PROJECT TITLE: Arthur Ditch CBC at Mtn. & Myrtle Bridge Rpclmt.
PROJECT NUMBER: 254902105 (Bid #7558)
CONTRACTOR: .Zak Dirt (PO #9135003)
CHANGE ORDER NUMBER: 5
In preparing change orders show in order as separate numbered paragraphs the following:
1. Reason for change. 2. Description of change.
3. Change in contract cost 4, Change in contract time.
1;&2. See attached invoice for details
3. The contract cost will increase by $5,952.09
4. There will be no change in contract time.
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C:O_ % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
ACCEPTED[
REVIEWED E
SUBMITTED
APPROVED[
$924,949.05
$104,951.93
$0.00
$5,952.09
0.64%
11.99%
$1,036,853.07
APPROVED BY: 1
T(D.panrnentHead)
DATE:
APPROVED BY: DATE:
(Purchasing Agent over $60,000)
ar Contractor
Purchasty
Project File
$5.952.09 Erginewirlg
$0.00 U80tles
CNANGEORDERNYS
.mlr�eY au-- :v' xXI-r,: I I •h'•:1 der.( Cmest
MUCK EXCAVATION
CV
1 351.W
uNeP41E)T
557.X
.Oi.nuV
Am"waG pl �5
oaumtl
Amaumlfl
1
2W
5200070D
5104
$29092.80
159.40
$9W5.W
2
2W
SHORINGAREA2
LS
100
S12W0.W
512000.00
0.0
Saw
-1.W
412WO.W
3
206
STRUCTURE BACKFILL FLOWFILL
CY
40
5115O0
$4,500.00
15.0
$1,T25.W
-YS.W
42,87S.W
4
208
VEHICLE TRACKING PAD
EA
2.W
S15W.W
53000.W
0.0
50.00
-2W
43WO.W
6
210
ADJUST MANHOLE
EA
2W
55W.W
511W.W
3.0
316W.W
1.W
$550.W
6
210
ADJUST AGE
EA
1.W
5340.00
5340.W
3.0
E1.OW.W
2.W
5680.W
7
403
HOT MIX ASP"LT GRADINGS 75 PG6422
TON
185.00
5140.W
S259X.W
00
W.W
-185.0
425900.W
8
4W
HOT MIX ASPHALT jGRAOING SG 75 PG 64-221
TON
371.W
5125.W
548375.W
579.34
$72417.W
26.34
$26042.50
9
420
GEOSYNTHETIC PAVEMENT INTERLAYER
SV
W.W
552.W
$3,V6.W
0.0
WX
-0.00
-$3276.W
10
WI
CONCRETE CLASSD
CY.
414.00
$385.W
E159,390.W
425.0
5163uti.W
11.W
54235.W
11
602
REINFORCING STEEL EPDXY COATED
LS
152947.W
SO.W
5137652.30
151.633.0
5136469.70
-1314.00
41182.60
12
603
101NCH SUN 35 PVC PIPE
LF
2.W
S230.W
3480.W
16.5
33,8U)W
14.52
1 $3.W.W
13
COt-002
TRAFFIC CONTROL MANAGEM ENT
DAY
20.W
5440.00
SBeX.W
00
50.W
-20,W.
