HomeMy WebLinkAboutCORRESPONDENCE - AGREEMENT MISC - EMPIRE CARPENTRY011(4�lS-3>
Invoice
Empire Carpentry LLC
PO Box 245
Bellvue; Colorado 80512
Date: May 20`h 2013
TO: Sharon Johnson
3416 Arapahoe Dr
Fort Collins, CO 80521
Job Location: The William C. Stover House
503 Remington
Fort Collins, Colorado 80524
Phone: (970)493-3499
Fax: (970)493-2088
empire@verinet.com
INVOICE # I 1-13-1
Job Scope & Description: Roof & gutter rehabilitation
Remove & replace Cedar roof and gutters as per Contract; Insulate areas accessed through roof.
Contract amount:
Total
Total Due 75% payment
Please pay upon receipt
Thank you
0�
Vandort$uppwr
OV # h '
Batch #
Account # to s Q p3'k 0 D ..5'7-1-( D
Invoice 0
12.00
82
General Contracting & Design - Residential & Commercial - Remodeling - Preservation
U
City of Foit.Collin's Co ffi ncy rac as c 4�11�4
Exterior Rehaliil6tion !
Project 42014-M1-028
PROJECT BUDGET
TASK AMOUNT
A. Roof $22,000
B..Integral Gutters $11,126
C. Carpentry $2,220
D.Insulation $1,700
Subtotal 4 - DI $37,046
2-- '!; (
E. Permits $2,620 4
F. Overhead & Proft $4,446
G. Grant Administration (7% of SubtotalA—D) * C p F t- C $2,647
Project Subtotal 1°1 $46;759-
Contiu8enry $ ;3,478 (see table below)
12130113'.-1 A: Roof
1 /6/ 14 1 C Carpentry
4/9/14 j C. Carpentry
PROJECT TOTAL
Grant Awiid'(480
Cash -Match (52%)
-12,493 = $985
j460
$44 = $0
34-7 14 4
$50,237 -
$24,114
$26;123
*Grant Administration cannot exceed 15% of Subtotal amount.
**Grant payment's will be based off Project Subtotal amount. • Total payments will be Grant Award
percentage of Project Subtotal up to a maximum of the Grant Award Amount:
$,Cortirjgency - Must teceive written approval froin$HF Staff prior to use.
Ttavef must•lie within SHF/State allowable rates'($.51 /mile —mileage, $100/night = Hotel, $46/day —Per Diem)
H:\Contracts\2014\14M1028 Exhibit B_contingmcy mdung 4.9.14.docx
�k4llfZ
Y : 3 Page 1 of ]page
c
Roof
Integral Gutters
Carpentry
Insulation
Remove roof 8 recycle
$1,000.00
$1,000.00
$2.000.00
$1.500.00
$1,500.00
Install 309 roof felt over roof. Install a'cedar breather for life
extension of shingles. Install galvanized head wall flashings.
$4,000.00
$4,000.00
$8,000.00
$6,000.00
$6.000.00
Install class B #1, 18' cedar shingles;.5' exposure maximum. Install
hip & ridge matching existing as close as possible.
$5,750.00
$5,760.00
$11.500.00
$8,625.00
58,625.00
Cover & Protect
$250.00
$250.00
$500.00
$375.00
$375.00'
TOTAL
$11,000.00
$11,000.00
$22,00d.00
$16,500.00
$16;600A0
Remove & Recycle
$1,500.00
$1,500.00
$3,000.00
$2,250.00
$2,250.00
Install ice & water guard under gutters, extending upslope for width
-
of sheet.
$1,000.00
$1,000.00
- $2,000.00
$1,500.00
'$1,500.00
Install custom 24 ga. Galvanized gutters. All seams and outlets, into
downspouts, soldered. Reuse old downspouts.
$3,063.00
$3,063.00
$6.126.00
$4,594.50
$4,594.50
TOTAL
$5.563.00
$6,563.00
$11,121LD0
$8,344.50
$8,344.60
Repair of any rot during tear off -
$550.00
$550.00
51,100.00
$825.00
$825.00
Remove decking to allow insulation & replace
$560.00
$560.00
$1,120.00
$840.00
$840.00
TOTAL "
$1,110.00
$1,110.00
$2,220.00
$1.665.00
$11666.0Q
Insulate roof with cellulose blown -in, in rafter space.
$750.00
$750.00
$1,500.00
$1.125.00
$1,125.00
clean-up
$100.00
$100.00
$200.00
$150.00
$150.00
.TOTAL
$850.00
$850.00
$1,700.00
$1,275.00
$1;275.00
-F
Barricades 8 Barriers
$0.00
$0.00
$0.00
$0.00.
$0.00
Permits
$1,310.00
$1,310.00
$2,620.00
$1,965.00
$1,965.00.
Overhead 8 Profit
$2,223.00
$2,223.00
$4,446.00
$3,334.50
$3.334.50
Grant Management 6%
$2,328.00
$319.00
'$2,647.00
-$1,985.25
.$0.00
General Totals
$5,861.00
$3,852.00
$9,713.00
$7,284.75
$5,299.50
Reserve (contingency).5%
$1739.00-
$1739.00
$3478.00
$2608.50
$2608.50.
TOTALS
526.123.00
124.114.00
650.23700
53767779