HomeMy WebLinkAboutCHANGE ORDER - BID - 7543 NEW OFFICE BUILDING AT NIX FARM NATURAL AREAS FACILITY (2)IJ;�e1tL��irrl��
e ► F1G.*y
CHANGE ORDER NO. 2
Nix Farm - New Office
Heath Construction
PROJECTNUMBER: OP-449315 7239 a
DESCRIPTION: New Office Building
City of
F6rt Collins
In preparing change orders show in order as separate numbered paragraphs the following:
1. Reason for change: LO
2. Description of change•
3. Change in contract cost:
to the
5 - 2" trees & 77 - #5
4. Change in contract time: Yes. Weather
(Attach additional sheets as_ required)
#1
will add 9 calendar
rey COR #1 dated
als and 1.5" river rock in
Heath letter dated
ORIGINAL CONTRACT COST
$1,240,597.00
TOTAL APPROVED CHANGE ORDERS
-$11,014.00
TOTAL PENDING CHANGE ORDERS
$0.00
TOTAL THIS CHANGE ORDER
-$681.75
TOTAL % OF THIS CHANGE ORDER
-0.05%
Total C.O. % of Original Contract
-0•94%
ADJUSTED CONTRACT COST
$1,228,901.25
(Assuming all chance orders approved)
ACCEPTED BY:
Contractor's Representative David Stolle
ACCEPTED BY:
Project
REVIEWED BY:
APPROVED BY:
Ken Mannon
Sears
Coaens
APPROVED BY: fy/N t /✓/uf.1 t vim -
Print Name Barb Brock
If over $60,000 - Purchasing Director
cc: City Clerk Project File
Contractor Purchasing
Engineer
I I'Zl 1 N
Date
Date
7
Date
s
Date
33 /
Dat
CHANGE ORDER NO. 3
PROJECT TITLE: Nix Farm - New Office Building
CONTRACTOR: Heath Construction
PROJECT NUMBER: oP-449315
DESCRIPTION: Nix Farm - New Office Building
.Fort Collins
In preparing change orders show in order as separate numbered paragraphs the following:
Reason for change: Air barrier design changes per Adler -Lingle -Massey CDR #2 dated 12/24/13.
2. Description of char
3. Change in contract
-Deletion of fluid smiled air barrier and the addition of We on all rigid insulation
4. Change in contract time: No.
(Attach additional sheets as required)
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
Total C.O. % of Original Contract
ADJUSTED CONTRACT COST
ACCEPTED BY:
ACCEPTED BY:
REVIEWED BY
$1,240,597.00
-$11,014.00
-$681.75
$2,128.07
-0.17%
-1.11 %
Representative David stolte
Ethan Coaens
$1,226,773.18
j IzI 1
Date
[Yale '
C'
Print Na 8 Ken Mannon Date
i
APPROVED BY:
Print N Mark
APPROVED BY �)
Barb Brock
If over $50,000 - Purchasing Director
cc: City Clerk Project File
Contractor Purchasing
Engineer
Vs/ 14-
Date
,j3,3 /
Date
CHANGE ORDER NO. 4
PROJECT TITLE: Nix Farm - New Office Building
CONTRACTOR: Heath Construction
PROJECT NUMBER. OP-449315
DESCRIPTION: Nix Farm - New Office Building
Fort Collins
In preparing change orders show in order as separate numbered paragraphs the following:
Reason for change: Interior door glass change per Aller-Lingle-Massey COR #3 dated 1215113.
2. Description of change:Revthe Interior wood door from 1/4" tempered frosted glass to 114" tempered
ealser g ass.
3. Change in contract cost: Yes.
4. Change in contract time: No.
(Attach additional sheets as required)
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS.
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
Total C.O. % of Original Contract
ADJUSTED CONTRACT COST
ACCEPTED BY:
ACCEPTED BY:
REVIEWED BY:
APPROVED BY:
$1,240.597.00
-$11,014.00
-$2,809.82
1.52
-0.08%
-1.19%
David Stolte
Project Managef Ethan Coaens
Ken Mannon
Mark Sears
APPROVED BY,• v w
Print ame Barb erode
If over $60,000 - Purchasing Director
cc: City Clerk Project File
Contractor Purchasing
Engineer
$1,225,811.66
L )
Date
Date —
Dale rz
3 /¢-
Date
3 /
Dat
CHANGE ORDER NO. 5
PROJECT TITLE:
Nix Farm - New Office Building
CONTRACTOR:
Heath Construction
PROJECT NUMBER:
OP-449315
DESCRIPTION:
Nix Farm - New Office Building
Fort Collins
In preparing change orders show in order as separate numbered paragraphs the following:
Reason for change: Deletion of two drilled wells per Aller-Lingle-Massey CDR #5 dated 12/24/13.
