Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7557 WEST PROSPECT ROAD BRIDGE REPLACEMENT AT NEW MERCER DITCH (4)City of Planning, Development & Transportation Fort Collins 281NoMC 291 OM CdleOe Avenue Engineering P-OAM5e0 FM CollW. CO e05=5e0 970.T31.0005 970.M.6379-px Change Order Form PROJECT TITLE: W. Prospect Bridge Replacement PROJECT NUMBER: 254902108 (Bid #7557) CONTRACTOR: Mountain Constructors, Inc. (PO #9135934) CHANGE ORDER NUMBER: 4 In preparing change orders show in order as separate numbered paragraphs the following 1. Reason far change. 2 Description of change. 3. Change In contract cost. 4. Change in contract time. 1&2. See attached sheet for detail. 3. The contract cost will increase by 4. Thera will be no change In contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % THIS CHANGE ORDER TOTAL C.O. %. OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders epprc"d) ACCEPTED BY; (Contractor's Rep eser r�l+- REVIEWED BY: L. SUBMITTED BY: APPROVED BY: $ 11,115.36 1.39% 4,28% $798,879.75 $23.040.55 $D.00 $11.115.36 $833,035.68 DATE: j DATE: [� % l Y cam DATE: APPROVED BY: " DATE: (Purchasing Agent over $60,000) ar Contract" Pwchaeing P1ult"Flle J 6 -g.ly Pmapact New Mamereddpa MMtYoF Item# item Quantity UNt Sr(kit Tmm 1 Slump Grinding 1 LS $ 470.OD S 470.00 2 Modify FES for grading 1 LS $ 1,950.00 $ 1,950.DO 3 Curb, Gulter, and Bike Lane (Special) 146 LF $ 48.00 $ 7,008.00 4 1 1/2' Washed Rock for Muck Excavation Backfill 196 TON S 36.00 S 6,687.36 5 GROUND WATER TREATMENT FORCE ACCOUNT -1 LS S 5,000.00 .$ 5,000.00 TOTAL $11,116.36 ..wr y;.:13T_ai�a ,T.L" ;: i^.2FN:i 3REA80N FOR CNANOExaa 137 �" 3 A We. "': 7T 9 R� .m werirJi u�IlllYii ilimsOlm movi buUw�: r ?�! 1 4` is rjc�ar 4 I %Z3`YY"s4 Molly FES MrpmAn80waa loulbn.yW�ak Mrlutled FEe MaL�Inpa bandM NiFEB lnAel�ga . „f2 to. al8pfea removYp plpa amf mrKral.> odBraM m8m4 M NW eloP�^>�% tt �=>2'.�, .+FF'.E.: h.?"�a:�"-�a,.�s�,i Fya� �'z�.�y' y#r Sty* '• 3i�.S: 3452-Rawn�ceaplslad Ouan4l aWlr gNer, rwnvna uwerwrt�"P'E`^"a'ya AN -EIEm�.iSN .^A'(e'�Tib y't Y.:aca-3v-irv.- _ ....F See Attached Documentation Posted to Pay AM a6 April 21, 2014 Mark Laken Engineering Department City of Fort Collins 281 North College Avenue Fort Collins, Colorado 80522-058D RE: West Prospect Road Bridge Replacement Dear Mark, Paid on Pay, Quantity As a follow up to the tree removal addressed in my letter dated March 21, 2014 we had the stump ground down last week. The cost to grind the stump was $470.00. Pease review this information and if you have any questions or need additional information please call me at 303-910-4102. TAaD Pn Vtce President P.O.SOX405 • PLATTEVILLE, COLORADO 80651-0405 • (970)7&58181 April 16, 2014 Mark Laken Engineering Department City of Fort Collins 281 North College Avenue Fort Collins, Colorado 80522.0580 RE: West Prospect Road Bridge Replacement Dear Mark, Per our onsite discussion regarding the solution of the lack of fill above the 15' RCES it is our understanding that we will perform the following work Remove the existing riprap and expose the 15" RCES. Then remove the existing 15" RCES. Extend the 15' RCES by creating a 45 degree bend U with the use of sono-tube, pipeand concrete. Place the 15' RCES back on the end of the 'new' section of pipe. Place the riprap as directed. The cost to perform the work as described above is $1,950.00. Please review this information and if you have any questions or need additional information call me at 303- 910-0102. Thank q, mela can Vice President P.O. BOX 405 • PLATTEVILLE, COLORADO 80651.0405 • (970) 765-6161