Loading...
HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 914332401 .( L( 3 3 )-Y. WORK ORDER PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF, FORT COWNS AND C.ONA,11 1 z)ll qqS- 1 Work Order Number. �- I q Purchase Order Number. l_- Pro)ectTltle.(Z",`� ,-, 4` ', Original BkifRFP ProjectNumber $ Name: Commencement Date: %/9 /iq Completion Date: q 13 1 / /1) Maximum Fee: (time and retmburh;able direct ccsts� 3 d y �' Project Desaiptlon: &,! `* c r nGre< e+ Gt Scope of Services: qc'Ac Professional agrees to perform the services Identified above and on the attached forms In accordance with the terms and conditions contained herein and in the Professional Services Agreement between the Pardee. In the event of a conflict lietween or ambiguity in the terms -of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of _ (� pages are hereby accepted and Incorporated herein, by this reference, and Notice to Proceed is herebygiven. �1S(� kG-Y-J- � GXISIsJ; 44 loS10(o,53 5-a3° 3'-0032W By: Gerry Paul Director of Purchasing and Risk Management (over $60.000.00) Date: Connell Resources, Inc. 7785 Highland Meadows Pkwy, #100 Fort Collins, CO 80528 am= Phone: (970) 223-3151 Fax: (970) 223-3191 Estimator: Roland Tremble QUOTATION Date: 4/21/2014 Submitted To: City Of Fort Collins- Natural Resources Bid Title Running Deer Trail Connection Address: Fort Collins, CO Bid Number. - .Project Location: Running Deer Open Space Near Prospect Road And I-2S Contact: Ryan Kogut Project City, State: Fort Collins, CO Phone: 970-016-2206 Fax: 97D-416.2211 Engineer/Architect Item tf Item Description Estimated Quantity Unit Unit Price Total Prix 00-100 Mobilization ...... $4,540.00 1.00 EACH $4,540.00 08402 Concrete Trail Yosemite Brown 5" With Fiber 1,600.00 SF $8.00 $12,800.00 08402 Concrete Trail Sawcut Joints Versus Tooded Joints 1,600.00 SF $0.40 $640.00 23-145 Minor Grading To Establish Troll Grade For Placement Of 1,100.00 LF $2.2S $2,475.00 Recycled Asphalt 23-145 Place FIII Dirt Hauled By RlverbeM Trail Project 350.00 CY $6.60 $2,310.00 23-215 Fine Grade Concrete Trail 1,600.00 SF $1.25 $2,000.00 23-500 Finish Grading After Trail Is Poured 1.00 LS $2,240.00 $2,240.00 29-108 Concrete Washout Install And Remove Concrete Spoil 1.00 EACH $1,160.00 $1,160.00 29-114 Erosion Log (9" Diameter) If Required 100.00 LF $4.80 $480.00 29-120 Street Sweeping 8.00 HR $118.00 $944.00 35-110 Gravel Surfacing 6" (Recycled Asphalt) (8 Ft Wide) 980.00 SY $9.05 $8,869.00 Total Bid Price: $38,458.00 Notes: • Pricing Is based upon Site visit with Ryan Kogut • The following are exduded from this proposal: Construction engineering; Drainage facility certification; Warrantee period in excess of one year; Street cleaning for work performed by others; Permits: Including but not limited to, city building, development construction, construction dewatering, wastewater disdorge, storm water discharge (NPDES), at quality, etc; Fees, Including but not limited to, for developement, Inspection, utility connection, meters, etc.; Dewatenng; Maintenance of erosion control devices for others; quality control or acceptance testing; prairie dog removal, relocation, or exterMnation; landscaping, seeding, or revegetation. • Please provide a minimum of 2 weeks advanced notification of work requests to allow for sdmedulkg the work. No work will be completed without a signed Contract Agreement. • Frost removal or winter protection is not Included. If requested, it will be billed either an a time and material bask or a lump sum amount that is mutually agreed apon. • Add 1% to Include performance and payment bond. ACCEPTED: The above prides, specifications and conditions are satisfactory and hereby accepted. Buyer. Signature: Date of Acceptance: CONFIRMED: Connell Resources, Inc Authorized Signature: Estimator: Roland Tremble (970) 223-3151 rtremble@connelkesources.tom 4/21/2014 9:00:06 AM Page I oft