Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7557 WEST PROSPECT ROAD BRIDGE REPLACEMENT AT NEW MERCER DITCH (3)I Planning, Development & Tra City of FF6rt Collins anylneaMy 2e1 NOM C011ege Avenue Engineering P.O. Box 580 FM Coyne, CO 80522.0580 970.2214505 970.2218578•rex Change Order Form PROJECTTITLE: W. Prospect Bridge Replacement PROJECT NUMBER: 25490210E (Bid #7557) CONTRACTOR: Mountain Constructors, Ina (PO #9135934) CHANGE ORDER NUMBER: 3 In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change. 2. Description of change. 3. Change In contract cost. 4. Change in contract time. 182. See attached sheet for detail. 3. The contract cost will increase by 4. There will be no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED BY: REVIEWED BY: SUBMITTED BY: APPROVED BY: APPROVED BY: W. contractor Purchasing Proled Fie $ 15,561.70 (Purchasing Agent over $60,000) 1.95% 2.68% DATE: 5798,879.75 $7,478.85 $0.00 $15,561.70 $821,920.30 Zl m -/V mm Prospect How Mercer Bridge Item # Item Quantity un*4 5/Unit Total 1 ISidawalk Special 69.151 SY $ 198.00 $ 13,691.70 2 lEmergency Tree Removal 11 EA $ 1,870.00 $ 1.870.00 TOTAL Posted to PayApp #5 $16,661.70 C7 March 25, 2014 Mark Laken Engineering Department City of Fort Collins 281 North College Avenue Fort Collins, Colorado 60522-0560 RE: West Prospect Road Bridge Replacement Dear Mark, On Friday, March 14, 2014, it became apparent to all parties that the pine tree located at the southwest comer of the structure was danger to all parties working in the ditch. We came to a quick conclusion that the tree must be removed and due to its size it was beyond our capabilities. We contracted Foothills Tree Experts to cut the tree down and we would remove it from the jobsite. The stump was left in place since we could not safely remove it. The price to have this tree cut down and removed at described is $1,870.00. If the City decides to grind the stump down we will need to revisit the cost of that work. Pease review this information and if you have any questions or need additional Information Please call me at 303-910-4102. Thank Pah�ela Duncdff REVIEWED,COWET AKEN NTSASMMD 0REJECTEDREVISSENO EXCEPTIONS MIDRESlJ9Mt Vice President VIEW IS ONLY FOR GENERAL CONFORMANCE WITH THE DESIGN C OF TIE PROJECTAND GENERAL COJpLWRCE WITH THE INFORMATION GIVEN IN TN E CONTRACT DOCUMENTS. ANYACTION SHOWN is SUBJECT TO,TNE RECUIRELENTS OF THE DRAWINGS AND SPECIFICATIONS. THE CONTRACTOR IS RESPONSIBLE FOR OWNSIONS WHICH SHALL W CONFRMED AND CORRELATED AT 'DATE: 1 P.O. BOX 405 • PLATlE'VIL.LE, J January 16, 2014 Mark Laken Engineering Department City of Fort Collins 281 North College Avenue Fort Collins, Colorado 80522-0580 RE: West Prospect Road Bridge Replacement Dear Mark, Pursuant to your conversations regarding the'Concrete Sidewalk (Special)' and how it was not in the bid schedule we are providing the following information. Item Description Qtv Unit Price Extended Amount Concrete Sidewalk (Special) 69.16 SY $ 198.00/SY $ 13,691.70 Please review this information and if you have any questions or need additional information please call me at 303-910-4102. Thank lumpedaa 6uuaau16u3 MW51H d0 83ON 3M CIWAWIOMJSLLMS 3N10NV'S30Vtll q=U:F Md HWLV3MYd 3US 103t101ld 3H1 1VMHUNN000NV03WmW 39 TM61CXHM SN01SN31000 1103 31WNUS31i! SI-WIDMt11N00 3H1 'S MVOId103dS OW MVMO 3Hl 4 9I1`1310w3N 3t1011 mnS SI NmOHS N0S9NI110VAW'S1N3W 0 Hm N3AIfl N011tlWiWjNi 3H1 H11N13ONVI1dW0O Wd3N30 Otry103f08d 3H1 d01d3ON0O NOIS30 3H1 Ht1m 3ONVIM DA031t183N30 y0 J A1N0 SI M3U13b 030311M13 0310NSVS1NMWW'03M31A3N❑ vraflS3llawWAU[] N3WiSN011d30X30WbFr P.O. BOX 405 • PLATTEVILLE, COLORADO 80651-0405 • (070) 786.6161