HomeMy WebLinkAboutCORRESPONDENCE - AGREEMENT MISC - NOVAK CONSULTING GROUP (4)4/4/2014
Professional Services
N
Social Sustainability, Staffing and Structural Analysis
Wendy Bricher
Past contracts:
2013 A Train - FortZED Marketing and Community Engagement Services
2013 Novak - Competitive Process Analysis
Independent Cost Estimate
Cost of Standard Items
Service Provided
Labor Rate
Inflation
Adj. Rate
Projected
Projected
Notes/Data Source
Hours
Cost
Novak - Project Management
$ 200.00
$ 5.60
$ 205.60
A Train - Project Management (Average)
$ 166.00
$ 4.65
$ 170.65
Project Management - Average Rate
$ 188.13
28
$ 5,268
Novak - Data Collection
$ 75.00
$ 2.10
$ 77.10
A Train - Data Collection (Average)
$ 80.00
$ 2.24
$ 82.24
Data Collection -Average Rate
$ 79.67
34
$ 2,709
Novak - Plan Drafting
$ 112.00
$ 3.14
$ 115.14
A Train Design
$ 80.00
$ 2.24
$ 82.24
Plan Drafting -Average Rate
$ 98.69
24
$ 2,369
A Train - Communications Strategy (Average)
$ 80.00
$ 2.24
$ 82.24
$
Novak- Communications Stragegy
$ 75.00
$ 2.10
$ 77.10
$
Communications Strategy - Average Rate
$ 79.67
30
$ 2,390
Total
I
I
I $ 12,735
Product
Projected
Notes/Data Source
Cost
Copying / Printing Materials
$ 2,500
Public Outreach Expenses
$ 500
Miscellaneous Expenses
$ 500
Total
$ 3,500
Grand Total $ 16,235
Inflation estimated at 2.8% per year
C:\Users\wbricher\Desktop\ICE - 2014 Social Sustainability, Staffing and Structural Analysis.xlsxlCE - 4/4/2014
s%1/Y
SAM Search Results
List of records matching your search for
Search Term : Novak* Consulting* Group*
May 29, 2014 11:18 AM Page 1 of 1
FEDERALLY REQUIRED AND OTHER MODEL CLAUSES
APPLICABILITY OF THIRD PARTY CONTRACT CLAUSES
(excluding micro -purchases, except for construction contracts over $2,000)
7623 Department of Social Sustainability Staffing and Structural Analysis
T:YPE OF PROCUREMENT
X
Clause
Professional
Operations/
Rolling Stock
.Construction
-MaFeriala &
t
Services/A&E„Management,
._._- -
- -
f9,£„,Prchase.
:.
Supplies ..
No Federal Government
Obligation To Third Parties
X
All
All
All
All
All
(by Use of a Disclaimer
False Statements or Claims
X
All
All
All
All
All
Civil and Criminal Fraud
Access To Third Party
X
All
All
All
All
All
Contract Records
Changes to Federal
X
All
All
All
All
All
Requirements
Termination
X
All
All
All
All
All
Civil Rights Title VI, EEO, ADA
X
>$10,000
>$I0,000
>$10,000
>$I0,000
>$10,000
Disadvantaged Business
X
All
All
All
All
All
Enterprises DBEs
Incorporation of (FTA) Terms
X
All
All
All
All
All
Suspension and Debarment
X
>$25,000
>$25,000
>$25,000
>$25,000
>$25,000
Buy America
NA
>$100,000
>$I00,000
>$100,000
Resolution of Disputes,
Breaches, or Other Litigation
NA
>$100,000
>$100,000
>$100,000
>$100,000
>$100,000
Lobbying
NA
1 >$I00,000
>$I 00,000
>$100,000
>$100,000
>$100,000
Clean Air
NA
>$100,000
>$100,000
>$100,000
>$100,000
>$100,000
Clean Water
NA
>$100,000
>$100,000
>$100,000
>$100,000
>$100,000
Caro Preference
NA
All
All
All
Fly America
Involves foreign
Involves foreign air
Involves foreign
Involves foreign
Involves foreign air
X
transport or travel
transport or travel
air transport or
air transport or
transport or travel
b air
travel
travel
Davis -Bacon And Copeland Anti-
NA
>$2,000 (intruding
Kickback Acts
ferry vessels
Contract Work Hours And Safety
NA
>$2,500 (except
>$2,000 (including
Standards Act
transportation
>$2,500
ferryvescludi
services
Bonding
NA
$100,000
Seismic Safety
NA
A & E for New
Buildings &
New Buildings &
Additions
Transit Employee Protective
NA
Transit Operations
Agreements
Charter Bus
NA
All
School Bus
NA
All
Drug Use - Testing and Alcohol
NA
Transit Operations
-
Misuse - Testing
Patent Rights and Rights in Data
NA
Research &
and Copyright Re uirements
Development
Energy Conservation
X
All
All
All
All
All
Recycled Products
NA
Contracts for items
Contracts for items
Contracts for items
designated by
designated by
designated by
EPA, when
-
EPA, when
EPA, when
procuring $10,000
procuring $10,000
procuring $10,000
ormore er ea,
I
or more Per year
or more per year
Conformance With ITS National
Architecture
NA
ITS Projects
ITS Projects
ITS Projects
ITS Projects
ITS Projects
ADA Access
NA
A & E
All
All
All
All
Bus Testing
NA
All
Pre -Award And Post Delivery
NA
Audits
All
CONTRACT CHECKLIST FOR COMPETITIVE PROPOSALS
RFP No./Title: 7623 DEPARTMENT OF SOCIAL SUSTAINABILITY STAFFING &
STRUCTURAL ANALYSIS
Checklist Item
Contract File
Comments
Location
7) Independent Cost Estimate
ICE completed 4/4/2014 and
The City made and documented an
included in file.
