HomeMy WebLinkAboutCHANGE ORDER - BID - 7545 OLD WATERWORKS ROOFING PROJECT (2)CHANGE ORDER NO, 2
PROJECT TITLE: 7545 Old Waterworks Roofing Project
CONTRACTOR: Zeigler Construction LLC
PROJECT NUMBER: OP-454162
DESCRIPTION: aerootmoawnurraweuue:uonarnreaancrwueom
Fort Collins
In preparing change orders show in order as separate numbered paragraphs the following:
Reason for change: Una Item charges for unforeseen extra labor and materials and permits
2 Description of changeM,,niry work labor and materiels. Repair fascia, so88, crown molding, aldin
an a g. on nuous ge vent, ea ng, gutters an cupo a a ee.
3. Change In contract cost: $9492.29
4. Change in contract time: o days
(Attach additional sheets as regUred)
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING.CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
Total C.O. % of Original Contract
ADJUSTED CONTRACT COST
ACCEPTED BY -
ACCEPTED
$90,630.00
$7,2134.85
$0.00
58,491�
10A9%
18.63%
1 3107,307.14.
P I tiAs 2 p4-6-c-H tC
Shawn Zeigler
Project Manager Melton Wlnden
REVIEWED BY.
Print Name
521114
Date
Data
APPROVED BY'
Pdnt N e Ken Marmon Date
APPROVED BY:
Print Name Date
Hover $80,000 - Purchasing Director
cc City Clerk Project File
Contractor Purchasing
Engineer
John Stephen
From: Gerry S. Paul
Sent: Monday, June 09, 2014 9:55 AM
To: John Stephen
Subject: RE: Change Order for Ziegler Construction
John
I'm good to go. Just be sure to document the logic.
Thanks,
Gerry Paul
Director of Purchasing and Risk Management
215 N. Mason
City of Fort Collins
970-221-6779-0
970-567-9840-C
gspaul@fcgov.com
-----Original Message -----
From: John Stephen
Sent: Monday, June 09, 2014 9:38 AM
To: Mel Winden
Cc: Ken Marmon; Gerry S. Paul
Subject: RE: Change Order for Ziegler Construction
Thanks Mel ... using th CDX or sheathing is a line item that allows me to approve this change order
if questions. Thanks ...Jo
John Stephen, CPPO, LEED AP
Senior Buyer
215 N Mason
City of Fort Collins
970-221-6777
-----Original Message -----
From: Mel Winden
Sent: Monday, June 09, 2014 9:13 AM
To: John Stephen
Cc: Ken Marmon; Gerry S. Paul
Subject: Re: Change Order for Ziegler Construction
John,
Barn, CDX,
712 sq ft.
$1189.04
Chicken coop CDX.
369 sq ft.
$616.23
House CDX.
2154sq ft.
$3597.18
Total CDX.
3235 sq ft.
$5402.45
Gerry, let me know
1
House Gutters. 210 lin ft. $2259.60
W.W. Gutters. 284 lin ft. $3055.84
Total Gutters. 494 lin ft. $5315.44.
We changed the style of the gutters which raised the price $1.81 lin ft. From $8.95 to $10.76 We did this so the gutters
would match on both buildings and be more period correct. The original bid was to replace what was there. Because of
the crown molding they couldn't use hidden hangers.
All the carpentry work was lumped together. (See attachment)
Facia, soffit, crown, siding and decking.
Materials. $65.32
Labor. $810.00
Total. $875.32
Thanks
Mel
Sent from my iPad
> On Jun 6, 2014, at 2:56 PM, "John Stephen" <JSTEPHEN@fcgov.com> wrote:
> Mel,
> I need to have the change order quantities tie to the additional line item bid schedule. Your explanation has them all
lumped together. Do you have the total square foot of sheathing that needed to be replaced or the linear foot of crown
molding? Did we do any gutter work? This what we need to answer so we can get Zeigler Construction paid for work
they have completed.
> We need to justify the extra $3,197.48 over the 15%. Below is the additional costs line items that we added on the
addendum. I have attached the signed contract and the compensation is found on page 18.
> Thanks ... John
> Additional Bid Items
> Sheathing per square foot
> Crown Molding per linear foot
> Gutters per linear foot
> John Stephen, CPPO, LEED AP
> Senior Buyer
> 215 N Mason
> City of Fort Collins
> 970-221-6777
F?
> From: Mel Winden
> Sent: Friday, June 06, 2014 10:40 AM
> To: John Stephen
> Cc: Ken Marmon; Gerry S. Paul
> Subject: Re: Change Order for Ziegler Construction
> HeyJohn
> There was unforeseen charges for carpentry work and materials and also we added ridge vents.
> There was repair to the residence that includes facia, soffit,siding and decking along with the repair of the crown
molding. These repairs came to $872.32 Labor and materials.
> On the Waterworks building, repairs was for carpentry work on the Cupola, which was to replace all of the flashing
and bead board at both ends. Plus R&R wood shingles and flashing on the SW wall. These repairs came to $2012.46.
