway
I
LS
1,182.00
1,182.00
Rock Creek
P
LS
1,521.00
1,521.00
Harmony/Larkbunting
1
LS
2,089.00
2,089.00
DrakeJKatims
I
LS
1,756.00
1,756.00
Centre Ave.
1
LS
2,090.00
2,090.00
Shields/Ccntre Ave.
1
LS
4,690.00
4.680.00
Total S13,318.00
We propose to famish material and labor -complete in accordance with the above specifications.
All work to be completed in a professional manner and in recordancovith industry standards. Any alteration or deviation from above
specifications must be done in writing.
Acceptance of Proposal: The above prices, specifications and conditions are satisfactory and are hereby accepted. Vogel Concrete, Inc. is
authorized to do work as specified. 1 agree to pay as outlined in the "Terms" stated above.
Date ofacceptetce Signature L, 1�
Phone # Fax # E-mail Thank 1� you for your
970-084-3880 970-226.2657 mailodvogelconcrete.com business.
City of Independent Cost Estimate
F5rt C0LLin5
Date of Estimate: 16-Jun-14
Contract Type:
Existing Contract or PO (Y/N): Y (Vogel Concrete)
Description of Goods (A) or Services IS): Bus Stops- Pad Installations & Ramp
I have obtained the following estimate from;
Published Price List / Past Pricing (dale) -
Engineenng or Technical Estimate (performed by)
Independent Third Party Estimate (performed by)
Other (specify) Based on Blue Spruce projections from Tim Kemp
'Item`#:
,.... "
- �-.Item9esin -tion ,�.i
..
?:_'Ovantt .i
='x*Unit+B`--i'eUntt
Cost-=--.'ETotal:CostSF
lar.
1
Center& Worthington-2 Stops
Instalation of Bus Stop Pad
256
SF
$ 3.33
5852.48
2
Shields & Center - 1 Stop
Instalation of Bus Stop Pad
140
SF
$ 3.33
5466.20
3
Drake 8 Kansas- 1 Slop
Instalation of Bus Slop Pad
196
SF
$ 3.33
$652.68
4
Harmony & Larkbunling - 1 Stop
Instalation of Bus Slop Pad
90
SF
$ 3.33
$299.70
5
Prospect Parkway 8 Midpoint - 1 Stop
Instalation of Bus Slop Pad
66
SF
$ 3.33
$219.78
6
Rock Creek 8 Technology - t Stop
Instalation of Bus Slop Pad
176
SF
$ 3.33
$586.08
7
Associated Ramp Upgrades to ADA Standards
Concrete Curb Ramp
150
SF
$ 11.11
$1.666.50
8
All Bus Stop Locations (7)
Removal of Asphalt
1,074
SF
$ 0.55
$590.70
9
All Bus Stop Locations (7)
Earthwork
924
SF
$ 0.55
$508,20
9
All Bus Stop Locations (7)
Curb & Gutter
104
LF
$ 15,00
$1 555.50
SUBTOTAL OF
VOGEL CONSTRUCTION WORK ITEMS: $7,397.82
ki KCd t?r .. {`.4'k -. ""JM•',
CrvtaiG&YAWork,Descri Ptio.t.3'3 �..y -
Ooanti..
Unit
MU�WI!CdstM
Traffic Control - Labor - Supervision
40
Hr
$ 50.00
$2,000.00
Traffic Control - Labor - Flagging
90
Hr
$ 25.00
$2,250.00
Signage
65
Sign
$ 1.00
$65.00
Traffic Control Bartels
110
Bartel
$ 0,85
$93.50
Reflective Canes
110.
Cone
$ 0.75
$82.50
SUBTOTAL OF TRAFFIC CONTROL: $4,491.00
PROJECT SUBTOTAL: $11,888.82
CONTINGENCY (10%): $1,198.88
TOTAL PROJECT BUDGET: 0 ,,7,70,
C:UumisephenWpeataLLo Wi=r fl%Wnda %Tempm r,Internet File3UComeM.eul1ookR12705NF5YCE- M14 Bus Stop lmpmvemems-6x Stops RampvdssOlue Spmce tbk6I162014
No Text
:/\/»\\m<
\ t� \\\\ \�\� \
_ ��� r7 \w.
� \� .��\:� §
� \� � � \� � \\
4�r'�^'tyy'�ru+ ss.a .. *�> i,,i27'�,. 1 75� ��i:
No Text
�m�cu�srb to etlg>r ofYROW,
sting, alfc y
RW
Pe10w a Sign
6cisting Bus Stop
on light Pale
Transfort Bus Stop Improvements
Rock Creek and Technology, Fossil Ridge High School
Proposed
Relocate Stop to
Red Square
Pave 22' wide
by 6' pad
between existing
detached U walk
East -bound
Existing Deficiencies
• In -accessible bus stop
Proposed Upgrades
• Install a 22' by 8' pad between the curb and detached sidewalk to accommodate ADA
accessibility and passenger amenities such as a shelter, etc.