Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 7560 PAINTING SERVICES ANNUAL4 PAINTING j1DR-YWAIL1Lk INC. a,a, •mtaatc�.uwtc.uve....coeom r: �a�ownaxa r. �eta+e:aaaa IIIIMM W M W OAtYII�LLCOM ' DATE: 1-22-13 PROPOSAL SUBMITTED TO. James Warren JOB NAME: 281 North College Bathroom Remodel ITEMS INCLUDEDINPROPOSAL: Demo, Drywall and Paint PROJECT ESTIMATOR. Josh Kintzley Lower West Men and Women bathrooms I. Demo existing tile and sheetrock from walls. 2. Provide dump trailer and dispose of all debris. 3. Provide and install Mold Resistant water board 4' from finished floor on all walls. 4. Tape and finish sheetrock level 4 smooth. 5. Repair damage on existing walls. 6. Prime entire room prior to finish paint. 7. Paint entire bathroom 2 coats Sherwin Williams 200 OVOC. Total labor and material 54,976.00 q 3� r r•• E JF^ DRYWALL „INC. a1 a1 luwru• n.IHuf c. wo.rc co smas PIB'lOI�� rME JOFbB� DATE. 1-22-13 PROPOSAL SUBMITTED TO: lames Warren JOB NAME. 281 North College Bathroom Remodel ITEMS INCLUDED IN PROPOSAL: Demo, Drywall and Paint PROJECT ESTIMATOR: Bosh Kintzley Lower West Men and Women bathrooms 1. Demo existing tile and shcetrock from walls. . 2. Provide dump trailer and dispose of al l debris. 3. Provide and instal I Mold Resistant water board 4' from finished floor on all wal Is. 4. Tape and finish sheetrock level 4 smooth. 5. Repair damage on existing walls. 6. Prime entire room prior to finish paint. 7. Paint entire bathroom 2 coats Sherwin Williams 200 OVOC. Total labor and material $4,976.00 DATE. 1-22-13 PROPOSAL SUBMITTED TO: James Warren JOB NAME: 281'North Col lege Bathroom Remodel ITEMS INCLUDED IN PROPOSAL: Demo, Drywall and Paint PROJECT ESTIMATOR: Josh Kintzley Upper West Men & Women Bathrooms I. Demo existing tile and sheetrock from walls. 2. Provide dump trailer and dispose of all debris. 3. Provide and install Mold Resistant water board 4' from finished Floor on all walls. 4. ITape and finish sheetrock level 4 smooth. 5. Repair damage on existing walls. 6. Prime entire room prior to finish paint. 7. Paint entire bathroom 2 coats Sherwin Williams100 OVOC. Total labor and material S4,976.00 4 PAINTING Fe► DRYWALL 3111 o.�m�.er.uw.n. uewR.rosms r: iamwe�mssru'iu�am ww�+wrmxee�...ua.m. DATE: 1-22-13 PROPOSAL SUBMITTED TO: James Warren JOB NAME, 281 North College Bathroom Remodel ITEMSINCLUDED INPROPOSAL: Demo, Drywall and Paint PROJECT ESTIMATOR: JoshKintzley Lowe Level Unisex Bathroom 1. Demo existing tile and sheetrock from walls. 2. Provide dump trailer and dispose of all debris. 3. Provide and install Mold Resistant water board 4' from finished floor on all walls. 4. Tape and finish sheetrock level 4 smooth. 5. Repair damage on existing walls. 6. Prime entire room prior to finish paint. 7. Paint entire bathroom 2 coats Sherwin Williams 200 OVOC. Total labor and material $2,488.00