PROJECTTITLE: Bryan Bridge Repairs
PROJECT NUMBER: 400902101.6 ( Bid #7568)
CONTRACTOR: Zak Dirt (PO 091367781
In preparing change orders show In order as separate numbered paragraphs the following:
1. Reason for change. 2. Description of change.
3. Change in contract cost. 4. Change In oontraet time.
1.82. See attached invoice for details
3. The contract cost will Increase by $31,925.01
4. There will be no change In contract time.
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
ACCEPTED BY:
REVIEWED BY:
SUBMITTED BY:
APPROVED BY:
$728.807.95
$0.D0
$0.00
_ $31.925.01
4.38%
4.38%
$760,732.96
DATE:.
DATE:
DATE: 3- Lq• lLJ
APPROVED BY: DATE:
(Purchasing Agent over $60,000)
cc: Contractor
PwoheWp
Project F9e
-mom=v�s,V x
r
Bryan Bridge Replacement
"— mz�n� as scsx "" . c
ZAK Dirt
1
1.5" Washed Rock TON 235
$ 37.00
$ 8,685.01
Shoring Area 2 is 1
$ 23,240.00
$ 23,240.00
"FNt� .• •M16' l S :SY:L9I."u
7ime.Ext foi 6 an Closure 4TDa s, Re O emn F.eb fZfh 2
r W
$ *
Ig a_k,
TOTAL
31.925.01
ad contractor to use 24 inch deep 1.5' clean rock bedding below concrete box structure. Additional shoring required to
work on foundations with vertical cuts exceeding 10 feet in height.