Loading...
HomeMy WebLinkAboutCHANGE ORDER - RFP - 7455 FORT COLLINS SENIOR CENTER EXPANSION (4)FACILITIES REQUISITION FORM VENDOR NeenanArchistruction REQ BY: Brian Hergott CHARGE# 400703000.535010.6 CITY DESCRIPTION DATE Work Order # OP-424311 3/17/14 / Billable. — Yes TOTAL COST: $55,614.15 - BUYER: John Stephen COST Provide labor, materials and equipment for design, construction and installation for the scope of work for change order#4 to modify interior finishes, Complete design of Auditorium, New parking lot to be concrete paving in lieu of asphalt and as per breakout attached. $55,614.15 ADDITIONAL INFO COMPUTER INPUT INFORMATION: VENDOR# REQUISITION # DATE ENTERED: The Neenan Company LLLP 1 ♦ ' 2607 Midpoint Drive, Fart Collins, CO 80525 archistructions Tel: 970 493-8747 Fax: 970 493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761 A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 Status: APP OCI Date: 02/05/2014 Owner CO #: OCO-004 _ Due to Owner: Scope Desc: Source: Final Description Quantity Amount Vendor Name Contingency - TNC-$2,160.00 Senior Interior Designer 24HR @ $90 $2,160.00 Subtotal: $0.00 Total: $0.00 Notes: Approved By: The Neenan Company Date Owner P Date The Neenan Company LLLP ♦ ' 2607 Midpoint Drive, Fort Collins, CO 80525 archistructions Tel: 970 493-8747 Fax:: 970 493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761 A Project Name: Fort Collins Senior Center Project Address: 1200 Rainlree Drive Fort Collins, CO 80526 Status: APP OCI Date: 02/06/2014 Owner CO #: OCO-004 Due to Owner: 03/05/2014 Scope Desc: Source: Final Description Quantity Amount Vendor Name Custom Casework $543.00 Subtotal: $543.00 Final Mark Ups Quantity Amount Vendor Name' Construction Contingency $16.29 Design Fee $38.32 Fee $23.77 Insur, Bond, Warranty $20.69 Mark Ups Total: $99.07 _ Total: $642.07 Notes: Approved By: The Neenan Company Date Owner Dale The Neenan Company LLLP ' ♦ I 2607 Midpoint Drive, Fort Collins, CO 80525 archistruction® Tel: 970493-8747 Fax: 970493-5869 �y p� OWNER CHANGE ITEM DETAIL Project #: 2761A Project Name: Fort Collins Senior Center . Project Address: 1200 Raintree Drive Fort Collins, CO 80526 CI�-0-054 Ash 3 rH9aMwir�eHand driers only. WWq Status: APP OCI Date: 02/07/2014 Owner CO #: OCO-004 Due to Owner: 02/14/2014 Scope Desc: Source: Final Description Quantity Amount Vendor Name Wiring for hand driers $604.00 Mark Ups Subtotal: $604.00 Final Quantity Amount Vendor Name Construction Contingency $18.12 Design Fee $42.61 ' Fee $26.44 Insur, Bond, Warranty $23.02 Mark Ups Total: $110.19 Total: $714.19 Notes: 10-MAR-14 - Paper towel dispenser will be battery operated (meeting 3/7) Approved By: The Neenan Company Date Owner Date The Neenan Company LLLP t ♦ I 2607 Midpoint Drive, Fort Collins, CO 80525 archistructione Tel: 970 493-8747 Fax: 970 493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive FortCollins, CO 80526 ,;OCIX,055 p ` j ,lost la I traik hghtmgiih hall 141 (per TNC sketch 112Z ¢ 7 Status: APP OCI Date: 02/07/2014 Owner CO #: OCO-004 Due to Owner: 02/14/2014 Scope Desc: Source: Final Description Quantity Amount vendor Name Electrical Quote $748.00 Subtotal: $748.00 Final Mark Ups Quantity Amount vendor Name Construction Contingency $22.44 - Design Fee $52.78 Fee $32.74 Insur, Bond, Warranty $28.51 Mark Ups Total: $136.47 Total: $884.47 Notes: Approved By: The Neenan Company Owner Date Date The Neenan Company LLLP ' ♦ 1 2607 Midpoint Drive, Fort Collins, CO 80525 archistruction® Tel: 970493-8747 Fax: p970493-5869 �a OWNER CHANGE ITEM DETAIL Project #: 2761 A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 Status: APP OCI Date: 02/07/2014 Owner CO #: OCO-004 Due to Owner: 02/19/2014 Scope Desc: Source: Final Description Quantity Amount Vendor Name Electrical Quote -$3,571.00 Subtotal: -$3,571.00 Final Mark Ups Quantity Amount Vendor Name Construction Contingency -$107.13 Fee -$156.32 Insur, Bond, Warranty -$136.09 Mark Ups Total: -$399.54 Total: -$3,970.54 Notes: Approved By: The Noonan Company Date Owner Date The Neenan Company LLLP 1 1 I 2607 Midpoint Drive, Fort Collins, CO 80525 archistruction® Tel: 970 493-8747 Fax: 970 493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 �:OCI-0,58 ~Add 2 A} 1646466e6to canopy columns (4aotal) Status: APP OCI Date: 02/07/2014 Owner CO #: OCO-004 Due to Owner: 02/19/2014 Scope Desc: Source: Final Description Quantity Amount Vendor Name Electrical Quote $517.00 Subtotal: $517.00 Final Mark Ups Quantity Amount Vendor Name Construction Contingency $15.51 Design Fee $36.47 Fee $22.63 Insur, Bond, Warranty $19.70 Mark Ups Total: $94.31 Total: $611.31 Notes: Approved By: The Neenan Company Date Owner Date The Neenan Company LLLP ' 1 ' 2607 Midpoint Drive, Fort Collins, CO 80525 archistructione Tel: 970493-8747 Fax: 970493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 4Crl-059 Increase Weather Condltlons /111dwance Status: APP OCI Date: 02/14/2014 Owner CO #: OCO-004 Due to Owner: Scope Desc: Increase Weather conditions allowance for costs invoiced through 211/14 Source: Final Description Quantity Amount Vendor Name Weather Conditions $22,459.28 Subtotal: $22,459.28 Final Mark Ups Quantity Amount Vendor Name Fee $983.16 Insur, Bond, Warranty $855.92 Mark Ups Total: $1,839.08 Total: $24,298.36 Notes: Approved By: The Neenan Company Date Owner Date The Neenan Company LLLP ' 1 I 2607 Midpoint Drive, Fort Collins, CO 80525 archistructionc Tel: 970493-8747 Fax: 970493-5869 �p OWNER CHANGE ITEM DETAIL Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 -OCI-061 W - rAdd (3) coiling "fan outlets and (fl wall switch to Cardio ceiling Fans by owner Status: APP OCI Date: 02/14/2014 Owner CO #: OCO-004 Due to Owner: 02/28/2014 Scope Desc: Source: Final Description Quantity Amount Vendor Name 3 ceiling fans and i wall switch at Cardio $619.00 Subtotal: $619.00 Final Mark Ups Quantity Amount Vendor Name Construction Contingency $18.57 Design Fee $43.67 Fee $27.10 Insur, Bond, Warranty $23.59 Mark Ups Total: $112.93 Total: $731.93 Notes: Approved By: The Neenan Company Date Owner Date The Neenan Company LLLP 2607 Midpoint Drive, Fort Fort Collins, CO 80525 archistruction® Tel: 970 493-8747 Fax: 970 493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 'OCI-062 aAdd switch for patio�fiztures on $side of Multipurpose ,;...,, _--. , . .. Status: APP OCI Date: 02/25/2014 Owner CO #: OCO-004 Due to Owner: 02/19/2014 Scope Desc: Source: Final Description Quantity Amount Vendor Name Electrical Quote $483.00 Subtotal: $483.00 Final Mark Ups Quantity Amount Vendor Name Construction Contingency $14.49 Design Fee $34.08 Fee $21.15 Insur, Bond, Warranty $18.41 Mark Ups Total: $88.13 Notes: Approved By: The Neenan Company Owner Date Date Total: $571.13 The Neenan Company LLLP kagai 2607 Midpoint Drive, Fort Collins, CO 80525 archistructions Tel: 970 493-8747 Fax: 970 493-5869 OWNER GRANGE ITEM DETAIL Project* 2761 A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 Status: APP OCI Date: 02/26/2014 Owner CO #: OCO-004 Due to Owner: Scope Desc: Source: Final Description quantity Amount Vendor Name Change Asphalt paving to concrete in P18P2 Parking $0.00 areas Subtotal: $0.00 Final Mark Ups Quantity Amount Vendor Name Construction Contingency $0.00 Design Fee $0.00 Fee $0.00 Insur, Bond, Warranty $0.00 Mark Ups Total: $0.00 Total: $0.00 Notes: Approved By: The Noonan Company Date 0 Owner Date CHANGE ORDER NO. 04 PROJECT TITLE: Fort Collins Senior. Center Expansion CONTRACTOR: The Neenan Company PROJECT NUMBER: 7440 I � 3 )- DESCRIPTION: Various Scope Changes Fort Collins In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change: Add additional scope items to the original contract 2. Description of change:Add security items, change interior finishes, add electrical scope, compete the design for the auditorium, switch new parking lot paving to concrete in lieu of asphalt. 