Change Order Form
PROJECTTITLE: W. Prospect Bridge Replacement
PROJECT NUMBER: 25490210E (Bid #7557)
CONTRACTOR: Mountain Constructors, Ina (PO #9135934)
CHANGE ORDER NUMBER: 3
In preparing change orders show in order as separate numbered paragraphs the following:
1. Reason for change. 2. Description of change.
3. Change In contract cost. 4. Change in contract time.
182. See attached sheet for detail.
3. The contract cost will increase by
4. There will be no change in contract time.
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % THIS CHANGE ORDER
TOTAL C.O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
ACCEPTED BY:
REVIEWED BY:
SUBMITTED BY:
APPROVED BY:
APPROVED BY:
W. contractor
Purchasing
Proled Fie
$ 15,561.70
(Purchasing Agent over $60,000)
1.95%
2.68%
DATE:
5798,879.75
$7,478.85
$0.00
$15,561.70
$821,920.30
Zl m -/V
mm
Prospect How Mercer Bridge
Item # Item Quantity un*4 5/Unit Total
1
ISidawalk Special
69.151
SY
$ 198.00
$ 13,691.70
2
lEmergency Tree Removal
11
EA
$ 1,870.00
$ 1.870.00
TOTAL
Posted to PayApp #5
$16,661.70
C7
March 25, 2014
Mark Laken
Engineering Department
City of Fort Collins
281 North College Avenue
Fort Collins, Colorado 60522-0560
RE: West Prospect Road Bridge Replacement
Dear Mark,
On Friday, March 14, 2014, it became apparent to all parties that the pine tree located at
the southwest comer of the structure was danger to all parties working in the ditch. We
came to a quick conclusion that the tree must be removed and due to its size it was
beyond our capabilities. We contracted Foothills Tree Experts to cut the tree down and
we would remove it from the jobsite. The stump was left in place since we could not
safely remove it. The price to have this tree cut down and removed at described is
$1,870.00. If the City decides to grind the stump down we will need to revisit the cost of
that work.
Pease review this information and if you have any questions or need additional
Information Please call me at 303-910-4102.
Thank
Pah�ela Duncdff REVIEWED,COWET AKEN NTSASMMD 0REJECTEDREVISSENO EXCEPTIONS
MIDRESlJ9Mt
Vice President VIEW IS ONLY FOR GENERAL CONFORMANCE WITH THE DESIGN
C OF TIE PROJECTAND GENERAL COJpLWRCE WITH THE
INFORMATION GIVEN IN TN E CONTRACT DOCUMENTS. ANYACTION
SHOWN is SUBJECT TO,TNE RECUIRELENTS OF THE DRAWINGS
AND SPECIFICATIONS. THE CONTRACTOR IS RESPONSIBLE FOR
OWNSIONS WHICH SHALL W CONFRMED AND CORRELATED AT
'DATE: 1
P.O. BOX 405 • PLATlE'VIL.LE,
J
January 16, 2014
Mark Laken
Engineering Department
City of Fort Collins
281 North College Avenue
Fort Collins, Colorado 80522-0580
RE: West Prospect Road Bridge Replacement
Dear Mark,
Pursuant to your conversations regarding the'Concrete Sidewalk (Special)' and how it
was not in the bid schedule we are providing the following information.
Item Description Qtv Unit Price Extended Amount
Concrete Sidewalk (Special) 69.16 SY $ 198.00/SY $ 13,691.70
Please review this information and if you have any questions or need additional
information please call me at 303-910-4102.
Thank
lumpedaa 6uuaau16u3
MW51H d0 83ON
3M CIWAWIOMJSLLMS 3N10NV'S30Vtll
q=U:F Md HWLV3MYd 3US 103t101ld 3H1
1VMHUNN000NV03WmW 39 TM61CXHM SN01SN31000
1103 31WNUS31i! SI-WIDMt11N00 3H1 'S MVOId103dS OW
MVMO 3Hl 4 9I1`1310w3N 3t1011 mnS SI NmOHS
N0S9NI110VAW'S1N3W 0 Hm N3AIfl N011tlWiWjNi
3H1 H11N13ONVI1dW0O Wd3N30 Otry103f08d 3H1 d01d3ON0O
NOIS30 3H1 Ht1m 3ONVIM DA031t183N30 y0 J A1N0 SI M3U13b
030311M13 0310NSVS1NMWW'03M31A3N❑
vraflS3llawWAU[] N3WiSN011d30X30WbFr
P.O. BOX 405 • PLATTEVILLE, COLORADO 80651-0405 • (070) 786.6161