Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7568 BRYAN AVE BRIDGE REPLACEMENTCity Of Planning, Development & Transportation [\I 2911Jorlh Cotlepa Avenue P.O. Box 580 Engineering Foe coups, Co 80522e5M 970.221.6605 970.221.6378 - ten Change Order Form PROJECTTITLE: Bryan Bridge Repairs PROJECT NUMBER: 400902101.6 ( Bid #7568) CONTRACTOR: Zak Dirt (PO 091367781 In preparing change orders show In order as separate numbered paragraphs the following: 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change In oontraet time. 1.82. See attached invoice for details 3. The contract cost will Increase by $31,925.01 4. There will be no change In contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED BY: REVIEWED BY: SUBMITTED BY: APPROVED BY: $728.807.95 $0.D0 $0.00 _ $31.925.01 4.38% 4.38% $760,732.96 DATE:. DATE: DATE: 3- Lq• lLJ APPROVED BY: DATE: (Purchasing Agent over $60,000) cc: Contractor PwoheWp Project F9e -mom=v�s,V x r Bryan Bridge Replacement "— mz�n� as scsx "" . c ZAK Dirt 1 1.5" Washed Rock TON 235 $ 37.00 $ 8,685.01 Shoring Area 2 is 1 $ 23,240.00 $ 23,240.00 "FNt� .• •M16' l S :SY:L9I."u 7ime.Ext foi 6 an Closure 4TDa s, Re O emn F.eb fZfh 2 r W $ * Ig a_k, TOTAL 31.925.01 ad contractor to use 24 inch deep 1.5' clean rock bedding below concrete box structure. Additional shoring required to work on foundations with vertical cuts exceeding 10 feet in height.