Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 7491 BLOCK 32 CM/GC IMPROVEMENTS� 1(4 -�/N EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND Adolfson & Peterson Construction DATED: 7/25113 Work Order Number. OP-425796 Project Title: Block 32 Master Plan Commencement Dale: July 25, 2013 Completion Date: June 30, 2014 Maximum Fee: (lime and reimbursable direct costs): $12,600 Protect Description: Develop a conceptual master plan for Block 32 and potential surrounding parcels with the express purpose of defining a site location for the Customer Service Building that responds and respects the long term development of the Civic Center. Scope of Services: The Construction ManugedGoneral Contractor (CWGC) will collaborate with all consultants and the design team to work as an Integrated design team and help maintain the focus and commitment to the Integrated energy/Mgh performance goals of the project. The CM/GC will assist the project team with cost estimating, construction methods and approach evaluations, construction sequencing and scheduling and other conslruclability considerations during planning and design. The CMIGC will be compensated for their participation based on approved labor and equipment rates with a cost not to exceed as listed In the Fee proposal. General condition charges will be allowed as per Exhibit C of the RFP along with the approved rates. Each invoice which shall have detailed Itemization of each Item submitted be within the not to exceed amount as listed for each Item In the Fee proposal. Professional agrees to perform the services Identified above and on the attached forms In accordance with the terms and conditions contained herein and In the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity In the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of Nineteen (19) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. City of Fort Collins Facilities 0ject Mana a tip ell By: Date: By: Director of Purchasing and Risk Management (If over $60,000.00) Date: AP Mountain Stales, LLC dha Adulfsun Contractor: & Peterson Construction Signature:} Name: Eric P. Kimindshuc, Sr. PM Date: 0/6/2014 EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND Adolfson & Peterson Construction DATED: 7/25/13 Work Order Number: OP-452626 Project Title: Utilities Customer Service Building — Preconstruclion Phase Commencement Date: January 26, 2014 Completion Dale: August 30, 2014 Maximum Fee: (lime and reimbursable direct costs): $11.600 Project Description: Develop a design for the new Customer Service Building to be located on Block 32 to Include working through SD, DID and CD phases to where the Clly of Fort Collins has Issued a building permit for construction. Scope of Services: The Construction Manager/General Contractor (CM/GC) will collaborate with all consultants and the design loam to work as an Integrated design team and help maintain the focus and commitment to the Integrated energy/hlgh performance goals of the project. The CM/GC will assist the project team Wlh cost estimating, construction methods and approach evaluations, construction sequencing and scheduling and other construclability considerations during planning and design. The CM/GC will be compensated for their participation based on approved labor and equipment rates with a cost not to exceed as listed as the Fee. General condition charges will be allowed as par Exhibit C of the RFP along with the approved rates. Each Invoice shall have detailed Itemization of each item submitted and be within the not to exceed amount as listed for each Item In the agreement. Professional agrees to perform the City of Fort Collins services identified above and on the Facilities Ppoject Mana : BM rgotl attached forms in accordance with the terms and conditions contained herein By: and in the Professional Services / Agreement between the parties. in the Dale: (Ol event of a conflict between or ambiguity In the terms of the Professional By: Services Agreement and this work Director of Purchasing and Risk Management order (including the attached forms) the (if over $60,000.00) Professional Services Agreement shall Date: control. The attached forms consisting AP Muunmin Status. LLCdba Adulrsun of Nineteen (19) pages are hereby Contractor. & Peterson Construction accepted and Incorporated herein, by this reference, and Notice to Proceed is hereby given. Signature: Name: Eric P. Kimmclsi uc, Sr. PN Dale: 6/6/2014