3. Change in contract cost: $55,614.15 Fitty Five I housandix Hundred Fourteen an oars 4. Change in contract time: There is no change in completion date, remains June 13, 2014. (Attach additional sheets as required) ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER 1.27% Total C.O. % of Original Contract 29.02% ADJUSTED CONTRACT COST ACCEPTED BY: W P ACCEPTED BY: REVIEWED BY: APPROVED BY: APPROVED BY: Print Name is Brian Bob Adams - Recreation Director Ken Mannon - Operations Director Gerry Paul - Purchasing Director If over $60,000 - Purchasing Director cc: City Clerk Project File Contractor Purchasing Engineer $4,383,702.00 $1,216, 394.86 $0.00 $55,614.15 $5,655,711.01 3--i3-)y Date _13_,y Date 3,l.3-�� Date Date Date The Neenan Company LLLP ' ♦ I '2607 Midpoint Drive, Fort Collins, CO 80525 archistructions Tel: 970 493-8747 Fax: 970 493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761 A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 'OC164 ,� rd nd flxturesiomassaga'rooms-�.-, ,Sinks Status: APP OCI Dale: 03/04/2014 Owner CO #: OCO-004 Due to Owner: Scope Desc: - Source: Final Description quantity Amount Vendor Name Massage Sinks/Fixtures 3 @ $530.28 $1,590.84 Lind's Plumbing 8 Heating, Inc Subtotal: $1,590.84 Final Mark Ups Quantity Amount vendor Name Construction Contingency $47.73 Design Fee $112.24 Fee $69.64 Insur, Bond, Warranty $60.63 Mark Ups Total: $290.24 Total: $1,881.08 Notes: Approved By: The Neenan Company Date Owner Date The Neenan Company LLLP ' ♦ I 2607 Midpoint Drive, Fort Collins, CO 80525 archistruction® Tel: 970 493-8747 Fax: 970 493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 Status: APP OCI Date: 03/04/2014 Owner CO #: OCO-004 Due to Owner: Scope Desc: Source: Final Description Quantity Amount Vendor Name Operable Panel Partition 120 @ $5 $600.00 American Seating Company Subtotal: $600.00 Final Mark Ups Quantity Amount Vendor Name Construction Contingency $18.00 Design Fee $42.33 Fee $26.27 Insur, Bond, Warranty $22.87 Mark Ups Total: $109.47 Total: $709.47 Notes: Approved By: The Neenan Company Date Owner Date The Neenan Company LLLP ' ♦ ' 2607 Midpoint Drive, Fort Collins, CO 80525 archistructione Tel: 970 493-8747 Fax: 970 493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761 A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 Status: APP OCI Date: 03/10/2014 Owner CO #: OCO-004 Due to Owner: Scope Desc: Source: Final Description quantity Amount Vendor Name Acoustical Consultant $480.00 Electrical Design (Adam B(3) - $2,067.50 HVAC Design (Aaron IM) 21 @ $115 $2,415.00 Job Captain - Kevin D 1.5HR @ $80 $120.00 Job Captain - Shelby H 51 HR @ $80 $4,080.00 Senior Architect - Bob H 2HR @ $125 $250.00 Senior Interior Designer - Maggie T 62.5HR @ $90 $5,625.00 Subtotal: $15,037.50 Total: $15,037.50 Notes: Approved By: The Neenan Company Date Owner Date The Neenan Company LLLP 2607 Midpoint Drive, Fort Collins, CO 80525 archistruction® Tel: 970 493-8747 Fax: 970 493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 -.00I-067 ^�.1Deduit Carpet In Flallway 14[ and vestrbdles 150 8140 '-� T.i Status: APP OCI Date: 03/10/2014 Owner CO #: OCO-004 Due to Owner: Scope Desc: Source: Final Description Quantity Amount Vendor Name Flooring Deduct -$4,614.20 Subtotal: $4,614.20 Final Mark Ups Quantity . Amount Vendor Name Construction Contingency -$138.43 Fee -$201.98 Insur, Bond, Warranty -$175.85 Mark Ups Total: -$516.26 Total: $5,130.46 Notes: Approved By: The Neenan Company Owner Date Date CHANGE ORDER NO. 04 PROJECT TITLE: Fort Collins Senior Center Expansion CONTRACTOR: The Neenan Company PROJECT NUMBER: 7440 DESCRIPTION: Various Scope Changes Fort Collins In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change: Add additional scope items to the original contract 2. Description of change:Add security items, change interior finishes, add electrical scope, compete the design for the auditorium, switch new parking lot paving to concrete in lieu of asphalt. 3. Change in contract cost: $55,614.15 Fiftyive Thousand Six Hundred Fourteen an oars 4. Change in contract time: There is no change in completion date, remains June 13, 2014. (Attach additional sheets as required) ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER Total C.O. % of Original Contract ADJUSTED CONTRACT COST 1.27% 29.02% $4,383,702.00 $1,216, 394.86 $0.00 $55,614.15 $5,655,711.01 ACCEPTED BY: W P (Y v 3 — / Contrac s Representati a Randolph P. Myers Date ACCEPTED BY: Project Manager Brian H gott - Operations Services Date REVIEWED BY: k l�' ////)" f 3 / 3— Print Name Bob Adams - Recreation Director Date APPROVED BY: /. Print t9me Ken Mannon - Operations Director Date APPROVED BY: Print Name Gerry Paul - Purchasing Director Date If over $60,000 - Purchasing Director cc: City Clerk Project File Contractor Purchasing Engineer S) archistructions The Neenan Company LLLP 2607 Midpoint Drive, Fort Collins, CO 80525 Tel: 970 493-8747 Fax: 970 493-5869 Project #: 2761 A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 Owner: City Of Fort Collins Address: P.O. Box 580 Fort Collins CO 80522 Attn: Brian Hergott Tel: (970) 221-6804 Fax: OWNER CHANGE ORDER Change Order #: OCO-004 Contract: 2761 A Change Order Date: 03/11/2014 Title: Misc Adds and Deducts NEENAN and Owner previously entered into an Agreement for the above referenced project. NEENAN and Owner desire to issue a change order for the Agreement as described below. As modified hereby, the Agreement remains in full force and effect and NEENAN and Owner ratify and affirm the Agreement in all respects. Change Item Change Item Description Amount OCI-011 Security Camera Rough in, based on revised layout 01-22 $7,918.79 OCI-012 Power to relocated garden sheds $2,239.54 OCI-013 Add Donor pavers at Multipurpose front entry $4,800.71 OCI-028 Rough in power to flag pole for future light & install solar powered light. $1,011.00 OCI-034 Increase reception desk allowance $2,663.60 OCI-052 Reselect