2. Description of change -Delete two boreholes for the geothermal system. The system had six holes and
now will haVe 4.
3. Change in contract cost: Yes.
4. Change in contract time: No.
(Attach additional sheets as required)
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER -0•64%
Total C.O. % of Original Contract -1.84%
ADJUSTED CONTRACT COST
(Assurnim all char ge orders =rovedli
$1240,597.00
-$11,014.00
-$3,771.34
48,000.00.
$1,217,811.66
Lt 1
ACCEPTED BY:
Contractors Representative David state
Date
ACCEPTED BY:
Project Manag Ethan Coaens
Date
REVIEWED BY:
Print NaAle Ken Mannon
Date
APPROVED BY:
1¢
Print if Marks rs
Date
APPROVED BY`
,L
Prin Name Barb Brock
Date
If over $60,000 - Purchasing Director
W. City Clerk Project File
Contractor Purchasing
Engineer
CHANGE ORDER NO. 6 City Of
PROJECT TITLE: Nlx Farm - New Office Building C �t COIFS
CONTRACTOR: Heath Construction
PROJECT NUMBER: OP-449315
DESCRIPTION: Nix Farm - New Office Building
In preparing change orders show in order as separate numbered paragraphs the following:
1, Reason for change: Fur Interior walls to provide space for HVAC retums per Aller-Lingle-Massey COR
2. Description of change:Add 2x3 furring in two interior wan locations per COR #6.
3. Change in contract cost: Yes.
4. Change in contract time: No.
(Attach additional sheets as required)
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
Total C.O. % of Original Contract
ADJUSTED CONTRACT COST
ACCEPTED BY.
ACCEPTED BY:
Manager
REVIEWED BY:
0.03%
-1.81 %
David Stolte
$1.240,597.00
-$11,014.00
-$11,771.34
5.31
$1.218.166.97
(lz, I ►4
Date
Date I
Print NaFfie Ken Mannon Date
APPROVED BY:
APPROVED BY:
cc: City Clerk
Contractor
Engineer
Mark
Name Barb Brock
If over $60,000 - Purchasing Director
Project File
Purchasing
3/./d-
Date
,3 3 /�
Date
CHANGE ORDER NO. 7
PROJECT TRLE: Nix Farm - New Office adding
CONTRACTOR: Heath Construction
PROJECT NUMBER: OP-449315
DESCRIPTION: Nix Farm - New Omce Bullft
Fort Collins
in Preparing change orders show In order as separate numbered paragraphs the folowing: .
1. Reason for change: A Change In scope Per the attached change order We 7. 9, 9.10, a 12. •
2. Description of change -Added Chair rail, nd heeler, dledrical dh mM. etc.
3. Change In contract cost: Yee for Heath Constructan dwMa order's 7, B. 9.10. & 12. No for west
aY•
4. Change In contract time: Yea. Weather delays that will add 3 Calendar days per Heath letter doled
(Attach additional sheets as required)
ORIGINAL CONTRACT COST
$1,240497.00
TOTAL APPROVED CHANGE ORDERS
-M.4p'03
TOTAL PENDING CHANGE ORDERS
$0.00
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
027%
Total C.O. a% of Original Contract
-1.54%
ADJUSTED CONTRACT COST
Sl=,490.05
(Assurdna all chance orrde^^►►rsaaoroved)
I
ACCEPTED BY: (,,.
,,
I —
Contntrraact�or's�Represenledve David Stdle
Dale
ACCEPTED BY•
z�7 �1 —
Project Man Ethan Q= m
Dat4 h
REVIEWED BY:
aXg. '�
A�
Ken Mennon
Date
�Lzc✓�—�
ESL
APPROVED BY' `//
r+�U
taint N
M//arkem Se
Dot
Mh
- /
f�
`� 3
APPROVED BY'
Prkd Name
Barb Brad(
Date
if aver SM.000- Pmdwft Director
CRY ask
Project Re
Corrector
Plar:laeing
Engineer