Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7545 OLD WATERWORKS ROOFING PROJECT■ CHANGE ORDER NO, t PROJECT TITLE: 7545 Old Watarxwrlca Roofing Paged CONTRACTOR: ZelglerCunstructionLLC PROJECT NUMBER:OP-45410 !vg13 S6 DESCRIPTION: a.+omaaaMeaMMMBL h%WdIr.10CMM„MM Fort Collins In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change: 41e Item dur9es hx u doreseen extra Mm end meWale 2. Description of change �rpenlry work, labor and materials, Repak (each, sash, crown molting, aiding eC rg. n mrous nage vent, gumm 3. Change In contract cast: $7284.86 4. Change In contract time: o Days (Attach additional sheets as required) ORIGINAL CONTRACT COST TOTAL APPROVED CHANOR ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER Total C.O. % of Original Contract ADJUSTED CONTRACT COST (Assumim all charms orders approved) ACCEPTED ACCEPTED BY: C- Project REVIEWED BY: 8.06% 8.05% K Fe v i` C-D710 - "t f &w-'! I ,F 6 Zo, - I T _� • _ i, APPROVED BY: Print Name Ifover $80,000-Pumc aft Director cc: City Cleric Protect Flle Contractor Purchasing Engineer $K63o.00 W814AS Date el- 7 20(Y Date Date IV ?ezlk/ Dale Dale