HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9142898BELAIR
SITEWORK SERVICES
Invoice
To: City of Fort Collins
Invoice: 19295
PO Box 680
Invoice Date: 05/13/14
Fort Collins. CO 80522
Due Date: 06/12114
Customer Reference: 167249001
Contract: 10209- Foothills (CBC) Mall
Redevelopment
Remove & Replace Curb & Gutter
Work Completed On: 4111114
See Attached for Detail
vtatean8 itor o
F34t:h
p rr' Wh d
Am& MtSC— cAnc.iii'44
wa*o,drrri_ f1
erprWurt 1����
INVOICE TOTAL:
LS
6.340.00
�4s.cw
pM -rAks A r om+ -im. &149.O0
7630 Dahlia St, Commerce City, CO 80022
Phone: 303.394.1300 Fax:303.394.1301
belair•us.com
Equal Opportunity Gmployer
6,340.00
BELAIR
SITEWORK
SERVICES
Subcontractor Change Order
Request W orksheet
Project: Foothills CBC
EWO#
RCO#
Subcontractor: Belair Sitework Services
Contact:
Mike Ehardt
Phone#: 720-939-6636
Document that Initiated the Change (AS] or RFI #)
Description of scope change: Remove C&G and replace with as stated below
Work performed by Subcontractor
Line la. Dircrl Material Cnsn
Materials
Rate
Cost
S
Quantity
$
VC6
$ 19.50
61.00
S
1,189.50
VCNSW
S 19.50
95.00
S
1.852.50
Vtlt-- To 6t: PA&0 (k.IVA CAXDER
sawcuffing
$ 2.00
60.00
S
120.00
Tandum Truck
$ 70.00
8.00
$
560.00
Line lb. Subtotal Direct Material Cost
Line Ic. Subcontractor's Overhead & Proiit:
15.00%
S
3,917.00
$
587.55
Line Id. -I Materials:
Line 2a. Labor
Rate
I
I
Cost
ST
SMour
Duration
S
Operator
f 51.21
8.00
S
409.68
Field Superintendent
f 72.03
1 4.00
1 S
288.20
Laborer
S 34.44
1 8.00
1 S
275.52
I f 973.40 I
Rate
I
I Cost
OT
SIHour
Duration
S
operator
S 76.82
S
Field Superintendent
$ 108.08
1
1 S
Laborer
$ 31.66
1
Is
Line 2b. Total Labor
llmlla_ Enuipment
S 4,504.55
Is I
$ 973.40
Rate
I
I Cost
Sffl2a
I Duration
S
JD410 Backhoe 436 Tractor
f 96.00
8.00
$ 768.00
E
S
Igoe 3b. Total Equipment
Subtotal CO Proposal
Subcontractor's Bead Costs
Grand Total Change Order Proposal
Contract Time - Completion Date (is) (is not) extended
IS 768.00 I
S 768,00
$ 6,245.95
1.500/. S 93.69
f 6,340.00
.-1RS D
TBD Calendar Days as a result of this Proposal
Page 1 of 1
John Stephen
From:
John Stephen
Sent:
Friday, April 11, 2014 12:40 PM
To:
Darren Moritz
Cc:
Tom Knostman; Brenda VanDyke; Angel Ontiveros; Gerry S. Paul
Subject:
RE: update 4/7 Mall Frontage Road - Curb Repairs
Darren, I am ok with this, but they need to provide the City with minimum i million dollar insurance for automobile and
general liability naming the City as an additional insured. John
John Stephen, CPPO, LEED AP
Senior Buyer
215 N Mason
City of Fort Collins
970-221-6777
From: Darren Moritz
Sent: Friday, April 11, 2014 10:25 AM
To: John Stephen
Cc: Tom Knostman; Brenda VanDyke; Angel Ontiveros
Subject: RE: update 4/7 Mall Frontage Road - Curb Repairs
Importance: High
Hi John,
Please see below. The total is now over $5,000 as they were only recently able to finalize what repairs were required.
We received the estimate this morning. I wanted to pass this by you before we have them proceed. Time is of the
essence as it looks like the contractor needs to know today. Sorry for that part. It appears to be a win win for everyone
since they are already out on site and the road is closed.
We compared it to what it would cost us to have Vogel do the work and it is lower. Is it ok to proceed and have them bill
us? If so, what do we need to do on our end. Thanks for your consideration.
Fort Cotl!ns
Darren Moritz
Street Maintenance Program Manager
P. 970-221-6218 // c. 970-556-1495
e. dmoritz@fcgov.com // w. fcgov.com/streets
Physical Address: 625 Ninth Street
Mailing Address: PO Box 580, Fort Collins, CO 80522
From: Angel Ontiveros
Sent: Friday, April 11, 2014 9:41 AM
To: Brenda VanDyke; Darren Moritz; Tom Knostman
Subject: RE: update 4/7 Mall Frontage Road - Curb Repairs
Darren, Tom I say we let them do this work. Vogel's cost to do this would be $6,209.24 plus traffic control
Bleair/Standard price will actually be $6,145.00 cause Jim Carder is paying $195.00 for his portion. $6,145 + $195 =
$6,340.00
11 Fo`�rt Collins
Angel Ontiveros
Construction Inspector
p. 970.221.6615 // c. 970.218,1973
e. aontiverosCo)fceov.com // w. fcgov.com/streets
Physical Address: 625 Ninth Street
Mailing Address: PO Box 580, Fort Collins, CO 80522
From: Brenda VanDyke
Sent: Friday, April 11, 2014 9:23 AM
To: Darren Moritz; Tom Knostman; Angel Ontiveros
Subject: FW: update 4/7 Mall Frontage Road - Curb Repairs
Streets -can we get an answer today if you want Belair/Standard to make repairs on the west side of the Frontage Road
(please see attachment for estimate)
From: Mike Ehardt [mailto:Mike.Ehardt0belair-us.com]
Sent: Thursday, April 10, 2014 4:44 PM
To: Brenda VanDyke
Subject: RE: update 4/7 Mall Frontage Road - Curb Repairs
Hello Brenda,
Please find attached Belair's proposal to remove the C&G and replace.