Carpet, revised finished, re -issue drawings, paid with contingency $0.00 OCI-053 Ballot Box - Base cabinet with door and ballot slot with Plam top (does not include steel box) $642.07 OCI-054 Hardwire Hand driers only. $714.19 OCI-055 Install track lighting in hall 141 (per TNC sketch 1/22) $884.47 OCI-056 Deduct for EMT conduit in walls, changed to MC -$3,970.54 OCI-058 Add 2 additional outlets to canopy columns (4 total) $611.31 OCI-059 Increase Weather Conditions Allowance $24,298.36 OCI-061 Add (3) ceiling fan outlets and (1) wall switch to Cardio ceiling. Fans by owner $731.93 OCI-062 Add switch for patio fixtures on S side of Multipurpose $571.13 OCI-063 Change Asphalt Paving to 6" unreinforced concrete in new parking area $0.00 OCI-064 Sinks and fixtures in massage rooms $1,881.08 OCI-065 Add donor plaques to Auditorium seats $709.47 OCI-066 Theater CO Design Services (1120-3/2) $15,037.50 OCI-067 Deduct Carpet in Hallway 141 and vestibules 150 &140 -$5,130.46 Total: $55,614.15 9= • I The Neenan Company LLLP 2607 Midpoint Drive, Fort Collins, CO 80525 archistructione Tel: 970 493-8747 Fax: 970 493-5869 OWNER CHANGE ORDER Project #: 2761A Change Order #: OCO-004 Project Name: Fort Collins Senior Center Contract: 2761A Project Address: 1200 Raintree Drive Change Order Date: 03/11/2014 Fort Collins, CO 80526 The Original Contract Price was.............................................................................................................. $4,383,702.00 Net Change by Previously Authorized Requests and Changes..................................................................... $1,216,394.86 The Contract Price Prior to This Change Order was.................................................................................. $5,600,096.86 The Contract Price will be Increased By................................................................................................ $55,614.15 The New Contract Price Including This Change Order will be....................................................................... $5,655,711.01 The Contract Time Will Not Be Changed............................................................................................ The Scheduled Substantial Completion Date as of this Change Order therefore is ........................................... ACCEPTED: The Neenan Company LLLP By: Its: Signed: By: Its: Date: Neenan Management Company General Partner Randolph P. Myers President & CEO City Of Fort Collins By: Date: The Neenan Company LLLP 1 ' 2607 Midpoint Drive, Fort Collins, CO 80525 archistruction® Tel: 970493-8747 Fax: 970493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761 A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 Security Camera Rough In based�on revised jayout 61.22 Status: APP OCI Date: 09/23/2013 Owner CO #: OCO-004 Due to Owner: 11/01/2013 Scope Desc: Source: Final Description Quantity Amount Vendor Name Security camera rough in $6,697.00 Subtotal: $6,697.00 Final Mark Ups Quantity Amount Vendor Name Construction Contingency $200.91 Design Fee $472.50 Fee $293.16 Insur, Bond, Warranty $255.22 Mark Ups Total: $1,221.79 Total: $7,918.79 Notes: Approved By: The Neenan Company Date Owner Date The Neenan Company LLLP ' 1 I 2607 Midpoint Drive, Fort Collins, CO 80525 archistructione Tel: 970 493-8747 Fax: 970 493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 ,`�-pPowe to relocated 'garden sf�eds. ,•a.... r s r �° t�i ai`v fi Status: APP OCI Date: 09/23/2013 Owner CO #: OCO-004 Due to Owner: 12/01/2013 Scope Desc: Source: Final Description Quantity Amount Vendor Name Electrical $1,894.00 Subtotal: $1,894.00 Final Mark Ups Quantity Amount Vendor Name Construction Contingency $56.82 Design Fee $133.63 Fee $82.91 Insur, Bond, Warranty - $72.18 Mark Ups Total: $345.54 Total: $2,239.54 Notes: Approved By: The Neenan Company Date Owner Date The Neenan Company LLLP ' 1 I 2607 Midpoint Drive, Fort Collins, CO 80525 archistructione Tel: 970493-8747 Fax: 970493-5869 OWNER CHANCE ITEM DETAIL Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 ays a f,,•. ti W x ..a",• t _FOCI-013 Donor pavers a4Multipurpose front entry`-`} 3 Status: APP OCI Date: 11/01/2013 Owner CO #: OCO-004 Due to Owner: 03/01/2013 Scope Desc: Source: Final Description Quantity Amount Vendor Name Permiter curb 160 @ $6 $960.00 i-- Planting Accessories 300 @ $6 $1,800.00 Site Cut/Fill 1 @ S400 $400.00 Underdrain 300 @ $3 $900.00 Subtotal: $4,060.00 Final Mark Ups Quantity Amount Vendor Name Construction Contingency $121.80 Design Fee $286.45 Fee $177.73 Insur, Bond, Warranty $154.73 Mark Ups Total: $740.71 Total: $4,800.71 Notes: Approved By: The Neenan Company Date Owner Date gaug archistructions The Neenan Company LLLP 2607 Midpoint Drive, Fort Collins, CO 80525 Tel: 970 493-8747 Fax: 970 493-5869 Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 Owner: City Of Fort Collins Address: P.O. Box 580 Fort Collins CO 80522 Attn: Brian Hergott Tel: (970)221-6804 Fax: OWNER CHANGE ORDER Change Order #: OCO-004 Contract: 2761A Change Order Date: 03/11/2014 Title: Misc Adds and Deducts NEENAN and Owner previously entered into an Agreement for the above referenced project. NEENAN and Owner desire to issue a change order for the Agreement as described below. As modified hereby, the Agreement remains in full force and effect and NEENAN and Owner ratify and affirm the Agreement in all respects. Change Item Change Item Description - Amount OCI-011 Security Camera Rough in, based on revised layout 01-22 $7,918.79 OCI-012 Power to relocated garden sheds $2,239.54 OCI-013 Add Donor pavers at Multipurpose front entry $4,800.71 OCI-028 Rough in power to flag pole for future light & install solar powered light. $1,011.00 OCI-034 Increase reception desk allowance $2,663.60 OCI-052 Reselect Carpet, revised finished, re -issue drawings, paid with contingency $0.00 OCI-053 Ballot Box - Base cabinet with door and ballot slot with Plain top (does not include steel box) $642.07 OCI-054 Hardwire Hand driers only. $714.19 OCI-055 Install track lighting in hall 141 (per TNC sketch 1/22) $884.47 OCI-056 Deduct for EMT conduit in walls, changed to MC -$3,970.54 OCI-058 Add 2 additional outlets to canopy columns (4 total) $611.31 OCI-059 Increase Weather Conditions Allowance $24,298.36 OCI-061 Add (3) ceiling fan outlets and (1) wall switch to Cardio ceiling. Fans by owner $731.93 OCI-062 Add switch for patio fixtures on S side of Multipurpose $571.13 OCI-063 Change Asphalt Paving to 6" unreinforced concrete in new parking area $0.00 OCI-064 Sinks and fixtures in massage rooms $1,881.08 OCI-065 Add donor plaques to Auditorium seats $709.47 OCI-066 Theater CD Design Services (1/20-3/2) $15,037.50 OCI-067 Deduct Carpet in Hallway 141 and vestibules 150 &140 -$5,130.46 Total: $55,614.15 The Neenan Company LLLP ♦ ' 2607 Midpoint Drive, Fort Collins, CO 80525 archistructiona Tel: 970 493-8747 Fax: 970 493-5869 �p OWNER