Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7568 BRYAN AVE BRIDGE REPLACEMENTCity of F6rt Collins Engineering Planning, Development 84 Transportation Engtnaortng 281 Nona UgegeAwn= P.O. Bm 580 Pot Colsho, CO $0622.0590 970.221.9606 9M21.6378 -W Change Order. Form PROJECTTITLE: Bryan Bridge Replacement PROJECT NUMBER: 400902101 (RFP #7429) CONTRACTOR: KDG Engineering, LLC q I) (OL(i CHANGE OROER NUMBER: 2 1 in preparing orange o .arse ow inor er as separate numbered paragraphs the following: 1. Reason for change, 2. Description of change. 3. Change in contract coat 4. Change in contractfims. 1&2. See attachedsheet for detail. 3. The contract cost vAll Increase by $ 17,300.00 4. There will be no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL. PENDING CHANGE ORDERS TOTALTHIS CHANGE ORDER TOTAL % THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED BY: REVIEWED BY: ACCEPTED BY: 16.68% 29.35% $103,700.58 $13.140.00 $0.00 $17,300.00 $134,140.68 4/Z/iar4 ACCEPTED BY: DATE: (Department Head) . APPROVED BY:. DATE: (Purchasing Agent over $60,000) 00: Cenuucw Pwchawng Prgj dRe ® KDG Engineering LLC 310&W ,. W.w 410 tn.w.r.col= EArnetl ml rLagWi4tAluds6t4 EXHIBITA- FEE SCHEDULE -CHANGE ORDER R ENGINEERS W1 MATE OF FEE: FOR PROJECT CHANGES-CONSTRUCRON SERVICES BRYAN AVERUGSRIDOE 2HR014 LIBOR XOURS BaoPallam ROG Eduln"dag ClwlonBA.a . Roth Enor. TOLRra. I.A. Br9arun To"' S7.Bddat :ridge Fa 011 CADTach sr' En Inmr CAOTICA PIAGIVII Pro]. Clvll Fn r Ullu Rda: $120.00 $IOBAO SSW S10000 Saw s110.00 3100.00 t ADDITIORAL3ERVICES• >` ^ e28.0 ' 30A 'i • t20.0 lzo '• 0.0 ^e 24D :: 32D '. -Alto S170oDA0 ` -som SA AO LA collwwm sanlwRFtr. seep OrnfnyATadNdAuhMw.BAS Conrirvdad DwMnya. 20.0 020 20.0 120 24.0 32.0 N0.0 S13.940.00 313,910.00 f.2CmaAau to praaularddanS ahwoslWwdrwd" 8.0 24.0 3E0 f7 00 ^ • 33,360.00 Total Add.adum Hot to Fuaad 20.0 60.0 2040 1t0 2a.0 I 37.0 17LO S11,300.00 $17,30040 Fa M 57.3E0.00 iS800A0 Si,300.00 sixaml 40=11 swattoll100A0 Tdd Tau PVFirm S1o,2A0.00 N,200.00 3$B4om M KDG Engineering LLC 3500 S. Wadsworth Blvd. Suite 400, Lakewood, CO 80235 Ph,:720.420.9069 Fax:303.957.5477 K12007 March 5, 2014 Mr. Jin Wang City of Fort Collins Engineering 281 North College Avenue Fort Collins, CO 80521 Subject: Proposal for Additional Services Fees — Change Order 2 Bryan Avenue Bridge Replacement Dear Jin: As discussed over the past few months, there have been numerous shop drawing and RFI issues that are in excess of normal reviews. The complexity of the geometry has also Increased issues with the Contractor, requiring more technical assistance. This has Increased the time we are spending on our reviews. Our subconsuitants, Clanton & Associates and Roth Engineering Group, did not expect having to provide as -constructed drawings or a high level of involvement as Is apparent now. The attached Exhibit A has the fee proposal. Please review my fee proposal and scope of services to verify that they are acceptable to you. If you have questions or need additional information, please contact me at 720-420-9069 or e-mail me at skobayash164@msn.com. Sincerely, 1�� Stan Kobayashi, PE Project Manager Attached: Exhibit A. Engineer's Estimate of Fees