Loading...
HomeMy WebLinkAboutRFP - 7598 BACKFLOW PREVENTION PROGRAM MANAGEMETNAddendum 1 – 7598 Backflow Prevention Program Page 1 of 2 ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of BID 7598: Backflow Prevention Program OPENING DATE: 3:00 PM (Our Clock) March 14, 2014 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: Exhibit 1 – Questions & Answers Please contact Pat Johnson, CPPB, Senior Buyer at (970) 221-6816 with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing EXHIBIT 1 – QUESTIONS & ANSWERS Addendum 1 – 7598 Backflow Prevention Program Page 2 of 2 1. Our experience suggest that supporting 2700 test reports/year would mean a minimum of 10 simultaneous connection are required to support your testers. Our software is partially priced based on the number of simultaneous connections needed. Would you possibly want more? Please provide your price to include ten (10) simultaneous connections. A separate unit price can be proposed for additional connections above ten (10). 2. We understand that you want the system to accommodate two in house administrative users. Is there any expectation of needing or wanting more than two? Please provide a price to include two (2) in-house users and a price per use in the event that we add more in the future. 3. Our experience with utility districts has been that testers that file reports to the district are usually registered and validated in person with the district before being given a tester number. However, there are rare instances of districts enabling testers to register online. Will your testers already be registered and have a tester number before they will be able to file test reports online? No 4. What operating system will you be using? Windows Server 2008, r2. 5. In Section I. Project Description, it says "...the Contractor will be reimbursed for services through a minimal fee to the customers for the backflow testing." Does the customer, as far as the cost of a backflow test, pay the City and pay the tester? Are they writing two checks instead of one? One check, the City of Fort Collins will not be getting paid. 6. In. Section II.B.3 Scope, it says "Notifications shall include...". Does the awarded Contractor need to include in mailed notices a list of certified testers to the customer or direct them elsewhere? Details such as this will be worked out with the awarded contractor. 7. In Section II.B.8 Scope, it says "To reiterate...". Does the tester need to request authorization from the awarded Contractor to perform a test? No