Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7558 ARTHUR DITCH CBC REPLACEMENT AT MOUNTAIN AVE & MYRTLE STREET (5)tWN City. Of Planning, Development & Transportation y CollinsEngineering T � 261 North COliege Avenue - ` P.O. Box 580 Engineering Fort Culrins, CO 80522.0580 970.221.6605 970.221.6378-fax Change Order Form PROJECT TITLE: Arthur Ditch CBC at Mtn. & Myrtle Bridge Rpclmt. PROJECT NUMBER: 254902105 (Bid #7558) CONTRACTOR: .Zak Dirt (PO #9135003) CHANGE ORDER NUMBER: 5 In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change. 2. Description of change. 3. Change in contract cost 4, Change in contract time. 1;&2. See attached invoice for details 3. The contract cost will increase by $5,952.09 4. There will be no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C:O_ % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED[ REVIEWED E SUBMITTED APPROVED[ $924,949.05 $104,951.93 $0.00 $5,952.09 0.64% 11.99% $1,036,853.07 APPROVED BY: 1 T(D.panrnentHead) DATE: APPROVED BY: DATE: (Purchasing Agent over $60,000) ar Contractor Purchasty Project File $5.952.09 Erginewirlg $0.00 U80tles CNANGEORDERNYS .mlr�eY au-- :v' xXI-r,: I I •h'•:1 der.( Cmest MUCK EXCAVATION CV 1 351.W uNeP41E)T 557.X .Oi.nuV Am"waG pl �5 oaumtl Amaumlfl 1 2W 5200070D 5104 $29092.80 159.40 $9W5.W 2 2W SHORINGAREA2 LS 100 S12W0.W 512000.00 0.0 Saw -1.W 412WO.W 3 206 STRUCTURE BACKFILL FLOWFILL CY 40 5115O0 $4,500.00 15.0 $1,T25.W -YS.W 42,87S.W 4 208 VEHICLE TRACKING PAD EA 2.W S15W.W 53000.W 0.0 50.00 -2W 43WO.W 6 210 ADJUST MANHOLE EA 2W 55W.W 511W.W 3.0 316W.W 1.W $550.W 6 210 ADJUST AGE EA 1.W 5340.00 5340.W 3.0 E1.OW.W 2.W 5680.W 7 403 HOT MIX ASP"LT GRADINGS 75 PG6422 TON 185.00 5140.W S259X.W 00 W.W -185.0 425900.W 8 4W HOT MIX ASPHALT jGRAOING SG 75 PG 64-221 TON 371.W 5125.W 548375.W 579.34 $72417.W 26.34 $26042.50 9 420 GEOSYNTHETIC PAVEMENT INTERLAYER SV W.W 552.W $3,V6.W 0.0 WX -0.00 -$3276.W 10 WI CONCRETE CLASSD CY. 414.00 $385.W E159,390.W 425.0 5163uti.W 11.W 54235.W 11 602 REINFORCING STEEL EPDXY COATED LS 152947.W SO.W 5137652.30 151.633.0 5136469.70 -1314.00 41182.60 12 603 101NCH SUN 35 PVC PIPE LF 2.W S230.W 3480.W 16.5 33,8U)W 14.52 1 $3.W.W 13 COt-002 TRAFFIC CONTROL MANAGEM ENT DAY 20.W 5440.00 SBeX.W 00 50.W -20,W. 488W.W 1A COJ-03 FLAGGINGMOUNTAIN AVENUE HR 1W.00 E17.W 52720.W 00 $0.00 -160.W 42720.X 15 202 REMOVAL OF CURB AND GUT TER fMOUWWN AVE LF I 41.X $275 511275 91.0 S2W.25 W.W $137.50 i6 202 REMOVAL OF DRIVE MOUNTAIN AVE SY MIX S24.00 $1344.W 36.0 $854.00 -20.W 441M).X 1] 202 REMOVAL OF CONCRETE PAVEMENT MOUNTAIN AVE SY 114W $16.00 51824.X 192.4 $078.40 78.40 51254A0 18 I 202 R DVAL OF