HomeMy WebLinkAboutCHANGE ORDER - BID - 7543 NEW OFFICE BUILDING AT NIX FARM NATURAL AREAS FACILITY (2)IJ;�e1tL��irrl�� e ► F1G.*y CHANGE ORDER NO. 2 Nix Farm - New Office Heath Construction PROJECTNUMBER: OP-449315 723­9 a DESCRIPTION: New Office Building City of F6rt Collins In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change: LO 2. Description of change• 3. Change in contract cost: to the 5 - 2" trees & 77 - #5 4. Change in contract time: Yes. Weather (Attach additional sheets as_ required) #1 will add 9 calendar rey COR #1 dated als and 1.5" river rock in Heath letter dated ORIGINAL CONTRACT COST $1,240,597.00 TOTAL APPROVED CHANGE ORDERS -$11,014.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER -$681.75 TOTAL % OF THIS CHANGE ORDER -0.05% Total C.O. % of Original Contract -0•94% ADJUSTED CONTRACT COST $1,228,901.25 (Assuming all chance orders approved) ACCEPTED BY: Contractor's Representative David Stolle ACCEPTED BY: Project REVIEWED BY: APPROVED BY: Ken Mannon Sears Coaens APPROVED BY: fy/N t /✓/uf.1 t vim - Print Name Barb Brock If over $60,000 - Purchasing Director cc: City Clerk Project File Contractor Purchasing Engineer I I'Zl 1 N Date Date 7 Date s Date 33 / Dat CHANGE ORDER NO. 3 PROJECT TITLE: Nix Farm - New Office Building CONTRACTOR: Heath Construction PROJECT NUMBER: oP-449315 DESCRIPTION: Nix Farm - New Office Building .Fort Collins In preparing change orders show in order as separate numbered paragraphs the following: Reason for change: Air barrier design changes per Adler -Lingle -Massey CDR #2 dated 12/24/13. 2. Description of char 3. Change in contract -Deletion of fluid smiled air barrier and the addition of We on all rigid insulation 4. Change in contract time: No. (Attach additional sheets as required) ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER Total C.O. % of Original Contract ADJUSTED CONTRACT COST ACCEPTED BY: ACCEPTED BY: REVIEWED BY $1,240,597.00 -$11,014.00 -$681.75 $2,128.07 -0.17% -1.11 % Representative David stolte Ethan Coaens $1,226,773.18 j IzI 1 Date [Yale ' C' Print Na 8 Ken Mannon Date i APPROVED BY: Print N Mark APPROVED BY �) Barb Brock If over $50,000 - Purchasing Director cc: City Clerk Project File Contractor Purchasing Engineer Vs/ 14- Date ,j3,3 / Date CHANGE ORDER NO. 4 PROJECT TITLE: Nix Farm - New Office Building CONTRACTOR: Heath Construction PROJECT NUMBER. OP-449315 DESCRIPTION: Nix Farm - New Office Building Fort Collins In preparing change orders show in order as separate numbered paragraphs the following: Reason for change: Interior door glass change per Aller-Lingle-Massey COR #3 dated 1215113. 2. Description of change:Revthe Interior wood door from 1/4" tempered frosted glass to 114" tempered ealser g ass. 3. Change in contract cost: Yes. 4. Change in contract time: No. (Attach additional sheets as required) ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS. TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER Total C.O. % of Original Contract ADJUSTED CONTRACT COST ACCEPTED BY: ACCEPTED BY: REVIEWED BY: APPROVED BY: $1,240.597.00 -$11,014.00 -$2,809.82 1.52 -0.08% -1.19% David Stolte Project Managef Ethan Coaens Ken Mannon Mark Sears APPROVED BY,• v w Print ame Barb erode If over $60,000 - Purchasing Director cc: City Clerk Project File Contractor Purchasing Engineer $1,225,811.66 L ) Date Date — Dale rz 3 /¢- Date 3 / Dat CHANGE ORDER NO. 5 PROJECT TITLE: Nix Farm - New Office Building CONTRACTOR: Heath Construction PROJECT NUMBER: OP-449315 DESCRIPTION: Nix Farm - New Office Building Fort Collins In preparing change orders show in order as separate numbered paragraphs the following: Reason for change: Deletion of two drilled wells per Aller-Lingle-Massey CDR #5 dated 12/24/13. 