CHANGE ITEM DETAIL Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 r.00I-028 Rough In power to flag pole'for future light 8 Install solar powered Iigtit: • - + Status: APP OCI Date: 10/24/2013 Owner CO M OCO-004 Due to Owner: 12/31/2013 Scope Desc: Source: Final Description Quantity Amount Vendor Name Solar Flag Pole Light $855.00 Subtotal: $855.00 Final Mark Ups Quantity Amount Vendor Name Construction Contingency $25.65 Design Fee $60.33 Fee $37.43 Insur, Bond, Warranty $32.59 ' Mark Ups Total: $156.00 Total: $1,011.00 Notes: Approved By: The Noonan Company Date Owner Date The Neenan Company LLLP ' ♦ ' 2607 Midpoint Drive, Fort Collins, CO 80525. archistructions Tel: 970 493-8747 Fax: 970 493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 ,;`FOCI-034 - � ncrease'receptiiR� sk allowance Status: APP OCI Date: 11/27/2013 Owner CO #: OCO-004 Due to Owner: Scope Desc: Source: Final Description Quantity Amount Vendor Name Custom Casework $2,462.00 Subtotal: $2,462.00 Final Mark Ups Quantity Amount Vendor Name Fee $107.78 Insur, Bond, Warranty $93.82 Mark Ups Total: $201.60 Total: $2,663.60 Notes: 27-NOV-13 - Final cost savings from partition tbd. TNC will transfer savings to reception desk allowance. Remainder to be OCO to increase allowance to 20K. Approved By. - The Neenan Company Owner Date Date The Neenan Company LLLP 1 ♦ I 2607 Midpoint Drive, Fort Collins, CO 80525 archistruction® Tel: 970 493-8747 Fax: 970 493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761 A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 '.�2'e''"Ls .i`3�` xu.43'%Ya'm'Lz` c - . �e.t 9 J.[ V -.se` i`�`e 4;4d > ; 4 11-052 Reselecf Car�p�e#revised finished �re Issue drawings paid with contngency Status: APP OCI Date: 02/05/2014 Owner CO #: OCO-004 Due to Owner: Scope Desc: Source: Final Description Quantity Amount Vendor Name Contingency -TNC -$2,160.00 Senior Interior Designer 24HR @ $90 $2,160.00 Subtotal: $0.00 Total: $0.00 Notes: Approved By: The Neenan Company Date Owner Dale The Neenan Company LLLP 1 ♦ ' 2607 Midpoint Drive, Fort Collins, CO 80525 archistruction® Tel: 970 493-8747 Fax: 970 493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761 A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 r' b .oCl-0N53 Ballot Box Base cabinet with door and ball'ofslot with Plam top (doesnot Include steel boi) ` Status: APP OCI Date: 02/06/2014 Owner CO #: OCO-004 Due to Owner: 03/05/2014 Scope Desc: Source: Final Description Quantity Amount Vendor Name Custom Casework $543.00 Subtotal: $543.00 Final Mark Ups Quantity Amount Vendor Name Construction Contingency $16.29 Design Fee $38.32 Fee $23.77 Insur, Bond, Warranty $20.69 Mark Ups Total: $99.07 Notes: Approved By: The Neenan Company Owner Date Date Total: $642.07 The Neenan Company LLLP t ♦ ' 2607 Midpoint Drive, Fort Collins, CO 80525 archistruction® Tel: 970 493-8747 Fax: 970 493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 OCI-054 Hardwire Hand dners'only. Status: APP OCI Date: 02/07/2014 Owner CO #: OCO-004 Due to Owner: 02/14/2014 Scope Desc: Source: Final Description Quantity Amount Vendor Name Wiring for hand driers $604.00 Subtotal: $604.00 Final Mark Ups Quantity Amount Vendor Name Construction Contingency $18.12 Design Fee $42.61 Fee $26A4 Insur, Bond, Warranty $23.02 Mark Ups Total: $110.19 Total: $714.19 Notes: 10-MAR-14 - Paper towel dispenser will be battery operated (meeting 317) Approved By: The Neenan Company Date Owner Date The Neenan Company LLLP 1 ♦ I 2607 Midpoint Drive, Fort Collins, CO 80525 archistructions Tel: 970 493-8747 Fax: 970 493-5869 �a OWNER CHANGE ITEMDETAIL Project #: 2761 A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 55 ' Install back ttghting'in ball 141 (per TNC sketch"V22) Status: APP OCI Date: 02/07/2014 Owner CO #: OCO-004 Due to Owner: 02/14/2014 Scope Desc: Source: Final Description Quantity Amount Vendor Name Electrical Quote $748.00 Subtotal: $748.00 Final Mark Ups Quantity Amount Vendor Name Construction Contingency $22.44 Design Fee $52.78 Fee $32.74 Insur, Bond, Warranty $28.51 Mark Ups Total: $136.47 Total: $884.47 Notes: Approved By: The Neenan Company Date Owner Date The Neenan Company LLLP 1 ♦ I 2607 Midpoint Drive, Fort ollins, CO 80525 archistruction® Tel: 970 493-8747 Fax: 970 493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 60526 !OCI-0-056 Deduct for EMT cbndud in walls -changed to MC - z Status: APP OCI Date: 02/0712014 Owner CO #: OCO-004 Due to Owner: 02/19/2014 Scope Desc: Source: Final Description Quantity Amount Vendor Name Electrical Quote -$3,571.00 Subtotal: -$3,571.00 Final Mark Ups Quantity Amount Vendor Name Construction Contingency -$107.13 Fee -$156.32 Insur, Bond, Warranty -$136.09 Mark Ups Total: -$399.54 Total: -$3,970.54 Notes: Approved By: The Neenan Company Date Owner Date The Neenan Company LLLP t ♦ I 2607 Midpoint Drive, Fort Collins, CO 80525 archistruction® Tel: 970 493-8747 Fax: 970 493-5869 OWNER CHANCE ITEM DETAIL Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 Add 2�z'ddltlonal outlets to canopy m coluns:(4;total) Status: APP OCI Date: 02/07/2014 Owner CO M OCO-004 Due to Owner: 02/19/2014 Scope Desc: Source: Final Description Quantity Amount Vendor Name Electrical Quote $517.00 Subtotal: $517.00 Final Mark Ups Quantity Amount vendor Name Construction Contingency $15.51 Design Fee $36.47 Fee $22.63 Insur, Bond, Warranty $19.70 Mark Ups Total: $94.31 Total: $611.31 Notes: Approved By: The Neenan Company Date ' Owner Date The Neenan Company LLLP t 1 ' 2607 Midpoint Drive, Fort Collins, CO 80525 archistruction® Tel: 970 493-8747 Fax: 970 493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 ya OC -059 Increase°WetherC dl6onsxPJl wence Status: APP OCI Date: 02/14/2014 Owner CO #: OCO-004 Due to Owner: Scope Desc: Increase Weather conditions allowance for costs invoiced through 211/14 Source: Final Description Quantity Amount Vendor Name Weather Conditions $22,459.28 Subtotal: $22,459.28 Final Mark Ups Quantity Amount Vendor Name Fee $983.16 Insur, Bond, Warranty $855.92 Mark Ups Total: $1,839.08 Total: $24,298.36 Notes: Approved By: The Neenan Company Date Owner Date The Neenan Company LLLP ♦ ' 2607 Midpoint Drive, Fort Collins, CO 80525 970 493-8747 Fax: 970 493-5869 archistruction® Tel: CHANGE p �p p OWNER CHANGE ITEM DETAIL Project #: 2761 A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Ddve Fort Collins, CO 80526 ;rOC -Ofi7 Kz s; sAdd (3) edmg fan outlets and (1) will switch Ito Cardlo cell"Ing. Fans"byy owner - Status: APP OCI Date: 02/14/2014 Owner CO #: OCO-004 Due to Owner: 02/28/2014 Scope Desc: Source: Final Description Quantity Amount Vendor Name 3 ceiling fans and 1 wall switch at Cardio $619.00 Subtotal: $619.00 Final Mark Ups Quantity Amount Vendor Name Construction Contingency $18.57 Design Fee $43.67 Fee $27.10 Insur, Bond, Warranty $23.59 Mark Ups Total: $112.93 Notes: Approved By: The Neenan Company Owner Date Date Total: $731.93 