HomeMy WebLinkAboutRFP - 7551 TRANSFORT BRANDING & MARKETING SERVICESBID 7552 Transfort Branding & Marketing Services Page 1 of 3
ADDENDUM No. 1
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of BID 7551: 7551 TRANSFORT BRANDING & MARKETING SERVICES
OPENING DATE: 3:00 PM (Our Clock) September 18, 2013
To all prospective bidders under the specifications and contract documents described
above, the following changes/additions are hereby made and detailed in the following
sections of this addendum:
1. Please note that due date for proposals has been pushed out to accommodate
revisions to be made to proposals in accordance with Exhibit 1. The Opening
Date is now:
3:00 PM (OUR CLOCK) SEPTEMBER 18, 2013
2. Exhibit 1 – Clarification of Review & Assessment Criteria
Please contact Ed Bonnette, CPPB, CPM, Buyer at (970) 416-2247 with any questions
regarding this addendum.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN
STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS
ADDENDUM HAS BEEN RECEIVED.
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
fcgov.com/purchasing
BID 7552 Transfort Branding & Marketing Services Page 2 of 3
EXHIBIT 1 – CLARIFICATION OF REVIEW & ASSESSMENT CRITERIA
3. Section B.8. SCHEDULE OF RATES AND COST BY TASK:
Note that this section is being removed from Submittal Requirements. Once a firm
is selected detailed scope of services will be developed. At this time costs will be
reviewed and negotiated along with the other deliverables as outlined in the RFP.
Firms are not to include any cost information in their submitted Proposal.
4. Section X. REVIEW AND ASSESSMENT:
Note that the Evaluation Grid from the original RFP is being removed and replaced
by the one below. There is no specific UDBE goal for this project. Proposers are to
either indicate if they are a UDBE firm, or if they plan to utilize any UDBE firms as
subcontractors for this project.
Professional firms will be evaluated on the following criteria. These criteria will be
the basis for review of the written proposals and interview session.
The rating scale shall be from 1 to 5, with 1 being a poor rating, 3 being an
average rating, and 5 being an outstanding rating.
WEIGHTING
FACTOR QUALIFICATION STANDARD
2.0 Scope of Proposal
Does the proposal show an understanding of the project
objective, methodology to be used and results that are
desired from the project?
2.0 Assigned
Personnel
Do the persons who will be working on the project have the
necessary skills? Are sufficient people of the requisite skills
assigned to the project?
1.0 Availability
Can the work be completed in the necessary time? Can the
target start and completion dates be met? Are other qualified
personnel available to assist in meeting the project schedule
if required? Is the project team available to attend meetings
as required by the Scope of Work?
1.0 Motivation Is the firm interested and are they capable of doing the work in
the required time frame?
3.0 Firm Capability
Does the firm have the support capabilities the assigned
personnel require? Has the firm done previous projects of this
type and scope?
1.0
UDBE
Is the primary firm a UDBE or has the primary firm submitted
UDBE participation that meets or exceeds UDBE goal for the
project?
BID 7552 Transfort Branding & Marketing Services Page 3 of 3
REFERENCE EVALUATION (TOP RANKED FIRM)
The project Manager will check references using the following criteria. The
evaluation rankings will be labeled Satisfactory/Unsatisfactory.
QUALIFICATION STANDARD
Overall Performance Would you hire this Professional again? Did they show the skills
required by this project?
Timetable
Was the original Scope of Work completed within the specified
time? Were interim deadlines met in a timely manner?
Completeness
Was the Professional responsive to client needs; did the
Professional anticipate problems? Were problems solved quickly
and effectively?
Budget Was the original Scope of Work completed within the project
budget?
Job Knowledge
a) If a study, did it meet the Scope of Work?
b) If Professional administered a construction contract, was the
project functional upon completion and did it operate properly?
Were problems corrected quickly and effectively?