HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 9143404WORK ORDER
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
VOGEL CONCRETE, INC.
DATED: 06/12/2014
Work Order Number: 1-VOG-4009032.20.90-14
Purchase Order Number:
Project Title: Bike Pads at MAX BRT Stations in Old Town Area
Original Bid/RFP Project Number & Name: 7391 (Annual Concrete Maintenance Contract
Commencement Date: 06/23/2014
Completion Date: 08/08/2014
Maximum Fee: (time and reimbursable direct costs): $3,455.61
Project Description: Installation of multiple Bike--P-ad_areas at MAX BRT stations in the f
Scope of Services:
parking services manager.
Professional agrees to perform the services
identified above and on the attached forms in
accordance with the terms and conditions
contained herein and in the Professional Services
Agreement between the parties. In the event of a
conflict between or ambiguity in the terms of the
Professional Services Agreement and this work
order (including the attached forms) the
Professional Services Agreement shall control.
The attached forms consisting of one W page are
hereby accepted and incorporated herein, by this
reference, and Notice to Proceed is hereby given.
Profession
By:
Date: 06/12/2014
City of Fort Collins
By: RobertMosbev a .
Project Manager '
Date: 06/12/2014
yU'7�5�
By:
Gerry Paul
Director of Purchasing and Risk Management
(over$60,000.00)
Date:
Project Title- Installation of three Bike Pads at WU(
Federal Y/N-Y Work Order Number- BBTsbOom in the Old Town area
Item No.
Description
W.O. Quanta
Unit Price
Total
304.01
a to Base Course less than 5 tons
3
28.35
85.05
W8.22
Flatoak-6'
267
4.0
1M4.7
%8.23
Replace Flalwark-1" Additional Depth
124
0.89
110.36
630.03
Cha nnel'rsin Barrels
So
0.89
44.5
630.16
Traffic Control Su ervisor
VHr
15
39.9
59M
630.17
Flagging
40
26.25
1050
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2903.11
bmments
Mountain NB-124sf laurel NB 83 laurel SB. M.
Mountain NB-124sf of additional concrete
City of Independent Cost Estimate
Fort Collins
Date of Estimate: 16-Jun-14
Contract Type:
Existing Contract or PO (YIN): Y (Vogel Concrete)
Description of Goods (A) or Services (B): Bike Rack Pads
I have obtained the following estimate from;
Published Price List / Past Pricing (date)
Engineering or Technical Estimate (performed by)
Independent Third Party Estimate (performed by)
Other (specify) Based on Blue Spruce projections from Tim Kemp
rltem #
tY 1"et'y?:Location'° =Z,=-MEM1111111ftem,Descn
tion'°'''I:'7"' #
PQi antii -1
. Unit
Unit:Cost
Wotal:Gost
Mountain (NB)
Concrete Pad
112
SF
$ 3.33
$372.96
Laurel (NB)
Concrete Pad
75
SF
$ 3.33
$249.75
Laurel (SB)
Concrete Pad
54
SF
$ 3.33
$179.82
All Locations
Removal of Asphalt
241
SF
$ 0.55
$132.55
SUBTOTAL OF
VOGEL CONSTRUCTION WORK ITEMS: $935.08
'Milm
ram= x C 'Ye". :>Yy-I,",�
Work'Desiii"tiori 4'F,xS$
WQuanti .Ml
1111111111111fiftWO
OUnh'Costi
1iTotallCostB
Traffic Control - Labor - Supervision
15
Hr
$ 50.00
$750.00
Traffic Control - Labor - Flagging
40
Hr
$ 25.00
$1,000.00
'
Signage
0
Sign
$ 1.00
$0.00
Traffic Control Barrels
50
Barrel
$ 0.85
$42.50
Reflective Cones
0
Cone
$ 0.75
$0.00
SUBTOTAL OF TRAFFIC CONTROL: $1,792.50
PROJECT SUBTOTAL: $2, 727.58
CONTINGENCY (f0%): $272.76
TOTAL PROJECT BUDGET: 3 000.34:
C'.\UsemystephenVppOata\Lo lWicmwft\Wndows\Temporary Internet FilestContent 0utlwkPAZ7D5NF5\ICE- 2014 Bike Pads.xlsxBlue spruce tbk611612014
System for Award Management
Page 1 of 1
Search Results
Notice: This printed document represents only Me first page of your sAM search rasuhs. More insults may be ar llable To print your rnmplate search results,
you on download the POF and print it
No records found for current search.
SAM I Systern for Award Management 1.0
Note to all Users: This is a Federal Co ermnent computer System. Use of MLs
system constitutes concert to monitoring a[ all Nees
IBM v1.1]9].1031-I210 ®
® _ --eb9A.gov
Glossary
Search
Results
Entity
Exclusion
Search
Filters
By Record
Status
By
Functional
Area - Entity
Management
By
Functional
Area -
Performance
Information
https://www. sam.gov/portal/SAM/?navigationalstate=JBPNS_rOOABXdcACJgYXZheC5... 6/17/2014