archistructions The Neenan Company LLLP 2607 Midpoint Drive, Fort Collins, CO 80525 Tel: 970 493-8747 Fax: 970 493-5869 OWNER CHANGE ORDER Project #: 2761A Change Order #: OCO-004 Project Name: Fort Collins Senior Center Contract: 2761A Project Address: 1200 Raintree Drive Change Order Date: 03/11/2014 Fort Collins, CO 80526 The Original Contract Price was.............................................................................................................. Net Change by Previously Authorized Requests and Changes..................................................................... The Contract Price Prior to This Change Order was.................................................................................. The Contract Price will be Increased By................................................................................................ The New Contract Price Including This Change Order will be....................................................................... The Contract Time Will Not Be Changed............................................................................................ The Scheduled Substantial Completion Date as of this Change Order therefore is ........................................... ACCEPTED: The Neenan Company LLLP By: Neenan Management Company Its: General Partner Signed: By: Randolph P. Myers Its: President & CEO Date: City Of Fort Collins By: Date: $4,383,702.00 $1,216,394.86 $5,600,096.86 $55,614.15 $5,655,711.01 The Neenan Company LLLP ' 1 ' 2607 Midpoint Drive, Fart Collins, CO 80525 archistructiona Tel: 970493-8747 Fax: 970493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 a.wa r a 4 t y s.«. a:kc ;',OCI-062 s �rsgdd switch for patio fixtorea on § side'of Multipurpose ; ; Status: APP OCI Date: 02/25/2014 .Owner CO #: OCO-004 Due to Owner: 02/19/2014 Scope Desc: Source: Final Description Quantity Amount Vendor Name Electrical Quote $483.00 Subtotal: $483.00 Final Mark Ups Quantity Amount Vendor Name Construction Contingency $14.49 Design Fee $34.08 Fee $21.15 Insur, Bond, Warranty $18.41 Mark Ups Total: $88.13 Total: $571.13 Notes: Approved By: The Neenan Company Date Owner Date The Neenan Company LLLP 2607 Midpoint Drive, Fort Collins, CO 80525 archistruction® Tel: 970 493-8747 Fax: 970 493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761 A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 LOCI-063 = Change;Asphalt Paving to 6 urireidcii c8 d concrete In new;padring area' Status: APP OCI Date: 02/26/2014 Owner CO #: OCO-004 Due to Owner: Scope Desc: Source: Final Description Quantity Amount Vendor Name Change Asphalt paving to concrete in PI &P2 Parking $0.00 areas Subtotal: $0.00 Final Mark Ups Quantity Amount Vendor Name Construction Contingency - $0.00 Design Fee $0.00 Fee $0.00 Insur, Bond, Warranty $0.00 Mark Ups Total: $0.00 Total: $0.00 Notes: Approved By: The Neenan Company Owner Date Date The Neenan Company LLLP t ♦ ' Fort Midpoint Drive, Fort Collins, CO 80525 archistruction® Tel: 970 493-8747 Fax: 970 493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 'OCI-`064 Sinks and fixtures n'massage rooms Status: APP OCI Date: 03/04/2014 Owner CO #: OCO-004 Due to Owner: Scope Desc: Source: Final Description Quantity Amount Vendor Name Massage Sinks/Fixtures 3 @ $530.28 $1,590.84 Und's Plumbing & Heating, Inc Subtotal: $1,590.84 Final Mark Ups quantity Amount Vendor Name Construction Contingency $47.73 Design Fee $112.24 Fee $69.64 Insur, Bond, Warranty $60.63 Mark Ups Total: $290.24 Total: $1,881.08 Notes: Approved By: The Neenan Company Owner Date Date The Neenan Company LLLP ' ♦ ' 2607 Midpoint Drive, Fort Collins, CO 80525 archistruction® Tel: 970 493-8747 Fax: 970 493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761 A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 t OCIf65$ a Addddonor pI ques to Aunm ditou'seats Status: APP OCI Date: 03/04/2014 Owner CO #: OCO-004 Due to Owner: Scope Desc: Source: Final Description Quantity Amount Vendor Name Operable Panel Partition 120 @ $5 $600.00 American Seating Company Subtotal: $600.00 Final Mark Ups Quantity Amount Vendor Name Construction Contingency $18.00 Design Fee $42.33 Fee $26.27 Insur, Bond, Warranty $22.87 Mark Ups Total: $109.47 Total: $709.47 Notes: Approved By: The Neenan Company Date Owner Date The Neenan Company LLLP ' ♦ ' 2607 Midpoint Drive, Fort Collins, CO 80525 archistruction® Tel: 970 493-8747 Fax: 970 493-5869 OWNER CHANGE ITEM DETAIL. Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 ;,x .?3ri�i.- ✓kH2.m. w .y.. a r y ^O,a,Cl-066ry ° Theater CD DesignServi(1120-312 ces) Status: APP Owner CO #: OCO-004 Scope Desc: Description quantity OCI Date: 03/10/2014 Due to Owner: Source: Final Amount Vendor Name Acoustical Consultant $480.00 Electrical Design (Adam BG) $2,067.50 HVAC Design (Aaron IM) 21 @ $115 $2,415.00 Job Captain - Kevin D 1.5HR @ $80 $120.00 Job Captain - Shelby H 51HR @ $80 $4,080.00 Senior Architect - Bob H 2HR @ $125 $250.00 Senior Interior Designer - Maggie T 62.5HR @ $90 $5,625.00 Subtotal: $15,037.50 Total: $15,037.50 Notes: Approved By: The Neenan Company Owner Date Date The Neenan Company LLLP 1 ' 2607 Midpoint Drive, Fort Collins, CO 80525 archistruction® Tel: 970 493-8747 Fax: 970493-5869 ®V NIL CHANGE ITEM DETAIL Project#: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Ddve Fort Collins, CO 80526 06 -067''Deduct Carpet in Hallway 141 anAl d vestibules 150 &140 �_ `r '4' 1 .. Status: APP OCI Date: 03/10/2014 Owner CO #: OCO-004 Due to Owner: Scope Desc: Source: Final Description quantity Amount Vendor Name Flooring Deduct -$4,614.20 Subtotal: $4,614.20 Final Mark Ups Quantity Amount Vendor Name Construction Contingency -$138.43 Fee -$201.98 Insur, Bond, Warranty -$175.85 Mark Ups Total: $516.26 Total: -$5,130.46 Notes: Approved By: The Neenan Company Date Owner Date CHANGE ORDER NO. 04 PROJECT TITLE: Fort Collins Senior Center Expansion CONTRACTOR: The Neenan Company PROJECT NUMBER: 7440 DESCRIPTION: Various Scope Changes Fort Collins In preparing change orders show in order as separate numbered paragraphs the following: Reason for change: Add additional scope items to the original contract 2. Description of Add security items, change interior finishes, add electrical scope, compete the design for new 3. Change in contract cost: 15 4. Change in contract time: There is no change in completion date, remains June 13, 2014. (Attach additional sheets as required) ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER Total C.O. % of Original Contract ADJUSTED CONTRACT COST ACCEPTED BY: ACCEPTED BY: REVIEWED BY: $4,383,702.00 $1,216, 394.86 $0.00 $55,614.15 1.27% 29.02% $5,655,711.01 19 Project Ma er Brian 4rgott - Operations Services Print Name Bob Adams -Recreation Director APPROVED BY: Print Na���/f/( m Ken Mannon - Operations Director APPROVED BY: Print Name Gerry Paul - Purchasing Director If over $60,000 - Purchasing Director cc: City Clerk Project File Contractor Purchasing Engineer Date 3-�?