488W.W
1A
COJ-03
FLAGGINGMOUNTAIN AVENUE
HR
1W.00
E17.W
52720.W
00
$0.00
-160.W
42720.X
15
202
REMOVAL OF CURB AND GUT TER fMOUWWN AVE
LF
I 41.X
$275
511275
91.0
S2W.25
W.W
$137.50
i6
202
REMOVAL OF DRIVE MOUNTAIN AVE
SY
MIX
S24.00
$1344.W
36.0
$854.00
-20.W
441M).X
1]
202
REMOVAL OF CONCRETE PAVEMENT MOUNTAIN AVE
SY
114W
$16.00
51824.X
192.4
$078.40
78.40
51254A0
18
I 202
R DVAL OF SIDEWALK MOUNTAIN AVE
SY
6.W
E7.W
W0. W
17.2
129.W
11.20
$84.X
19
202
REMOVAL OF SIDEWALK MYRTLES
SY
2t.X
S7.W
$15T50
26.0
5195.X
5W
63ZW
ZD
412
CONCRETE PAVEMENT SINC MOUNTAI
SY
114.W
$75.X
36,6W.X
2 A
E198W.X
148.40
5111 W.W
21
412
CONCRETE DRIVEWAY 01NCH MOUNTAIN
SY
56.W
3W.W
3260().W
36.0
31acXL
-20.W
Si XO.X
22
602
EPDXY COATED REBAR MOUNTAINAVE
US
4500.W
saw
E4050.W
2262.0
32035.80
-22W.W
-$014.20
23
808
CONCRETE SIDEWALK 61NCH MOUNTAIN
SY
6.W
I WW
5216.Wi
17.2
5019.20I
11.20
54X.20
24
6W
CURBAND GUTTER MOUNTAIN
LF
41.W
i E19.W
E779.W
95.0
31 W6X
54.X
$1026.W
25
CO4-001
GEOGRID
ROLL
O.X
5478.]8
W.X
3.W
51436.34
3.W
$1438.34
TONS.
OW
$12.11
W.X
615X
E7,44]85
B15.X
37447.65
28
27
CO4-002
C0441X
PITRUN
TRAFFIC CONTROLAT MYRTLE STREET LANDSCPPINGPHASE
DAV
O.W
E185.X
W.W
14.X
E2.31OW
t4.X
$2310.X
$5,952.W
�.1
1
ABaiecnel muck e%CanaWan W renWve unauass. material a,M la Street
2
De etion of this line item since It was vol used.
3
Ratlucdon of this line Item to accuralel refledwhal was usetl on me
'ad. 15 CY usetl at Mountain Avenue.
4
Redudlan d this line item W.2=ro2--whM was usea on ma
5
Adddalal cpantity to Isoosrately reflect what was used On me
eel.
e
AOE 6IXIBI een W al re W Wnatwas used an m0
7
oIZR _
Redudlan al Chia llna Item to accuretel reMOf what was uaetl on me . T metes halt Wasrem9vetlfrom0m act
a
al u W el re W1letwas usetl On me Jed.
9
Retludian ofthi� Iina Item W eccurelel refledwhat wu usetl on me ecl Gees nme5c vemanl inha Cwes removed from Jed
RWUC is iWm W .1
t0
AtltllOorel uerd t0 ecOuatel rellectwretwasused Onme Jett.
ti
Addidorel uan0 WacdaeWl reeecl what was wed do me 'ad.
ToWimsttoplaw761tl ItSetWP wasaoudadto WAf. 1658reAodstha ecuWl mstW 1"761fof Ieat55Wf.
12
13
Detanon of this line item si os It was net used.
14
Deletion of this line item since it was not used.
45
Additional gnb to aosIsnaleiv ralle0t what was used on me protect.
16
Retludonafthialire item to eccuret reAadwhat Was usetl on me act.
17
Add emil nu W ecdaate reaed what was used on me profem.
16
A6d6ona ntl W a=atelv MW What was used ere the
eel.
19
Aeciamul uen6 toeaurotel revelwhatwaauaetlenme oeel.
20
AddaMel uanti Wasocaatel re8eclwhatwasuM400thB
led:
21
ReduNan of Nis Lim item W emuretel re5edwnet was usea Bn me act
22
Retluoeon of thistine item W aavretel rde whatwas used do ma act.
23
Ks
Aaddorel reld Waccuratel MKs what was usetl on the
24
da0m uerm WaccureWl re Onthe ec1.
25
G 'd edtletl W me Jed to atldess soft spotsinthesxigraceitt Mwfie Street.
Pimm aatled to Ole Jed W addles son s to in vas sulade m: MY119SUeet. "
28
27