HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9141475Traffic Operations Itemized Estimate
ork Order ID Work Order Location - Work Order Description
171991 • • •
Estimate Date Projected Start Date Projected Finish Date SJFJ 1Billable Project
r r I r OO
Work Order Instruction
and install bus stop signs
.....- -- -- ............. _............................................ ......................... — ------- ............... -- — -..............
Labor
Descriptio n Ho maRegular Overtime Extended Cost
STREET SIGN TECHNICIAN 125.00 5,088.00 0.00 5,088.00
TRAFFIC EQUIPMENT OPERATOR 1 330.00 11,194.92 0.00 11,194.92
Total Labor 16,282.92
Materials
Description
COMPLETED I HERMOPRINTED 3 COLOR PREMIUM WHITE
750.00
2.99
2,241.00
No Parking Symbol 12"x12" It SOFT)
200.00
9.35
1,869.60
PREMIUM WHITE VINYL
50.00
1.44
72.00
Premium Protect Overlay Film -
800.00
3.82
1,526.40
Telespar 10' x 2" Post
500.00
26.86
13,428.00
Telespar 3' x 2.25" Stub
500.00
8.74
4,368.00
Vinyl Electro Cut, Any Color or Size
800.00
1.32
528.00
Total Estimated Material
24,033.00
Equipment
ISUZU SIGN TRUCK 165.00 5,643.00
TRUCK W/LIFT 165.00 4,950.00
Total Equipment Cost
10,593.00
Summary For Work Order 171991
Lc9ftTE' / 101ALtk
Labor \y1jc>ot,' OFC — -<4AF;F1 C-
C' $16,282.82
Materials pv\/t�. wt"0r3 $24,033.00
Equipment - jsb^O$•gQ $70,593.00
Total `� l� •� ��+9o�al 56�4�5 $50,908.92
-- ........... ._ _..........._..._....92�tQ�Q«4. .............
Please Note - This Is an estimate only - additional expenses may be necessary to complete the work.
seOf S C�v�.d`SG —� (.OUA L-.
Page 1 of 1
Tra
1
City of
6570 Port er Road
6570 Porter Road
Fo0.221.286-fa0522
Fort Collins
970.221.6620
970.221.6285 -fax
/cgov.com
Memorandum
DATE: 3/5/2014
TO: Jill Wilson
FROM: Karl Gannon
SUBJECT: Bus Stop Signage - Justification of Sole Source
Transfort is contracting with Traffic Operations to produce and install 500 x replacement bus
posts and associated signage, throughout the City. Local funds only will be used for the
procurement because the steel poles were originally acquired by Traffic Operations through a
municipal contract that was not bid out under federal purchasing guidelines.
Staff believes that the underlying contract with Traffic Operations is justifiable as a sole source
procurement for a number of reasons — cost, expertise, and expediency. The quoted cost (Work
Order ID # 171991) is similar in pricing to related work that occurred in 2013. Traffic
Operations also has the personnel and equipment on -hand to undertake and complete the project
by the desired May 10, 2014 date. In addition, Traffic Operations has the expertise to negotiate
needed utility relocates or workarounds with the minimum of downtime.
As a means of verifying estimates for this project, I referred to Work Order ID # 170208
(11/13/13) for comparison and found identical pricing.
Please contact me with any questions.
Thanks,
Karl
Karl Gannon
City of Fort Collins
Transfort / Dial A Ride
(970)416-2087
Jill Wilson
From: Gerry S. Paul
Sent: Monday, March 10, 2014 11:50 AM
To: Jill Wilson
Subject: RE: Transfort PO -Traffic Operations
This sole source purchase is approved in accordance with City Municipal Code Chapter 8, Article IV, Sec. 8-161, d(1), b;
Although there exists more than one (1) responsible source, a competitive process cannot reasonably be used or, if
used, will result in a substantially higher cost to the City, will otherwise injure the City's financial interests or will
substantially impede the City's administrative functions or the delivery of services to the public.
Gerry Paul
Director of Purchasing and Risk Management
215 N. Mason
City of Fort Collins
970-221-6779-0
970-567-9840-C
gspaul@fcgov.com
-----Original Message -----
From: Jill Wilson
Sent: Monday, March 10, 2014 9:50 AM
To: Gerry S. Paul
Subject: FW: Transfort PO -Traffic Operations
Hi Gerry,
As previously discussed, Transfort is requesting a PO to be issued to the Traffic division for about 500 bus stop signs.
Attached is the Sole Source Justification email and other supporting docs.
I had John and Ed review but before issuing a PO, I wanted your input/approval to proceed.
Thanks!
Jill
-----Original Message -----
From: Melissa Brooks
Sent: Monday, March 10, 2014 9:04 AM
To: Jill Wilson
Subject: Transfort PO -Traffic Operations
-----Original Message -----
From: Scanner Email [mailto:Scanner Email]
Sent: Monday, March 10, 2014 9:58 AM
To: Melissa Brooks
Subject: Scanned image from MX-4101N
Reply to: Scanner Email <Scanner Email>
Device Name: Not Set
Device Model: MX-4101N
Location: Not Set
File Format: PDF (Medium)
Resolution: 200dpi x 200dpi
Attached file is scanned image in PDF format.
Use Acrobat(R)Reader(R) or Adobe(R)Reader(R) of Adobe Systems Incorporated to view the document.
Adobe(R)Reader(R) can be downloaded from the following URL:
Adobe, the Adobe logo, Acrobat, the Adobe PDF logo, and Reader are registered trademarks or trademarks of Adobe
Systems Incorporated in the United States and other countries.
http://www.adobe.com/
Karl Gannon
From: Timothy Wilder
Sent: Wednesday, March 05, 2014 3:05 PM
To: Karl Gannon
Cc: Emma Belmont
Subject: Fwd: Estimate for Bus Stop signs
Attachments:. Bus Stop signs 2014 Itemized Estimate.pdf, ATT00001.htm
Karl,
This is for updating the division budget.
Thanks.
Timothy Wilder, A.I.C.P.
Service Development Manager
Transfort - City of Fort Collins
twilder@fcgov.com
(970)416-2113
Begin forwarded message:
From: Rich Brewbaker <rbrewbaker@fcgov.com>
Date: March 5, 2014 at 3:00:38 PM MST
To: Timothy Wilder <TWILDER@fcgov.com>
Cc: Joe Olson <JOlson@fcgov.com>, Sandy Aragon <saragon@fcgov.com>, ChrisJacomet
<ciacomet@fcgov.co m>
Subject: Estimate for Bus Stop signs
I forgot to send the attachment sorry.
Timothy,
I have attached the estimate for the bus stop signs. This is for installation and fabrication of 500 signs.
We charge actual time and materials so this could vary. So it is a best guess.
I am not sure how many brand new installations we have so it is hard to estimate locate times. We will
also have to move some of our signs because they are shared with the bus stops. We also have design
time for the actual signs themselves so if we have many more changes, the cost of the signs will go up.
Right nowjust the sign will cost about $18.50 each including labor, covering the backs, fabrication and
the protective film. The rest of the cost is labor, equipment and posts and stubs.
I will be on vacation the next week and a half (back on the 17th of March) so if you have questions you
can call Chris Jacomet at 310-1223.
Rich Brewbaker
Crew Chief
City of Fort Collins Traffic Operations
970-221-6792
970-568-2993 cell
rbrewba ker@fcgov.co m
Rich Brewbaker
Crew Chief
City of Fort Collins Traffic Operations
970-221-6792
970-568-2993 cell
rbrewbakerg fcaov.com