HomeMy WebLinkAboutCORRESPONDENCE - RFP - 7560 PAINTING SERVICES ANNUAL4 PAINTING
j1DR-YWAIL1Lk
INC.
a,a, •mtaatc�.uwtc.uve....coeom
r: �a�ownaxa r. �eta+e:aaaa
IIIIMM W M W OAtYII�LLCOM '
DATE: 1-22-13
PROPOSAL SUBMITTED TO. James Warren
JOB NAME: 281 North College Bathroom Remodel
ITEMS INCLUDEDINPROPOSAL: Demo, Drywall and Paint
PROJECT ESTIMATOR. Josh Kintzley
Lower West Men and Women bathrooms
I. Demo existing tile and sheetrock from walls.
2. Provide dump trailer and dispose of all debris.
3. Provide and install Mold Resistant water board 4' from finished floor on all walls.
4. Tape and finish sheetrock level 4 smooth.
5. Repair damage on existing walls.
6. Prime entire room prior to finish paint.
7. Paint entire bathroom 2 coats Sherwin Williams 200 OVOC.
Total labor and material 54,976.00
q 3� r r•• E
JF^ DRYWALL
„INC.
a1 a1 luwru• n.IHuf c. wo.rc co smas
PIB'lOI�� rME JOFbB�
DATE. 1-22-13
PROPOSAL SUBMITTED TO: lames Warren
JOB NAME. 281 North College Bathroom Remodel
ITEMS INCLUDED IN PROPOSAL: Demo, Drywall and Paint
PROJECT ESTIMATOR: Bosh Kintzley
Lower West Men and Women bathrooms
1. Demo existing tile and shcetrock from walls. .
2. Provide dump trailer and dispose of al l debris.
3. Provide and instal I Mold Resistant water board 4' from finished floor on all wal Is.
4. Tape and finish sheetrock level 4 smooth.
5. Repair damage on existing walls.
6. Prime entire room prior to finish paint.
7. Paint entire bathroom 2 coats Sherwin Williams 200 OVOC.
Total labor and material $4,976.00
DATE. 1-22-13
PROPOSAL SUBMITTED TO: James Warren
JOB NAME: 281'North Col lege Bathroom Remodel
ITEMS INCLUDED IN PROPOSAL: Demo, Drywall and Paint
PROJECT ESTIMATOR: Josh Kintzley
Upper West Men & Women Bathrooms
I. Demo existing tile and sheetrock from walls.
2. Provide dump trailer and dispose of all debris.
3. Provide and install Mold Resistant water board 4' from finished Floor on all walls.
4. ITape and finish sheetrock level 4 smooth.
5. Repair damage on existing walls.
6. Prime entire room prior to finish paint.
7. Paint entire bathroom 2 coats Sherwin Williams100 OVOC.
Total labor and material S4,976.00
4 PAINTING
Fe► DRYWALL
3111 o.�m�.er.uw.n. uewR.rosms
r: iamwe�mssru'iu�am
ww�+wrmxee�...ua.m.
DATE: 1-22-13
PROPOSAL SUBMITTED TO: James Warren
JOB NAME, 281 North College Bathroom Remodel
ITEMSINCLUDED INPROPOSAL: Demo, Drywall and Paint
PROJECT ESTIMATOR: JoshKintzley
Lowe Level Unisex Bathroom
1. Demo existing tile and sheetrock from walls.
2. Provide dump trailer and dispose of all debris.
3. Provide and install Mold Resistant water board 4' from finished floor on all walls.
4. Tape and finish sheetrock level 4 smooth.
5. Repair damage on existing walls.
6. Prime entire room prior to finish paint.
7. Paint entire bathroom 2 coats Sherwin Williams 200 OVOC.
Total labor and material $2,488.00