independent cost estimate before receipt of
proposals.
9) Unreasonable Qualification
No
Requirements This solicitation did not contain
unreasonable requirements placed on firms in
order for them to qualify to do business.
10) Unnecessary Experience and
No
Excessive Bonding
Unnecessary experience and excessive
bonding requirements were not included in
this solicitation or contract documents.
11) Organizational Conflict of
No
Interest (OCI)
If there is an apparent or potential OCI the
solicitation contains provisions to eliminate or
mitigate the conflict (e.g. by inserting a clause
that prohibits the contractor from competing
for the follow-on contract to the current design
or research contact) and OCI Certification is
submitted by the contractor.
12) Arbitrary Action
No
There was no arbitrary action in the
procurement process. (An example of
arbitrary action is when award is made to
other than the contractor who most satisfied
all the City requirements as specified in the
solicitation and as evaluated by staff.
13) Brand Name Restrictions
NA
Brand Name or Equal. When it is impractical
or uneconomical to provide a clear and
accurate description of the technical
requirements of the property to be acquired, a
"brand name or equal" description may be
used to define the performance or other
salient characteristics of a specific type of
property. The City must identify the salient
characteristics of the named brand that
offerors must provide. When using a "brand
name" specification, the City does not need to
reverse -engineer a complicated part to
identify precise measurements or
specifications in order to describe its salient
characteristics. FT A's "Best Practices
Procurement Manual;' (BPPM) contains
additional information on preparation of
specifications including examples with
specific lan ua e.
14) Geographic Preferences
No
The solicitation contains no in -State or local
geographic preference except where Federal
statutes mandate or encourage them.
15) Contract Term Limitation
Yes; contract is for consulting
The contract period of performance for rolling
services, not rolling stock.
stock and replacement parts does not exceed
Contract was awarded to highest -
five (5) years inclusive of options without prior
scoring firm via the City's normal
written FTA approval. For all other types of
contracts, the procurement file contains
RFP evaluation process.
evidence that the contract term is based on
sound business judgment.
16) Written Procurement Selection
Yes
Procedures
The City has written selection procedures and
the solicitation also identifies all requirements
that offerors must fulfill and all other factors to
be used in evaluating bids or proposals.
17) Solicitation Prequalification
NA
Criteria
The solicitation required prequalification of
persons, firms, or products. The list is current
includes enough qualified sources to ensure
maximum full and open competition, and
potential bidders are not precluded from
qualifying during solicitation period from
issuance of the solicitation to its closing date.
If the solicitation does not contain a
prequalification requirement, check NA.
18) Award to Responsible
1. Yes
Contractor
2. Yes
The City made a determination that it was
3. Yes
awarding to a responsible contractor
4. Yes
considering such matters as contractor
5. Yes
integrity, compliance with public policy, record
of past performance, and financial and
technical resources.
1. Appropriate Financial, equipment, facility
and personnel. (YIN)
2. Ability to meet delivery schedule. (Y/N)
3. Satisfactory period of performance. (Y/N)
4. Satisfactory record of integrity, not on
declined or suspended listings. (Y/N)
5. Receipt of all necessary data from
vendor. (Y/N)
19) Sound and Complete Agreement
Yes
This contract is a sound and complete
agreement. In addition, it includes remedies
for breach of contract and provisions covering
termination for cause and convenience.