If you have any questions please call
Thanks
Michael S Ehardt
Estimator/Project Manager
Belair Sitework Services/CO Branch
Office:303.394.1300
Cell: 720.939.6636
mike.ehardtC@belair-us.com
www.belair-us.com
From: Brenda VanDyke [mailto:BVANDYKECalfcgov.com]
Sent: Monday, April 07, 2014 3:28 PM
To: 'Greg Powell (GregPowell(fteckgroup.com)'; 'Denece Child (DeneceChildCcbbeckgroup.com)'; Bob Clark; Mike Ehardt
Cc: Robert Mosbey; Angel Ontiveros; Darren Moritz; Tom Knostman; James Carder
Subject: update 4/7 Mall Frontage Road - Curb Repairs
The City is requesting additional repairs (west side of Frontage Road) which will be billed as follows:
SMP (Street Maintenance Program)
• 61 LF of VC6
• 95 LF of VCNSW
Water Department (Jim Carder)
• 10 LF VC6
To update, I am still waiting on numbers from Beck/Standard for an estimate.
From: Brenda VanDyke
Sent: Wednesday, March 26, 2014 9:12 AM
To: Greg Powell (GregPowell(abeckgroup.com); Denece Child (DeneceChild(@beckgroup.com); Bob Clark
(bob.clark(glbelair-us.com); Mike Ehardt (Mike.Ehardt(abelair-us.com)
Cc: Robert Mosbey; Angel Ontiveros; Darren Moritz; Tom Knostman
Subject: update 3/26 Mall Frontage Road - Curb Repairs
Beck and Belair-
On the west side of the Frontage Road there are concrete repairs that the City would like to participate and pay for
those sections that are marked in white. I completed the final inspection today and the results include
1. 61 LF of VC6 (vertical curb at 6")
2. 95 LF of VCNSW (vertical curb no sidewalk)
Can you please give us an estimate from Standard Concrete to complete these repairs? We do not want to start the
"white" removals until we have a price but if they are reasonable then we would like to include these items before the
paving begins.
Thank you,
Brenda Van Dyke
Construction Inspector
City of Fort Collins Engineering Department
970-232-5515
bvandvke &fcgov.com
From: Angel Ontiveros
Sent: Friday, March 14, 2014 1:22 PM
To: Darren Moritz
Cc: Tom Knostman; Brenda VanDyke; Robert Mosbey
Subject: RE: Mall Frontage Road - Curb Repairs
We were not able to see the curb from the north end of Markley Motors up to the north EOL we will look at it when the
dirt stockpile gets removed, but as of now there is
1. 41 LF of VC6
2. 75 LF of VCNSW
3. Removals = 547.75
4. Replace = 2568.35
S. For a total of $3116.10
c ty of
Collins
Angel Ontiveros
Construction Inspector
p. 970.221.6615 // C. 970.218,1973
e. aontiveros@fceov.com // w. fcgov.com/streets
Physical Address: 625 Ninth Street
Mailing Address: PO Box 580, Fort Collins, CO 80522
From: Darren Moritz
Sent: Friday, March 14, 2014 11:09 AM
To: Robert Mosbey
Cc: Tom Knostman; Brenda VanDyke; Angel Ontiveros
Subject: FW: Mall Frontage Road - Curb Repairs
Angel is with Brenda right now on another project they will look at these repairs. I will have Angel evaluate and get me
an estimate. When do you need to have an answer? Early next work? When is work scheduled?
Thanks,
CIty:4f
Fart C01111s
Darren Moritz
Street Maintenance Program Manager
p. 970-221-6218 // c. 970-556-1495
e. dmoritz@fceov.com // w. fcgov.com/streets
Physical Address: 625 Ninth Street
Mailing Address: PO Box 580, Fort Collins, CO 80522
From: Robert Mosbey
Sent: Friday, March 14, 2014 9:53 AM
To: Darren Moritz
Cc: Brenda VanDyke; Douglas E Groves
Subject: Mall Frontage Road - Curb Repairs
Darren,
It was brought to our attention that there is about 100' or so of curb along the west side of the frontage road (where
they're working) that is in need of repairs. Belair is willing to have their contractor make the repairs, but would like to
know who will pay for this additional work.
This was originally scheduled to be addressed by SMP so I'm asking if you all (Streets) would cover the cost of the curb
repairs on the west side of the road. Belair is responsible for everything on the east and on College.
Let me know as soon as possible as we need to inform the contractor whether or not to do the work before they pave
the frontage road.
Brenda, please correct me if I left out any important details.
Thanks,
Rob V. Mosbey
Engineering Project Manager
Engineering Department
rmosbevCdfcgov.com
(970) 221-6659 (once)
(970) 213-8537 (cell)
(970) 221-6378 (fax)
yANN/.fcgoy.com/engineering