PROJECT TITLE: W. Prospect Bridge Replacement
PROJECT NUMBER: 254902108 (Bid #7557)
CONTRACTOR: Mountain Constructors, Inc. (PO #9135934)
CHANGE ORDER NUMBER: 4
In preparing change orders show in order as separate numbered paragraphs the following
1. Reason far change. 2 Description of change.
3. Change In contract cost. 4. Change in contract time.
1&2. See attached sheet for detail.
3. The contract cost will increase by
4. Thera will be no change In contract time.
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % THIS CHANGE ORDER
TOTAL C.O. %. OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all change orders epprc"d)
ACCEPTED BY;
(Contractor's Rep eser
r�l+- REVIEWED BY: L.
SUBMITTED BY:
APPROVED BY:
$ 11,115.36
1.39%
4,28%
$798,879.75
$23.040.55
$D.00
$11.115.36
$833,035.68
DATE: j
DATE: [� % l Y
cam
DATE:
APPROVED BY: " DATE:
(Purchasing Agent over $60,000)
ar Contract"
Pwchaeing
P1ult"Flle
J
6 -g.ly
Pmapact New Mamereddpa
MMtYoF
Item# item Quantity UNt Sr(kit Tmm
1
Slump Grinding
1
LS
$ 470.OD
S 470.00
2
Modify FES for grading
1
LS
$ 1,950.00
$ 1,950.DO
3
Curb, Gulter, and Bike Lane (Special)
146
LF
$ 48.00
$ 7,008.00
4
1 1/2' Washed Rock for Muck Excavation Backfill
196
TON
S 36.00
S 6,687.36
5
GROUND WATER TREATMENT FORCE ACCOUNT
-1
LS
S 5,000.00
.$ 5,000.00
TOTAL
$11,116.36
..wr y;.:13T_ai�a
,T.L" ;: i^.2FN:i 3REA80N FOR CNANOExaa 137
�" 3
A We. "': 7T 9
R� .m werirJi u�IlllYii ilimsOlm movi buUw�: r ?�! 1 4` is rjc�ar 4 I
%Z3`YY"s4
Molly FES MrpmAn80waa loulbn.yW�ak Mrlutled FEe MaL�Inpa bandM NiFEB lnAel�ga
. „f2
to. al8pfea removYp plpa amf mrKral.>
odBraM m8m4 M NW eloP�^>�% tt �=>2'.�, .+FF'.E.: h.?"�a:�"-�a,.�s�,i Fya� �'z�.�y' y#r Sty* '•
3i�.S:
3452-Rawn�ceaplslad
Ouan4l aWlr gNer, rwnvna uwerwrt�"P'E`^"a'ya
AN
-EIEm�.iSN .^A'(e'�Tib y't Y.:aca-3v-irv.- _ ....F
See Attached Documentation
Posted to Pay AM a6
April 21, 2014
Mark Laken
Engineering Department
City of Fort Collins
281 North College Avenue
Fort Collins, Colorado 80522-058D
RE: West Prospect Road Bridge Replacement
Dear Mark,
Paid on Pay,
Quantity
As a follow up to the tree removal addressed in my letter dated March 21, 2014 we had
the stump ground down last week. The cost to grind the stump was $470.00.
Pease review this information and if you have any questions or need additional
information please call me at 303-910-4102.
TAaD
Pn
Vtce President
P.O.SOX405 • PLATTEVILLE, COLORADO 80651-0405 • (970)7&58181
April 16, 2014
Mark Laken
Engineering Department
City of Fort Collins
281 North College Avenue
Fort Collins, Colorado 80522.0580
RE: West Prospect Road Bridge Replacement
Dear Mark,
Per our onsite discussion regarding the solution of the lack of fill above the 15' RCES it
is our understanding that we will perform the following work
Remove the existing riprap and expose the 15" RCES. Then remove the existing
15" RCES. Extend the 15' RCES by creating a 45 degree bend U with the use
of sono-tube, pipeand concrete. Place the 15' RCES back on the end of the
'new' section of pipe. Place the riprap as directed.
The cost to perform the work as described above is $1,950.00. Please review this
information and if you have any questions or need additional information call me at 303-
910-0102.
Thank q,
mela can
Vice President
P.O. BOX 405 • PLATTEVILLE, COLORADO 80651.0405 • (970) 765-6161