24) Clear, Accurate, and Complete
Yes
Specification
A complete, adequate, and realistic
specification or purchased description was
available and included any specifications and
pertinent attachments which define the items
or services sought in order for the bidder to
properly respond.
25) Two Bidders
Yes; two proposals were
Two or more responsible bidders were willing
received.
and able to compete effectively for the
business.
26) Firm Fixed Price
A not -to -exceed dollar limit is set
A firm fixed price contract was appropriate for
in the contract.
this procurement.
29) Advertising
Yes; on the City's BuySpeed
The Invitation for Bids was publically
eprocurement system.
advertised.
30) Adequate Number of Sources
Yes
Solicited
Bids were solicited from an adequate number
of known suppliers.
36) Evaluation
Yes
A method is in place for conducting technical
evaluations of the proposals received and the
solicitation has evaluation factors identified
along with their relative importance.
37) Price and Other Factors
Yes
For this procurement, award was made to the
responsible firm whose proposal is most
advantageous to the grantee's Program with
rice and other factors considered.
40) Evaluation of Options
NA
The option quantities or periods contained in
the contractor's bid or offer were evaluated in
order to determine contract award. (To be
eligible for Federal funding, options must be
evaluated as part of the price evaluation of
offers, or must be treated as sole source
awards.
41) Cost or Price Analysis
Price Analysis performed;
Either a cost analysis or a price analysis was
awarded contract Not -to -Exceed
performed and documented. The price was
amount is 7% below the ICE,
determined to be fair and reasonable.
pricing considered fair &
reasonable.
42) Written Record of Procurement
1. RFP format was selected
History
to evaluate service factors
The file contains records detailing the history
in addition to cost.
of this procurement. At a minimum, these
2. Professional Services
records include:
(1) the rationale for the method of
Agreement selected as
procurement,
contract type. Services will
(2) Selection of contract type,
be completed by 12/31/14.
(3) reasons for contractor selection or
3. Award was granted to
rejection, and
(4) the basis for the contract price.
highest -scored proposal
per RFP criteria stated in
7623 RFP document.
4. Pricing is as outlined in
Exhibit A of the
Professional Services
Agreement.
43) Exercise of Options
NA
The grantee exercised an option on this
contract adhering to the terms and conditions
of the option stated in the contract and
determined that the option price was better
than prices available in the market or that the
option was a more advantageous offer at the
time the option was exercised.
If an option was not exercised under this
contract, check NA.
44) Out of Scope Changes
NA
The grantee amended this contract outside
the scope of the original contract. The
amendment was treated as a sole source
procurement (complying with the FTA
requirements for a justification, cost analysis
and profit negotiation).
45) Advance Payment Provisions
No
The contractor did not receive an advance
payment utilizing FTA funds and the contract
does not contain advance payment provisions
or, if it did, prior written concurrence was
obtained from FTA.
46) Progress Payment Provisions
NA
The contract contains progress payments
based on costs incurred (as opposed to
percent of completion) and the contract
contains a provision giving the grantee title to
property (materials, work in progress, and
finished goods) for which progress payments
are made. The contract may contain other
security in lieu of obtaining title.
47) Time and Materials Contracts
No
This is a time and materials contract; the
grantee determined that no other type of
contract is suitable; and the contract specifies
a ceiling rice.
48) Cost Plus Percentage of Cost
No
This is not a cost plus a percentage of cost
type contract.
49) Liquidated Damages Provisions
No
This contract contains liquidated damages
provisions and the assessment for damages
is specified in the contract at a specific rate
per day for each day of overrun in contract
time.
50) Piggybacking
1. Yes
1) The file contains: Assignability provisions.
2. Yes
2) The procurement file contains: Price
reasonableness determination.
56) Clauses
Yes
This contract contains the appropriate FTA
required clauses.
System for Award Management
Report run 5/29/14; no search
(SAM) SAM run and include in the file.
results.
City Bid Appeal Statement included in
Yes
Federal T &C
SUPPLEMENT
FOR ARCHITECT & ENGINEERING SERVICES
Checklist Item
Contract File
Comments
Location
8) A&E Geographic Preferences
NA
Geographic location is not a selection
criterion or it is a selection criterion and its
application leaves an appropriate number of
qualified firms, given the nature and size of
the project, to compete for the contract.
51) Qualifications Exclude Price
NA
The City evaluated the offeror's qualifications
and excluded price as an evaluation factor.
52) Serial Price Negotiations
NA
The City conducted negotiations with only the
most qualified offeror and failing agreement
on price would conduct negotiations with the
next most qualified offeror until contract
award could be made to the most qualified
offeror whose price is fair and reasonable to
the grantee.