HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 9143323q /q--�-)z3
EXHIBIT "A"
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
and 3 0l7
INTERWEST CONSULTING GROUP, LLC 3 9
DATED: May 12, 2014
Work Order Number: 75CS$%
Project Title: 7392 Civil Engineering, Design, Drafting & Surveying Services On -Call
Riverbend Ponds Trail Improvement Project
Commencement Date: May ] 2, 2014
Completion Date: April 14, 2017
Maximum Fee: (time and reimbursable directs costs): not to exceed $12,900
Project Description: See Attached.
Scope of Services: See attached scope of service.�J7 i7 3L47 O 3 D w
Service Provider agrees to perform the services
Identified above and on the attached forms in
accordance with the terms and conditions
contained herein and in the Services Agreement
between the parties. In the event of a conflict
between or ambiguity in the terms of the
Services Agreement and this work order
(including the attached forms), the Services
Agreement shall control.
Service Provider
By:.
Date: May 12,201
4-7s749
Approved By:
Purchasing Agent over $60,000
The attached forms consisting of four (4) pages,
(including the Work Order Form) are hereby
accepted and incorporated herein by this
reference, and Notice to Proceed is hereby given.
City of Fort Collins
IMTRRW T COR5ULT1NG GROUP
May 12, 2014
Ms. Karen Manci
City of Fort Collins Natural Areas
1745 Hoffinan Mill Road
Fort Collins, CO 80524
Riverbend Ponds Trail Improvement Project
Project Description and Scope of Services
Dear Karen -
Attached is the project scope and description that we discussed:
Description
Interwest and King Surveyors will provide engineering and surveying services necessary to create plans for
construction and stormwater permitting for the following three projects at Riverbend Ponds previously identified
by Natural Areas:
• Project #2 - 360 linear feet of new concrete trail from the proposed ADA parking to the relocated fishing
dock
• Project #6 - 675 linear feet of boardwalk to be replaced at or below existing elevation
• Project #7 - 850 linear feet of gravel trail to be removed and replaced at or below existing grade.
Individual Protect Scone of Services
Project #2— ADA parking and ADA accessible trail
Surveying — Topographic sunny — King Surveyors will provide four phases of topographic survey. The initial
phase will include topographic survey of the existing parking lot and 20' either side of the existing gravel trail
alignment down to the proposed location of the new fishing pier. The second phase will establish existing
elevations every 50 feet along the proposed ADA concrete trail alignment that is in the tloodplain so that an
accurate comparison of existing and proposed ground can be made after construction is completed. During this
phase, King will place blue top stakes on both sides of the trail to be used during construction. The third phase
will include staking out the ADA parking and concrete trail for the contractor prior to construction. The final
phase of survey will occur during construction of the trail and include as -built elevations at the location of the
critical points established every 50 feet along the trail.
Estimated Fee: $1,600
ADA Improvements — Interwest will prepare a demo plan and a detailed grading plan for the addition of a
concrete ADA parking area in the existing gravel parking lot and a grading plan for the ADA accessible concrete
trail extending down to the relocated fishing dock.
Estimated Fee: $4200
1218 W. ASH, STE. C, WINDSOR, COLORADO 80550
TEL. 970.674.3300 - FAX 970.674.3303
Project #6 —Boardwalk Replacement
Surveying — Topographic survey — King Surveyors will provide two phases of topographic survey. The initial
phase will include topographic survey 20' either side of the existing boardwalk alignment. The second phase will
include an as -built survey of the new boardwalk to verify that the finish grade is at or below the existing
boardwalk elevations.
Estimated Fee: $3,000
Trait plan grading — Interwest will prepare a plan for the boardwalk alignment showing existing ground
elevations every 50 feet and a typical section for the proposed boardwalk. The finish grade of the boardwalk will
be based on the grade of the existing boardwalk prior to the flood damage. The boardwalk design will be
provided by others.
Estimated Fee: $800
Project #7 — Remove and Replace Gravel Trail
Surveying — Topographic survey — King Surveyors will provide three phases of topographic survey. The initial
phase will include topographic survey 20' either side of the existing trail alignment. The second phase will
establish existing elevations every 50 feel along the proposed alignment so that an accurate comparison of
existing and proposed ground can be made after construction is completed. During this phase, King will place
blue top stakes on both sides of the trail to be used during construction for all areas that will be removed and
replaced at or below existing grade. The final phase of survey will occur after construction of the trail and include
as -built elevations at the location of the critical points established every 50 feet along the trail.
Estimated Fee: $1,700
Trail plan grading — Interwest will prepare a trail alignment plan, spot elevations every 50 feet, and a typical
section for the existing gravel trail that will be removed and replaced.
EstinmtedFee: $1,200
Commoo5cope of Services
Floodplain process assistance — Interwest will assist the City with the floodplain documentation necessary to
construct all three projects including benchmarks and BFE elevations along the trail and boardwalk segments. It
is assumed that all three projects can be permitted through a single floodplain use permit and no rise certification.
Interwest will also incorporate the as -built survey points (provided by King) into exhibits to compare the design to
the as -built conditions and close out the City Floodplain Permits.
Estimated Fee: $2,100
Reimbursables— for prints, mileage, and deliveries, etc...
Estimated Fee. $100
Total Estimated Fee: $12,900
Assumptions-
1. Specifications, quantities, and contract documents provided by others.
2. Environmental and geotechnical engineering provided by others.
3. Boardwalk design provided by others.
1218 W. ASH. STE. C. WINDSOR, COLORADO80550
TEL 970.674.3300- FAX 970.674.3303
4. Since there is no way to establish the existing grade of the boardwalk prior to the flood damage, Interwest
will rely on Natural Areas to confirm that the proposed elevation is at or below the previous existing
elevation.
5. No CA or CM work is included.
6. Stormwater Management Plan and Discharge Permit will be provided by the Contractor.
7. No environmental construction related permitting tasks will be completed by Interwest.
chedule
Interwest and King Surveyors will begin work on the project immediately in hopes of having plans available for
bid in July, 2014. However, the schedule will likely be dependent on the floodplain review.
Please call me at 970460-1091 if you have any questions or need any additional information.
Thanks,
Skylar Brower, PE
1218 W. ASH, STE. C. WINDSOR, COLORADO 80550
TEL. 970.674.3300 - FAX 970.674.33M