Labor and materials.
> We added ridge vents because the old roof's didn't have any. One of the reason the roof failed was because the nails
rusted away. Just like your roof at home there has to be a way for condensation to escape. They installed continuous
roof vents to keep the look of the original roof. This came to an extra $2268.50 Labor and material.
> The permit fee was. $902.72
> Total. $6056.00
> Call or e-mail if you have any more questions Thanks Mel
> 970-566-7046
> Sent from my iPad
> On Jun 5, 2014, at 12:48 PM, "John Stephen" <1STEPHEN@fcgov.com<mailto:JSTEPHEN@fcgov.com>> wrote:
> Mel, the change order that I received is over the 15% amount allowed
> by City code. I know that we had itemized charges for sheathing,
> crown molding and gutters. Did we replace an unusual amount of these
> items and if so, how much. Just trying to figure out how we can
> justify the extra 3.53%over the 15%. John
> John Stephen, CPPO, LEED AP
> Senior Buyer
> 215 N Mason
> City of Fort Collins
> 970-221-6777
> From: Mel Winden
> Sent: Thursday, May 29, 2014 3:56 PM
> To: John Stephen
> Subject: Re: Change Order for Ziegler Construction
> I. John, I gave Ken a signed change order. - Mel
> Sent from my iPad
> On May 29, 2014, at 12:05 PM, "John Stephen" <JSTEPHEN@fcgov.com<mailto:JSTEPHEN@fcgov.com>> wrote:
> Mel, I need a signed change for req 47413. Thanks ... John
> John Stephen, CPPO, LEED AP
> Senior Buyer
> 215 N Mason
> City of Fort Collins
> 970-221-6777
> <CONTRACT (signed) - 7545 Old Waterworks Roofing Project.pdf>
Zeigler Construction
PO Box 371
Bellvue, Co 80512
(970)4814765
Shawnzeigler@gmaii.com
Bill To
City of Fort Collins
Water Works
2005 N Overland Trail
Ft. Collins, Co.
Bid 7345
Terms
Due on receipt
Date
3/10/2014
Invoice
Description
Quantity
Rate
Amount
Barn
8,645.00
8,645.0D
Perform work as per bid and specs.
Install 1/2 cdx plywood sheathing.
712
1.67
1,199.04
Install continuous ridge vent.
27
8.25
222.73
Payment for materials
.3,209.30
Thank you for your business.
Total S6,847.29
Zeigler Construction
PO Box 371
Bellvue, Co 80512
(970)4814765
Sha%vnzeigier@gmaii.com
MW
City of Pon Collins
Water Works
2005 N Overland Trail
Ft. Collins, Co.
Bid 7545
Terms
Due on receipt
Date
4/5/2014
Invoice
Description
Quantity
Rate
Amount
Chicken coop.
-
4,500.00
4,500.00
Remove and dispose of the existing roofing.
Install high temp ice and water.
Install 718 galvanized corrugated metal.
Install I12" cdx sheathing.
369
1.67
616.23
Thank you for your business.
Total $5,116.23
Zeigler Construction
PO Box 371
Bellvue, Co 80512
(970)4814765
Shawnzeigier@gmaii.com
Bill To
City of Fort Collins
Water Works
2005 N Overland Trail
Ft. Collins, Co.
Bid 7545 '
Terms
Due on receipt
Date
4/5/2014
Invoice
Description
Quantity
Rate
Amount
Perform work as per bid and specs.
23,955.00
23,955.00
Carpentry work
18
45.00
810.00
Fix facia, soffit, crown, siding and decking. Labor
Carpentry work. Materials
65.32
65.32
Continuousridge vent.
67
8.25
552.75
1'2" cdx sheathing
2,154
1.67
3,397.18
1/2 round gutters
210
10.76
2,259.60
Materials payment received.
-8,711.00
Thank you for your business.
Total s22s28s5
Zeigler Construction
PO Box 371
Bellvue, Co 80512
(970)481-4765
Shawnzeigler®gmail.com
9W.
City of Fort Collins
Water Works
2005 N Overland Trail
Ft. Collins, Co.
Bid 7545
Terms
Due on receipt
Date
5/15/�014
Invoice
Description
Quantity
Rate
Amount
Water works/ Water Plant
53,430.00
53,430,00
Perform work as per original bid and specs.
Misc. carpentry work and
24
45.00
1.080.00
Carpentry and metal work on the cupola.
Replaced all of the flashing and the bead board on the two
ends. Labor
Materials for the cupola.
756.46
256.46
R&•.R wood shingles and flashing on the SW wall.
1
676.00
676.00
Ridge vent.
181
8.25
1.493.25
Permit for the entire project.
902.72
902.72
1/2 round gutters.
284
1D.76
3.055.84
Materials payment received.
-20,174.50
Materials and labor payment received.
-10,000.00
Materials and labor payment received.
-10,000.00
Materials and labor payment received.
-10,000.00
It's been a pleasure working with you!
Total $10,719.77