Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7535 GRADE SEPARATED CROSSING AT NRRC (2)City of F&I Collins 'rigineering Planning, Development & Transportation Eo,9inee6n9 281 NOrm Clop AW=0 P.O. bar 580 FOR CO.,, CO 605220580 970,221.6605 970221.6379 - kw Change Order Form PROJECT TITLE: Mason Grade Separation at NRRC PROJECT NUMBER: 400903204 (Bid 07535) CONTRACTOR: Concrete Express, Ina (PO #9135146) CHANGE ORDER NUMBER: 2 n preparing change orders show 1n order as separa enure erea paragraphs the following: 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change In contract time. 1&2. See attached sheet for detail. 3. The contract cost does not change. $0.00 (Adjustment to Force Account) 4. 'Thera w81 tia no change in contract time. ORIGINAL CONTRACT COST $970,634.86 TOTAL APPROVED CHANGE ORDERS $o.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $0.00 TOTAL % THIS CHANGE ORDER 0.00% TOTAL C.O. % ORIGINAL CONTRACT 0.00% ADJUSTED CONTRACT COST $970,634.86 (Assuming all change orders approved) ACCEPTED BY: REVIEWED BY: SUBMITTED BY: APPROVED BY: APPROVED BY: UA I t: (Purchasing Agent over $60,000) cG CORlmcmr P=hating Project He S `to -(" CHANGE ORDER 2.,_x NRRC Overpass „i.SUMMARYsOFnWORK ...-j.„n <•r."�_ ,��u Item# Item Quantity unit $runt Total 1 Install Flashing 1 LS $ 6,440.70 $ 6,440.70 2 Deduct (Credit) for Plan Flashing 1 LS $ 845.67 $ 845.67 3 Wood Nailer Strip for Flashing 1 LS $ 1,908.09 $ 1,908.09 4 Adjustment to Force Account Minor Contract Revisions Line Item 1 LS $ (7,503.12) $ (7,503.12) TOTAL 1,2 1 Orignal roof flashing design did not accommodate for getting drip edge into the rein gutter on the structure. $0.00 Orignal roof flashing desigmdid not accommodate for a wooden nailer edge to attach the flashing to the structure. Adjustment to Force Account Minor Contract Revisions Line Item Posted to Pay App 02