-/fl Date Date Date Date O) archistructions The Neenan Company LLLP 2607 Midpoint Drive, Fort Collins, CO 80525 Tel: 970 493-8747 Fax: 970 493-5869 Project #: 2761 A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 Owner: City Of Fort Collins Address: P.O. Box 580 Fort Collins CO 80522 Attn: Brian Hergott Tel: (970) 221-6804 Fax: OWNER CHANGE ORDER Change Order #: OCO-004 Contract: 2761A Change Order Date: 03/11/2014 Title: Misc Adds and Deducts NEENAN and Owner previously entered into an Agreement for the above referenced project. NEENAN and Owner desire to issue a change order for the Agreement as described below. As modified hereby, the Agreement remains in full force and effect and NEENAN and Owner ratify and affirm the Agreement in all respects. Change Item Change Item Description Amount OCI-011 Security Camera Rough in, based on revised layout 01-22 $7,918.79 OCI-012 Power to relocated garden sheds $2,239.54 OCI-013 Add Donor pavers at Multipurpose front entry $4,800.71 OCI-028 Rough in power to flag pole for future light & install solar powered light. $1,011.00 OCI-034 Increase reception desk allowance $2,663.60 OCI-052 Reselecl Carpet, revised finished, re -issue drawings, paid with contingency $0.00 OCI-053 Ballot Box - Base cabinet with door and ballot slot with Plain top (does not include steel box) $642.07 OCI-054 Hardwire Hand driers only. $714.19 OCI-055 Install track lighting in hall 141 (per TNC sketch 1/22) $884.47 OCI-056 Deduct for EMT conduit in walls, changed to MC -$3,970.54 OCI-058 Add 2 additional outlets to canopy columns (4 total) $611.31 OCI-059 Increase Weather Conditions Allowance $24,298.36 OCI-061 Add (3) ceiling fan outlets and (1) wall switch to Cardio ceiling. Fans by owner $731.93 OCI-062 Add switch for patio fixtures on S side of Multipurpose $571.13 OCI-063 Change Asphalt Paving to 6" unreinforced concrete in new parking area $0.00 OCI-064 Sinks and fixtures in massage rooms $1,881.08 OCI-065 Add donor plaques to Auditorium seats $709.47 OCI-066 Theater CD Design Services (1/20-3/2) $15,037.50 OCI-067 Deduct Carpet in Hallway 141 and vestibules 150 &140 -$5,130.46 Total: $55,614.15 The Neenan Company LLLP 2607 Midpoint Drive, Fort Collins, CO 80525 archistructions Tel: 970 493-8747 Fax: 970 493-5869 OWNER CHANCE ORDER Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 Change Order #: OCO-004 Contract: 2761A Change Order Date: 03/11/2014 The Original Contract Price was.............................................................................................................. $4,383,702.00 Net Change by Previously Authorized Requests and Changes ..................................................................... $1,216,394.86 The Contract Price Prior to This Change Order was.................................................................................. $5.600,096.86 The Contract Price will be Increased By................................................................................................ $55,614.15 The New Contract Price Including This Change Order will be ....................................................................... $5,655,711.01 The Contract Time Will Not Be Changed............................................................................................ The Scheduled Substantial Completion Date as of this Change Order therefore is ........................................... ACCEPTED: The Neenan Company LLLP By: Neenan Management Company Its: General Partner City Of Fort Collins Signed: By: Randolph P. Myers By: Its: President & CEO Date: Date: The Neenan Company LLLP I 2607 Midpoint Drive, Fort Collins, CO 80525 archistruction® Tel: 970 493-8747 Fax: 970 493-5869 (� OWNER CHANGE ITEM DETAIL Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 Dd-011 5ecurity';Camera'Ro`ugh In basedon revised layout 07-22 Status: APP OCI Date: 09/23/2013 Owner CO #: OCO-004 Due to Owner: 1110112013 Scope Desc: Source: Final Description Quantity Amount Vendor Name Security camera rough in $6,697.00 Subtotal: $6,697.00 Final Mark Ups Quantity Amount Vendor Name Construction Contingency $200.91 Design Fee $472.50 Fee $293.16 Insur, Bond, Warranty $255.22 Mark Ups Total: $1,221.79 Total: $7,918.79 Notes: Approved By: The Neenan Company Date Owner Date The Neenan Company LLLP 1 ' 2607 Midpoint Drive, Fort Collins, CO 80525 archistructions Tel: 970 493-8747 Fax: 970 493-5869 OWNER CHANGE ITEM DETAIL Project#:.2761A . Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 Status: APP OCI Date: 09/23/2013 Owner CO M OCO-004 Due to Owner: 11/01/2013 Scope Desc: Source: Final Description Quantity Amount Vendor Name Security camera rough in $6,697.00 Subtotal: $6,697.00 Final Mark Ups Quantity Amount Vendor Name Construction Contingency $200.91 Design Fee $472.50 Fee $293.16 Insur, Bond, Warranty $255.22 Mark Ups Total: i $1,221.79 Total: $7,918.79 Notes: Approved By: The Neenan Company Date Owner Date The Neenan Company LLLP ' ♦ ' 2607 Midpoint Drive, Fort Fort Collins, CO 80525 archistruction® Tel: 970 493-8747 Fax: 970 493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761 A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 `.00I-012to relocated garden sheds L, Status: APP OCI Date: 09/23/2013 Owner CO #: OCO-004 Due to Owner: 12/01/2013 Scope Desc: Source: Final Description Quantity Amount Vendor Name Electrical $1,894.00 Subtotal: $1,894.00 Final Mark Ups Quantity Amount vendor Name Construction Contingency - $56.82 Design Fee $133.63 Fee $82.91 Insur, Bond, Warranty $72.18 Mark Ups Total: $345.54 Total: $2,239.54 Notes: Approved By: The Neenan Company Date Owner Date The Neenan Company LLLP ' 1 I 2607 Midpoint Drive, Fort Collins, CO 80525 archistruction® TeI: 970 493-8747 Fax: 970 493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761 A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 sOCI-0 3fa * ° . l cf Donor pavers at Multipuipos'e front entry'„ Y 7 . Status: APP OCI Date: 11/01/2013 Owner CO #: OCO-004 Due to Owner: 03/01/2013 Scope Desc: Source: Final Description Quantity Amount Vendor Name Permiter curb 160 @ $6 $960.00 r- Planting Accessories 300 @ $6 $1,800.00 Site Cut/Fill 1 @ S400 $400.00 Underdrain 300 @ $3 $900.00 Subtotal: $4,060.00 Final Mark Ups Quantity Amount Vendor Name Construction Contingency $121.80 Design Fee $286.45 Fee $177.73 Insur, Bond, Warranty $154.73 Mark Ups Total: $740.71 Total: $4.800.71 Notes: Approved By: The Neenan Company Date Owner Date The Neenan Company LLLP ' ♦ ' 2607 Midpoint Drive, Fort Collins, CO 80525 Tel: 970493-8747 Fax: 970493-5869 archistructione OWNER CHANGE ITEM DETAIL Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 :OC1;028 r +Rough pbwe?lo flag pole_for future lightai Install solar powered light. -In Status: APP OCI Date: 10/24/2013 Owner CO #: OCO-004 Due to Owner: 12/31/2013 Scope Desc: Source: Final Description Quantity