Change Order. Form
PROJECTTITLE: Bryan Bridge Replacement
PROJECT NUMBER: 400902101 (RFP #7429)
CONTRACTOR: KDG Engineering, LLC q I) (OL(i
CHANGE OROER NUMBER: 2 1
in preparing orange o .arse ow inor er as separate numbered paragraphs the following:
1. Reason for change, 2. Description of change.
3. Change in contract coat 4. Change in contractfims.
1&2. See attachedsheet for detail.
3. The contract cost vAll Increase by $ 17,300.00
4. There will be no change in contract time.
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL. PENDING CHANGE ORDERS
TOTALTHIS CHANGE ORDER
TOTAL % THIS CHANGE ORDER
TOTAL C.O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
ACCEPTED BY:
REVIEWED BY:
ACCEPTED BY:
16.68%
29.35%
$103,700.58
$13.140.00
$0.00
$17,300.00
$134,140.68
4/Z/iar4
ACCEPTED BY: DATE:
(Department Head) .
APPROVED BY:. DATE:
(Purchasing Agent over $60,000)
00: Cenuucw
Pwchawng
Prgj dRe
® KDG Engineering LLC
310&W ,. W.w 410 tn.w.r.col= EArnetl ml rLagWi4tAluds6t4
EXHIBITA- FEE SCHEDULE -CHANGE ORDER R
ENGINEERS W1 MATE OF FEE: FOR PROJECT CHANGES-CONSTRUCRON SERVICES
BRYAN AVERUGSRIDOE
2HR014
LIBOR XOURS
BaoPallam
ROG Eduln"dag
ClwlonBA.a
.
Roth
Enor.
TOLRra.
I.A.
Br9arun
To"'
S7.Bddat
:ridge
Fa 011
CADTach
sr'
En Inmr
CAOTICA
PIAGIVII
Pro]. Clvll
Fn r
Ullu Rda:
$120.00
$IOBAO
SSW
S10000
Saw
s110.00
3100.00
t ADDITIORAL3ERVICES• >` ^
e28.0 '
30A 'i
• t20.0
lzo
'• 0.0
^e 24D ::
32D '.
-Alto
S170oDA0
` -som
SA AO
LA collwwm sanlwRFtr. seep
OrnfnyATadNdAuhMw.BAS
Conrirvdad DwMnya.
20.0
020
20.0
120
24.0
32.0
N0.0
S13.940.00
313,910.00
f.2CmaAau to praaularddanS
ahwoslWwdrwd"
8.0
24.0
3E0
f7 00
^ •
33,360.00
Total Add.adum Hot to Fuaad
20.0
60.0
2040
1t0
2a.0
I 37.0
17LO
S11,300.00
$17,30040
Fa M
57.3E0.00
iS800A0
Si,300.00
sixaml
40=11
swattoll100A0
Tdd Tau PVFirm
S1o,2A0.00
N,200.00
3$B4om
M KDG Engineering LLC
3500 S. Wadsworth Blvd. Suite 400, Lakewood, CO 80235 Ph,:720.420.9069 Fax:303.957.5477
K12007
March 5, 2014
Mr. Jin Wang
City of Fort Collins Engineering
281 North College Avenue
Fort Collins, CO 80521
Subject: Proposal for Additional Services Fees — Change Order 2
Bryan Avenue Bridge Replacement
Dear Jin:
As discussed over the past few months, there have been numerous shop drawing and RFI issues
that are in excess of normal reviews. The complexity of the geometry has also Increased issues
with the Contractor, requiring more technical assistance. This has Increased the time we are
spending on our reviews.
Our subconsuitants, Clanton & Associates and Roth Engineering Group, did not expect having to
provide as -constructed drawings or a high level of involvement as Is apparent now.
The attached Exhibit A has the fee proposal.
Please review my fee proposal and scope of services to verify that they are acceptable to you. If
you have questions or need additional information, please contact me at 720-420-9069 or e-mail
me at skobayash164@msn.com.
Sincerely,
1��
Stan Kobayashi, PE
Project Manager
Attached: Exhibit A. Engineer's Estimate of Fees