HomeMy WebLinkAboutCHANGE ORDER - BID - 7545 OLD WATERWORKS ROOFING PROJECT■
CHANGE ORDER NO, t
PROJECT TITLE: 7545 Old Watarxwrlca Roofing Paged
CONTRACTOR: ZelglerCunstructionLLC
PROJECT NUMBER:OP-45410 !vg13 S6
DESCRIPTION: a.+omaaaMeaMMMBL h%WdIr.10CMM„MM
Fort Collins
In preparing change orders show in order as separate numbered paragraphs the following:
1. Reason for change: 41e Item dur9es hx u doreseen extra Mm end meWale
2. Description of change �rpenlry work, labor and materials, Repak (each, sash, crown molting, aiding
eC rg. n mrous nage vent, gumm
3. Change In contract cast: $7284.86
4. Change In contract time: o Days
(Attach additional sheets as required)
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANOR ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
Total C.O. % of Original Contract
ADJUSTED CONTRACT COST
(Assumim all charms orders approved)
ACCEPTED
ACCEPTED BY: C-
Project
REVIEWED BY:
8.06%
8.05%
K Fe v i` C-D710 - "t f
&w-'! I ,F 6 Zo, - I T
_� • _ i,
APPROVED BY:
Print Name
Ifover $80,000-Pumc aft Director
cc: City Cleric Protect Flle
Contractor Purchasing
Engineer
$K63o.00
W814AS
Date
el- 7 20(Y
Date
Date IV
?ezlk/
Dale
Dale