2. Description of change -Delete two boreholes for the geothermal system. The system had six holes and now will haVe 4. 3. Change in contract cost: Yes. 4. Change in contract time: No. (Attach additional sheets as required) ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER -0•64% Total C.O. % of Original Contract -1.84% ADJUSTED CONTRACT COST (Assurnim all char ge orders =rovedli $1240,597.00 -$11,014.00 -$3,771.34 48,000.00. $1,217,811.66 Lt 1 ACCEPTED BY: Contractors Representative David state Date ACCEPTED BY: Project Manag Ethan Coaens Date REVIEWED BY: Print NaAle Ken Mannon Date APPROVED BY: 1¢ Print if Marks rs Date APPROVED BY` ,L Prin Name Barb Brock Date If over $60,000 - Purchasing Director W. City Clerk Project File Contractor Purchasing Engineer CHANGE ORDER NO. 6 City Of PROJECT TITLE: Nlx Farm - New Office Building C �t COIFS CONTRACTOR: Heath Construction PROJECT NUMBER: OP-449315 DESCRIPTION: Nix Farm - New Office Building In preparing change orders show in order as separate numbered paragraphs the following: 1, Reason for change: Fur Interior walls to provide space for HVAC retums per Aller-Lingle-Massey COR 2. Description of change:Add 2x3 furring in two interior wan locations per COR #6. 3. Change in contract cost: Yes. 4. Change in contract time: No. (Attach additional sheets as required) ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER Total C.O. % of Original Contract ADJUSTED CONTRACT COST ACCEPTED BY. ACCEPTED BY: Manager REVIEWED BY: 0.03% -1.81 % David Stolte $1.240,597.00 -$11,014.00 -$11,771.34 5.31 $1.218.166.97 (lz, I ►4 Date Date I Print NaFfie Ken Mannon Date APPROVED BY: APPROVED BY: cc: City Clerk Contractor Engineer Mark Name Barb Brock If over $60,000 - Purchasing Director Project File Purchasing 3/./d- Date ,3 3 /� Date CHANGE ORDER NO. 7 PROJECT TRLE: Nix Farm - New Office adding CONTRACTOR: Heath Construction PROJECT NUMBER: OP-449315 DESCRIPTION: Nix Farm - New Omce Bullft Fort Collins in Preparing change orders show In order as separate numbered paragraphs the folowing: . 1. Reason for change: A Change In scope Per the attached change order We 7. 9, 9.10, a 12. • 2. Description of change -Added Chair rail, nd heeler, dledrical dh mM. etc. 3. Change In contract cost: Yee for Heath Constructan dwMa order's 7, B. 9.10. & 12. No for west aY• 4. Change In contract time: Yea. Weather delays that will add 3 Calendar days per Heath letter doled (Attach additional sheets as required) ORIGINAL CONTRACT COST $1,240497.00 TOTAL APPROVED CHANGE ORDERS -M.4p'03 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER 027% Total C.O. a% of Original Contract -1.54% ADJUSTED CONTRACT COST Sl=,490.05 (Assurdna all chance orrde^^►►rsaaoroved) I ACCEPTED BY: (,,. ,, I — Contntrraact�or's�Represenledve David Stdle Dale ACCEPTED BY• z�7 �1 — Project Man Ethan Q= m Dat4 h REVIEWED BY: aXg. '� A� Ken Mennon Date �Lzc✓�—� ESL APPROVED BY' `// r+�U taint N M//arkem Se Dot Mh - / f� `� 3 APPROVED BY' Prkd Name Barb Brad( Date if aver SM.000- Pmdwft Director CRY ask Project Re Corrector Plar:laeing Engineer