Amount Vendor Name Solar Flag Pole Light $855.00 Subtotal: $855.00 Final Mark Ups Quantity Amount Vendor Name Construction Contingency $25.65 Design Fee $60.33 Fee $37.43 Insur, Bond, Warranty $32.59 Mark Ups Total: $156.00 Total: $1,011.00 Notes: Approved By: The Neenan Company Date Owner Date The Neenan Company LLLP I ' ♦ 2607 Midpoint Drive, Fort Collins, CO 80525 archistruction® Tel: 970493-8747 Fax: 970493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 Status: APP OCI Date: 11/27/2013 Owner CO #: OCO-004 Due to Owner: Scope Desc: Source: Final Description Quantity Amount Vendor Name Custom Casework $2,462.00 Subtotal: $2,462.00 Final Mark Ups Quantity Amount Vendor Name Fee $107.78 Insur, Bond, Warranty $93.82 Mark Ups Total: $201.60 Total: $2,663.60 Notes: 27-NOV-13 - Final cost savings from partition tbd. TNC will transfer savings to reception desk allowance. Remainder to be OCO to increase allowance to 20K. Approved By: The Neenan Company Date Owner Date The Neenan Company LLLP / ♦ ' 2607 Midpoint Drive, Fort Collins, CO 80525 archistruction® Tel: 970 493-8747 Fax:: 970 493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 'bill'' s .txdlig._' r�, $aaia^e�.Jrea w Y „t-a. OCI-052 j � � ReselectCarpet3revised finished �"re-Issue drawings paid with contingency i^*,g'�, Status: APP OCI Date: 02/05/2014 Owner CO #: OCO-004 Due to Owner: Scope Desc: Source: Final Description Quantity Amount Vendor Name Contingency - TNC $2,160.00 Senior Interior Designer 24HR @ $90 $2,160.00 Subtotal: $0.00 Total: $0.00 Notes: Approved By: The Neenan Company Owner Date Date The Neenan Company LLLP ' 1 ' 2607 Midpoint Drive, Fort Collins, CO 80525 archistruction® Tel: 970493-8747 Fax: 970493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 0-053 Ballot Box Base cabinet with door and ballot slot with Plain top (do'es`not mclude steel Status: APP OCI Date: 02/06/2014 Owner CO #: OCO-004 Due to Owner: 03/05/2014 Scope Desc: Source: Final Description Quantity Amount Vendor Name Custom Casework - $543.00 Subtotal: $543.00 Final Mark Ups _ Quantity Amount Vendor Name Construction Contingency $16.29 Design Fee $38.32 Fee $23.77 Insur, Bond, Wananty $20.69 Mark Ups Total: $99.07 Total: $642.07 Notes: Approved By: The Neenan Company Owner Date Date The Neenan Company LLLP 2607 Midpoint Drive, Fort Collins, CO 80525 archistructions Tel: 970 493-8747 Fax: 970 493-5869 p� OWNER CHANGE ITEM DETAIL Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 30CI-054'' ` 1fardwire Hand driers only. AT .,`i... Status: APP OCI Date: 02/07/2014 Owner CO #: OCO-004 Due to Owner: 02/14/2014 Scope Desc: Source: Final Description Quantity Amount Vendor Name Wiring for hand diners $604.00 Subtotal: $604.00 Final Mark Ups Quantity Amount Vendor Name Construction Contingency $18.12 Design Fee $42.61 Fee $26.44 Insur, Bond, Warranty $23.02 Mark Ups Total: $110.19 Total: $714.19 Notes: 10-MAR-14 - Paper towel dispenser will be battery operated (meeting 317) Approved By: The Neenan Company Date Owner Date The Neenan Company LLLP 1 1 ' 2607 Midpoint Drive, Fort Collins, CO 80525 archistructions Tel: 970493-8747 Fax: 970493-588669 �p OWNER CHANGE ITEM DETAIL Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 OCI-055 +Install Gaek Iighhng In hall 141 (per TNC sketch 1122) r �,. Status: APP OCI Date: 02/07/2014 Owner CO M OCO-004 Due to Owner: 02/14/2014 Scope Desc: Source: Final Description Quantity Amount Vendor Name Electrical Quote $748.00 Subtotal: $748.00 Final Mark Ups Quantity Amount Vendor Name Construction Contingency $22.44 Design Fee $52.78 Fee $32.74 Insur, Bond, Warranty $28.51 Mark Ups Total: $136.47 Total: $884.47 Notes: Approved By: The Neenan Company Owner Date Date The Neenan Company LLLP ' ♦ ' 2607 Midpoint Drive, Fort Collins, CO 80525 archistruction® Tel: 970493-8747 Fax: 970493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 �ya,F,'xnxx&t ti4J%d t va'u r xk>.y.%w•"d. T+c . du ?OCI-056 3 Dect for EMT conduit in walls changed to MC :1 P „'.- t [g64fJ'e'�u �,'M,x.; < a, -ram s .<ri': r . >•.: `k�.xa'' Status: APP OCI Date: 02JO712014 Owner CO #: OCO-004 Due to Owner: 02/19/2014 Scope Desc: Source: Final Description Quantity Amount Vendor Name Electrical Quote -$3,571.00 Subtotal: -$3,571.00 Final Mark Ups Quantity Amount Vendor Name Construction Contingency -$107.13 Fee -$156.32 Insur, Bond, Warranty -$136.09 Mark Ups Total: -$399.54 Total: -$3,970.54 Notes: Approved By: The Neenan Company Date Owner Date The Neenan Company LLLP ♦ I 2607 Midpoint Drive, Fort Collins, CO 80525 archistructions Tel: 970 493-8747 Fax: 970 493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 "OCI-058q m ?^' Add 2 additionaloutlets to canopy columns;(4"total) Status: APP OCI Date: 02/07/2014 Owner CO #: OCO-004 Due to Owner: 02/19/2014 Scope Desc: Source: Final Description Quantity Amount Vendor Name Electrical Quote $517.00 Subtotal: $517.00 Final Mark Ups Quantity Amount Vendor Name Construction Contingency $15.51 Design Fee $36.47 Fee $22.63 Insur, Bond, Warranty $19.70 Mark Ups Total: $94.31 Total: $611.31 Notes: Approved By: The Neenan Company Date Owner Date The Neenan Company LLLP t 2607 Midpoint Drive, Fort Collins, CO 80525 archistruction® Tel: 970493-8747 Fax: p970493-588669�°►�p �y �p p OWNER CHANGE ITEM DETAIL Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 OCI-012fiiPower to relocated garden sheds _ )w;;- Status: APP OCI Date: 09/23/2013 Owner CO #: OCO-004 Due to Owner: 12/01/2013 Scope Desc: Source: Final Description Quantity Amount Vendor Name Electrical $1,894.00 Subtotal: $1,894.00 Final Mark Ups Quantity Amount Vendor Name Construction Contingency $56.82 Design Fee $133.63 Fee $82.91 Insur, Bond, Warranty $72.18 Mark Ups Total: $345.54 Total: $2,239.54 Notes: Approved By: The Neenan Company Date Owner Date The Neenan Company LLLP ' ♦ I 2607 Midpoint Drive, Fort Collins, CO 80525 archistructionO Tel: 970 493-8747 Fax: 970 493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 -Status: APP OCI Date: 02/14/2014 Owner CO M OCO-004 Due to Owner: Scope Desc: Increase Weather conditions allowance for costs invoiced through 2/1/14 Source: Final Description Quantity Amount Vendor Name Weather Conditions $22,459.28 Subtotal: $22,459.28 Final Mark Ups Quantity Amount Vendor Name Fee $983.16 Insur, Bond, Warranty $855.92 - Mark Ups Total: $1,839.08 Total: $24,298.36 Notes: Approved By: The Noonan Company Date Owner Dale The Neenan Company LLLP 2607 Midpoint Drive, Fort Collins, CO 80525 archistructions Tel: 970493-8747 Fax: 970493-5869 ®INNER CHANGE ITEM DETAIL Project #: 2761 A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 OC1.06 % sa-.vrr J'. ,L Add(3):ceiling fan o'titlets end (1) wall switch to Cardlo ceiling Fanstiy'owner 4 a - Status: APP OCI Date: 02/14/2014 Owner CO #: OCO-004 Due to Owner: 02/28/2014 Scope Desc: Source: - Final Description Quantity Amount Vendor Name 3 ceiling fans and 1 wall switch at Cardio $619.00 