ADDENDUM NO. 1
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of BID 7570: Home Efficiency Reporting Program
OPENING DATE: 3:00 PM (Our Clock) November 22, 2013
To all prospective bidders under the specifications and contract documents described
above, the following changes/additions are hereby made and detailed in the following
sections of this addendum:
Exhibit 1 – Questions & Answers
Please contact Pat Johnson, CPPB, Senior Buyer at (970) 221-6816 with any questions
regarding this addendum.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN
STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS
ADDENDUM HAS BEEN RECEIVED.
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
fcgov.com/purchasing
Addendum 1 – 7570 Home Efficiency Reporting Program Page 2 of 3
EXHIBIT 1 – QUESTIONS & ANSWERS
Q1. In Section I, Background, Purpose & Objectives, page 3, A, Background: Does
the Siemens Energy Engage Platform currently provide water consumption
information? Any other water information?
A1. The Energy Engage Platform will display interval water use data (1 hour
interval) and water conservation tips.
Q2. In Section I, Background, Purpose & Objectives, page 3, A, Background: Will all
water meters be replaced with AMI meters in the first quarter of 2014? If not,
what will be the installation rate and timing?
A2. 99+% of all electric and water meters will be installed by the end of
2013.
Q3. In Section I, Background, Purpose & Objectives, page 3, C, Objectives: What is
Utilities’ water efficiency objective? (please use quantitative goals if available,
such as GPCD, and describe Utilities’ current baseline)
A3. The current Water Conservation Plan goal is 140 gallons per capita per
day (GPCD). Average usage from 2004-2011 is 151 GPCD.
Q4. In Section II, Scope of Work, page 4, C, Option 1: How have personal energy-
efficiency goals been set in the past?
A4. Customers receiving Home Energy Reports have the ability to set a
household goal via the O-power web portal.
Q5. In Section II, Scope of Work, page 4, C, Option 1: Does the City intend to
implement any demand response programs for water, for either residential or
irrigation-only customers?
A5. No demand response programs are currently being planned for water
use.
Q6. In Section II, Scope of Work, page 5, C, Option 1: Has the City already
established criteria for when they wish to notify customers of a leak, based on
AMI data? For example, after 3 days of continuous use? Shall vendor propose a
closed loop system to ensure that responses to such alerts are returned to the
City?
A6. The City has not yet established firm criteria for leak notification. Vendor
is welcome to propose recommendations for criteria and or notification.
Q7. In Section II, Scope of Work, page 5, C, Option 1: Are the outdoor irrigation
customers associated with additional indoor/outdoor accounts? Do some
accounts have separate irrigation-only meters?
A7. Approximately 650 customer accounts are irrigation only.
Addendum 1 – 7570 Home Efficiency Reporting Program Page 3 of 3
Q8. In Section II, Scope of Work, page 5, C, Option 1: What customer classes would
receive water reports? (e.g. single-family residential, commercial, multi-family
dwellings, institutional, irrigation-only, municipal, etc.) If only single-family
residential and outdoor irrigation, will other customer classes be provided with
AMI water data?
A8. Residential single family customers with separate metering would
receive reports.
Q9. In Section II, Scope of Work, page 6, Option 1, D, Program Management
Capabilities: Are there examples of customer segmentation? Are there particular
attributes/segments the City wishes to distinguish?
A9. The City has limited experience with customer segmentation. Recent
analysis has included segmentation by home age (decades), home
electric use (200 kWh bins) and Nielsen Prizm Lifestage segments.
Q10. In Section IV, Instructions for Proposal Submission, page 10, 1. Cover Letter:
What is the declaration that must be included on the Cover Letter?
A10. Please disregard this statement.