SIDEWALK MOUNTAIN AVE SY 6.W E7.W W0. W 17.2 129.W 11.20 $84.X 19 202 REMOVAL OF SIDEWALK MYRTLES SY 2t.X S7.W $15T50 26.0 5195.X 5W 63ZW ZD 412 CONCRETE PAVEMENT SINC MOUNTAI SY 114.W $75.X 36,6W.X 2 A E198W.X 148.40 5111 W.W 21 412 CONCRETE DRIVEWAY 01NCH MOUNTAIN SY 56.W 3W.W 3260().W 36.0 31acXL -20.W Si XO.X 22 602 EPDXY COATED REBAR MOUNTAINAVE US 4500.W saw E4050.W 2262.0 32035.80 -22W.W -$014.20 23 808 CONCRETE SIDEWALK 61NCH MOUNTAIN SY 6.W I WW 5216.Wi 17.2 5019.20I 11.20 54X.20 24 6W CURBAND GUTTER MOUNTAIN LF 41.W i E19.W E779.W 95.0 31 W6X 54.X $1026.W 25 CO4-001 GEOGRID ROLL O.X 5478.]8 W.X 3.W 51436.34 3.W $1438.34 TONS. OW $12.11 W.X 615X E7,44]85 B15.X 37447.65 28 27 CO4-002 C0441X PITRUN TRAFFIC CONTROLAT MYRTLE STREET LANDSCPPINGPHASE DAV O.W E185.X W.W 14.X E2.31OW t4.X $2310.X $5,952.W �.1 1 ABaiecnel muck e%CanaWan W renWve unauass. material a,M la Street 2 De etion of this line item since It was vol used. 3 Ratlucdon of this line Item to accuralel refledwhal was usetl on me 'ad. 15 CY usetl at Mountain Avenue. 4 Redudlan d this line item W.2=ro2--whM was usea on ma 5 Adddalal cpantity to Isoosrately reflect what was used On me eel. e AOE 6IXIBI een W al re W Wnatwas used an m0 7 oIZR _ Redudlan al Chia llna Item to accuretel reMOf what was uaetl on me . T metes halt Wasrem9vetlfrom0m act a al u W el re W1letwas usetl On me Jed. 9 Retludian ofthi� Iina Item W eccurelel refledwhat wu usetl on me ecl Gees nme5c vemanl inha Cwes removed from Jed RWUC is iWm W .1 t0 AtltllOorel uerd t0 ecOuatel rellectwretwasused Onme Jett. ti Addidorel uan0 WacdaeWl reeecl what was wed do me 'ad. ToWimsttoplaw761tl ItSetWP wasaoudadto WAf. 1658reAodstha ecuWl mstW 1"761fof Ieat55Wf. 12 13 Detanon of this line item si os It was net used. 14 Deletion of this line item since it was not used. 45 Additional gnb to aosIsnaleiv ralle0t what was used on me protect. 16 Retludonafthialire item to eccuret reAadwhat Was usetl on me act. 17 Add emil nu W ecdaate reaed what was used on me profem. 16 A6d6ona ntl W a=atelv MW What was used ere the eel. 19 Aeciamul uen6 toeaurotel revelwhatwaauaetlenme oeel. 20 AddaMel uanti Wasocaatel re8eclwhatwasuM400thB led: 21 ReduNan of Nis Lim item W emuretel re5edwnet was usea Bn me act 22 Retluoeon of thistine item W aavretel rde whatwas used do ma act. 23 Ks Aaddorel reld Waccuratel MKs what was usetl on the 24 da0m uerm WaccureWl re Onthe ec1. 25 G 'd edtletl W me Jed to atldess soft spotsinthesxigraceitt Mwfie Street. Pimm aatled to Ole Jed W addles son s to in vas sulade m: MY119SUeet. " 28 27 IAd,uoh,j micX Ra al Myna Strad to accommMum me landscaping phase of the projeM