Subtotal: $619.00 Final Mark Ups Quantity Amount Vendor Name Construction Contingency $18.57 Design Fee $43.67 Fee $27.10 Insur, Bond, Warranty $23.59 Mark Ups Total: $112.93 Total: $731.93 Notes: Approved By: The Neenan Company Date Owner Date The Neenan Company LLLP ' ♦ I 2607 Midpoint Drive, Fort Collins, CO 80525 archistructiont Tel: 970493-8747 Fax: 970493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761 A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive , Fort Collins, CO 80526 OC62 agA`dd sw ch foipatio f [ores"on S side of Multipurpose Status: APP OCI Date: 02125/2014 Owner CO #: OCO-004 Due to Owner: 02/19/2014 Scope Desc: Source: Final Description Quantity Amount vendor Name Electrical Quote $483.00 Subtotal: $483.00 Final Mark Ups Quantity Amount Vendor Name Construction Contingency $14.49 Design Fee $34.08 Fee $21.15 Insur, Bond, Warranty $18.41 Mark Ups Total: $88.13 Notes: Approved By: The Neenan Company Owner Date Date Total: $571.13 The Neenan Company LLLP ' 1 ' 2607 Midpoint Drive, Fort Collins, CO 80525 archistructioriv Tel: 970 493-8747 Fax: 970 493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Rainlree Drive Fort Collins, CO 80526 Status: APP OCI Date: 02126/2014 Owner CO M OCO-004 Due to Owner: Scope Desc: Source: Final Description Quantity Amount Vendor Name Change Asphalt paving to concrete in P18P2 Parking $0.00 areas Subtotal: $0.00 Final - Mark Ups Quantity Amount Vendor Name Construction Contingency $0.00 Design Fee $0.00 Fee $0.00 Insur, Bond, Warranty $0.00 Mark Ups Total: $0.00 Total: $0.00 Notes: Approved By: The Neenan Company Date Owner Date The Neenan Company LLLP ' 1 I 2607 Midpoint Drive, Fort Collins, CO 80525 archistructions Tel: 970 493-8747 Fax: 970 493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 OCI-064 ` "ySinks nd fl tx ures n ma yerroo`ms r ',r�k.fg_ ',tx S d= Status: APP OCI Date: 03/04/2014 Owner CO M OCO-004 Due to Owner: Scope Desc: Source: Final Description Quantity Amount Vendor Name Massage Sinks/Fixtures 3 @ $530.28 $1,590.84 Lind's Plumbing & Heating, Inc Subtotal: $1,590.84 Final Mark Ups Quantity Amount Vendor Name Construction Contingency $47.73 Design Fee $112.24 Fee $69.64 Insur, Bond, Warranty $60.63 Mark Ups Total: $290.24 Total: $1,881.08 Notes: Approved By: The Neenan Company Date Owner Date The Neenan Company LLLP ' 1 I 2607 Midpoint Drive, Fort Collins, CO 80525 archistructions Tel: 970493-8747 Fax: 970493-5869 �p OWNER CHANGE ITEM DETAIL Project #: 2761 A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 gOCl-065 J'A '-b{y%udd donor piaq es'to Auditorlum�seats Status: APP OCI Date: 03/04/2014 Owner CO #: OCO-004 - Due to Owner: Scope Desc: Source: Final Description Quantity Amount Vendor Name Operable Panel Partition 120 @ $5 $600.00 American Seating Company Subtotal: $600.00 Final Mark Ups Quantity Amount Vendor Name Construction Contingency $18.00 Design Fee $42.33 Fee $26.27 Insur, Bond, Warranty $22.87 Mark Ups Total: $109.47 Total: $709.47 Notes: Approved By: The Neenan Company Date Owner Date The Neenan Company LLLP I ' ♦ ' 2607 Midpoint Drive, Fort Collins, CID 80525 archistructione Tel: 970493-8747 Fax: 970493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761 A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive . Fort Collins, CO 80526 OCI-0�68a "d,+ *4pTheater;CD Deslgn§ervlces (1120=312) t ,p Status: APP Owner CO #: OCO-004 Scope Desc: Description Quantity OCI Date: 03/10/2014 Due to Owner: Source: Final Amount Vendor Name Acoustical Consultant $480.00 Electrical Design (Adam BG) $2,067.50 HVAC Design (Aaron IM) 21 @ $115 $2,415.00 Job Captain - Kevin D 1.51HR @ $80 $120.00 Job Captain - Shelby H 51 HR @ $80 $4,080.00 Senior Architect - Bob H 2HR @ $125 $250.00 Senior Interior Designer - Maggie T 62.51HR @ $90 $5,625.00 Subtotal: $15,037.50 Total: $15,037.50 Notes: Approved By: The Neenan Company Owner Date Date The Neenan Company LLLP ' t ♦ ' 2607 Midpoint Drive, Fort Collins, CO 80525 archistructions Tel: 970 493-8747 Fax: 970 493-5869 OWNER CHANCE ITEM DETAIL Project #: 2761 A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 OCR 106 v f j Deduct Carpet In Hallway 741 and vestibu'Ies,750 8140 s Status: APP OCI Date: 03/10/2014 Owner CO M OCO-004 Due to Owner: Scope Desc: Source: Final Description Quantity Amount Vendor Name Flooring Deduct -$4,614.20 Subtotal: -$4,614.20 Final Mark Ups Quantity Amount Vendor Name Construction Contingency -$138.43 Fee -$201.98 Insur, Bond, Warranty -$175.85 Mark Ups Total: •$516.26 Total: -$5,130.46 Notes: Approved By: The Neenan Company Date Owner Date The Neenan Company LLLP ' 1 I 2607 Midpoint Drive, Fort Collins, CO 80525 archistructions Tel: 970 493-8747 Fax: 970 493-5869 OWNER CHANGE ITEM DETAIL Project#: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Rainlree Drive Fort Collins, CO 80526 I:OCI-013 >i s Add Donor pavers atYMultipurpose front entry'- Status: APP OCI Date: 1110112013 Owner CO M OCO-004 Due to Owner: 03/01/2013 Scope Desc: Source: Final Description Quantity Amount Vendor Name Permiter curb 160 @ $6 $960.00 r- Planting Accessories 300 @ $6 $1,800.00 Site Cut/Fill i @ $400 $400.00 Underdrain 300 @ $3 $900.00 Subtotal: $4,060.00 Final Mark Ups Quantity Amount Vendor Name - Construction Contingency $121.80 Design Fee $286.45 Fee $177.73 Insur, Bond, Warranty $154.73 Mark Ups Total: $740.71 Total: $4,800.71 Notes: Approved By: The Neenan Company Date Owner Dale The Neenan Company LLLP ' ♦ ' 2607 Midpoint Drive, Fort Collins, CO 80525 archistruction® Tel: 970 493-8747 Fax: 970 493-5869 p� OWNER CHANGE ITEM DETAIL Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 Status: APP OCI Dale: 10/24/2013 Owner CO #: OCO-004 Due to Owner: 12/31/2013 Scope Desc: Source: Final Description Quantity Amount Vendor Name Solar Flag Pole Light $855.00 Subtotal: $855.00 Final Mark Ups Quantity Amount Vendor Name Construction Contingency $25.65 Design Fee $60.33 Fee $37.43 Insur, Bond, Warranty $32.59 Mark Ups Total: $156.00 Total: $1,011.00 Notes: Approved By: The Neenan Company Date Owner Date The Neenan Company LLLP ♦ ' 2607 Midpoint Drive, Fort Collins, CO 80525 archistructions Tel: 970493-8747 Fax: 970493-5869 OWNER CHANGE ITEM DETAIL Project #: 2761A Project Name: Fort Collins Senior Center Project Address: 1200 Raintree Drive Fort Collins, CO 80526 l�BBntbukcv»'�W%Yi"aU ffih n "'FOCI 034- k . `�, Increase reception desallowance'i RIM,. 6G.). Status: APP OCI Date: 11/27/2013 Owner CO #: . OCO-004 Due to Owner: Scope Desc: Source: Final Description Quantity Amount Vendor Name Custom Casework $2,462.00 Subtotal: $2,462.00 Final Mark Ups Quantity Amount Vendor Name Fee $107.78 Insur, Bond, Warranty $93.82 Mark Ups Total: $201.60 Total: $2,663.60 Notes: 27-NOV-13 - Final cost savings from partition tbd. TNC will transfer savings to reception desk allowance. Remainder to be OCO to increase allowance to 20K. Approved By: The Neenan Company Date Owner Date