Loading...
HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 9143403WORK ORDER PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND ao VOGEL CONCRETE, INC. DATED: 06/12/2014 Work Order Number: 1-VOG-4009032.40.90-14 Purchase Order Number: Project Title: Ramos for a crosswalk at Prospect Rd just East of MAX BRT guideway, Curb and Gutter replacement at Laurel St and Mason St Original Bid/RFP Project Number & Name: 7391 (Annual Concrete Maintenance Contractl Commencement Date: 06 2 /2014 Completion Date: 08/08/2014 Maximum Fee: (time and reimbursable direct costs): $10,337.11 Project Description: Install two new ramps for a crosswalk across Prospect Road lust Fast of the MAX Scope of Services: Professional agrees to perform the services Identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached . forms) the Professional Services Agreement shall control. The attached forms consisting of one W page are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Professional By: Date: 06/12/2014 City of Fort Collins By: RobertMosbev -01'-- Project Manager ' Date: 06/12/2014 By: Gerry Paul Director of Purchasing and Risk Management (over $60,000.00) Date: Project title -Two Ramps for crosswalk across iFederalY/N-Y ' Prospect Rd. at the MAX BRT Guideway, Curb and Work Order Number - 1-VOG-4009032.40.90-14 Gutter replacment at Laurel St. and Mason St. Item No. Description Unit W.O. Quantity Unit Price Total 202.03 Sawcut Concrete/ Asphalt 6" to 8" LF 51 3.75 191.25 202.06 Remove Concrete Sidewalk SF 404 2.63 1062.52 202.07 Remove Concrete Curb and Gutter LF 44 3.83 168.52 608.04 Vertical Curb and Gutter- No Sidewalk LF 44 22.05 970.2 608.15 Pedestrian Access Ramp SF 404 5.83 2355.32 608.17 Truncated Dome Panel SF 32 47.25 1512 608.22 Flatwork-6" SF 100 4.1 410 630.03 Channelizing Barrels Day Ea 140 0.89 124.6 630.14 Variable Message Board Day Ea 7 136.5 955.5 630.16 Traffic Control Supervisor Hr 28 39.9 1117.2 630.17 Flagging Hr 56 26.25 1470 0 0 0 0 0 0 0 0 0 0 0 D 400 10337.11 Independent Cost Estimate � �t Collins Date of Estimate: 16-Jun-14 Contract Type: Existing Contract or PO (Y/N): Y (Vogel Concrete) Description of Goods (A) or Services (B): Prospect Road Ramps & Curb & Gutter Replacement at Laurel I have obtained the following estimate from; Published Price List / Past Pricing (date) Engineering or Technical Estimate (performed by) Independent Third Party Estimate (performed by) Other (specify) Based on Blue Spruce projections from Tim Kemp lltem'O# v ;; f�<Locabon w ? z,*v+'T ? . Itern �Descn tion '; `iTfi.. :Quanti .,, Unit UnitlCost 11Total Cost Concrete Curb Ramp 404 SF $ 11.11 $4,488A4 Removal of Asphalt 404 SF $ 0.55 $222,20 Earthwork 404 SF $ 0.55 $222,20 Curb 8 Gutter 44 LF $ 15.00 $660.00 SUBTOTAL OF VOGEL CONSTRUCTION WORK ITEMS: $5,592.84 Work:Descri-tion Quanti -yM �Unit1iliiiilI YUnit{Cost1Y mTotallcostl Traffic Control - Labor - Supervision 28 Hr $ 50.00 $1,400.00 Traffic Control - Labor - Flagging 56 Hr $ 25.00 $1,400.00 Signage 7 Sign $ 1.00 $7.00 Traffic Control Barrels 140 Barrel $ 0.85 $119.00 Reflective Cones 140 Cone $ 0,75 $105.00 SUBTOTAL OF TRAFFIC CONTROL: $3,031.00 PROJECT SUBTOTAL: $8,623.84 CONTINGENCY (10%): $862.38 TOTAL PROJECT BUDGET: $9,486.22 C9UsemyslephenWppDalaLLa Wiaosoft\Windows\Temporary Internet Files\Content.OutookW2]D5NFUCE-2014M -Prospect Ramps Laurel Curb GWecxlsx3lue Spruce tl,k61I&Q014 System for Award Management Page 1 of 1 Search Results Notice: This printed daument represents only Me first page of your S Vl search reuilts. Moreresults may be available. To print your complete search results, you on convinced Me MF and print It. No records found for anent search. . I syatan Nr 4w,M wn,gem . Lo Noce to all Users: Pis is a Federal 6 emnient computer system. Use of this systen constitutes consent to monitoring at all threes. IEvgz.zo� I-tz V 9pv4 fl ll Glossary Search Results Entity Exdusion By Remrd Status BY Functional Area - Entity Management BY Functional Area - Perfonnance Information https://www. sam.gov/portal/SAM/?navigationalstate=JBPNS_rOOABXdcACJgYXZheC5... 6/17/2014