Loading...
HomeMy WebLinkAboutRFP - 7334 DIGITAL DOME THEATER FOR DISCOVERY MUSEUM (4)REQUEST FOR PROPOSAL 7334 DIGITAL DOME THEATER FOR DISCOVERY MUSEUM The City of Fort Collins is requesting proposals from qualified firms to design, engineer, deliver, and support an integrated solution for a 36’ diameter digital dome theater as part of the new Fort Collins Museum of Discovery. Written proposals, five (5) copies, will be received at the City of Fort Collins' Purchasing Division, 215 North Mason St., 2nd floor, Fort Collins, Colorado 80524. Proposals will be received before 3:00 p.m. (our clock), February 23, 2012 and referenced as Proposal No. 7334. If delivered, they are to be sent to 215 North Mason Street, 2nd Floor, Fort Collins, Colorado 80524. If mailed, the address is P.O. Box 580, Fort Collins, 80522-0580. Questions concerning the scope of the project should be directed to Project Manager, Terry Burton, Digital Media Coordinator for Fort Collins Museum of Discovery, at tburton@fcgov.com. Questions regarding bid submittal or process should be directed to John Stephen, CPPO, LEED AP, Senior Buyer, at (970) 221-6777 or jstephen@fcgov.com. A copy of the Proposal may be obtained as follows: 1. Download the Proposal/Bid from the BuySpeed Webpage, www.fcgov.com/eprocurement The City of Fort Collins is subject to public information laws, which permit access to most records and documents. Proprietary information in your response must be clearly identified and will be protected to the extent legally permissible. Proposals may not be marked ‘Proprietary’ in their entirety. Information considered proprietary is limited to material treated as confidential in the normal conduct of business, trade secrets, discount information, and individual product or service pricing. Summary price information may not be designated as proprietary as such information may be carried forward into other public documents. All provisions of any contract resulting from this request for proposal will be public information. Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision-making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing Collusive or sham proposals: Any proposal deemed to be collusive or a sham proposal will be rejected and reported to authorities as such. Your authorized signature of this proposal assures that such proposal is genuine and is not a collusive or sham proposal. The City of Fort Collins reserves the right to reject any and all proposals and to waive any irregularities or informalities. Sincerely, James B. O'Neill II, CPPO, FNIGP Director of Purchasing & Risk Management 7334 DIGITAL DOME THEATER FOR DISCOVERY MUSEUM SCOPE OF WORK To design, engineer, deliver, and support an integrated solution for a 36’ diameter digital dome theater as part of the new Fort Collins Museum of Discovery. The solution must:  Be flexible, easy to use, and provide the ability to grow as our needs expand.  Allow us to show pre-rendered content, present real-time astronomy and earth science programs, develop our own content, and connect to other domes for live events.  Include on-site technical support available in a short time frame.  Work with donated equipment from Hewlett-Packard and NVIDIA.  Fit within the existing physical infrastructure in the new museum building. The solution is to be delivered in the following phases: 1. Phase One Dome screen manufacture and complete installation  Dome screen reflectance to be optimized to match visual display system  Theater space designed for a 36’, 162-degree screen  Installed at a 20 degree tilt  Management of sub-contractor for dome screen manufacture 2. Phase Two Visual display system engineering and complete installation  Commercial grade, high duty cycle projector array for a standard 4K x 4K dome master, engineered to optimize luminance, pixel count, and pixel uniformity for a 36’, 162-degree dome  Perimeter projector installation  Functionality to support the playback of pre-rendered movies, real-time astronomy and earth science applications, and live presentations on-site or networked to other domes  Media server RAID array, rack, and wiring. Minimally: - Capable of video playback at 30 fps, 8 bit, SXGA+ resolution per channel without dropping frames - Video streaming with uncompressed (4:2:2) or lossless compression - Storage and editing capabilities - PC for administrator interface - Rack with monitor, keyboard, and cabling - Software licenses for audio system, operating system, and defrag  Theater automation control system with graphical user interface, including a wireless theater control device  Media production and playback software with graphical user interface  Real-time astronomy and earth science software  Six channel 5.1 surround audio system, cables, and interface to theater control system  LED cove lighting system and interface to theater control system  Labor, including - Installation and test of all deliverable systems and components - Management of hardware and software purchasing - Management of shipping and documentation - Commissioning of delivered system - Training for system operation and routine maintenance - Training for theater control system, media production and playback software, and real-time software packages  Documentation, including - Mechanical and electronic interface with facility systems - Electronics block diagram - Operation and maintenance manual  Minimum of a one year warranty on all system components on a repair or replacement basis. 3. Phase Three  Maintenance package  Pre-rendered content licenses for three shows 4. Proposal Submittal The City of Fort Collins shall not reimburse any firm for the cost incurred in the preparation and presentation of their proposal. Firms submitting proposals shall submit the proposal with the following information a. The name of the company and the individual who will oversee the contract. Please provide resumes for the company owner; and project manager and on site installers that will be assigned to the City project. b. References from three or more current or past clients, which have used this firm for similar services, including a current contact name, current telephone number and mailing address. Please note that in submitting this proposal you are authorizing the City of Fort Collins to contact any and all prior clients. c. Describe what resources you would expect (if any) the City staff to provide. d. Please provide a complete cost for each phase. e. The proposal must be signed by a duly authorized representative of the firm submitting the proposal. The signature shall include the title of the individual signing the proposal. REVIEW AND ASSESSMENT Professional firms will be evaluated on the following criteria. These criteria will be the basis for review of the written proposals and optional interview session. At discretion of the City, interviews of top rated firms may be held. The rating scale shall be from 1 to 5, with 1 being a poor rating, 3 being an average rating, and 5 being an outstanding rating. WEIGHTING FACTOR QUALIFICATION STANDARD 2.0 Scope of Proposal Does the proposal show an understanding of the project objective, methodology to be used and results that are desired from the project? 2.0 Assigned Personnel Do the persons who will be working on the project have the necessary skills? Are sufficient people of the requisite skills assigned to the project? 1.0 Availability Can the work be completed in the necessary time? Can the target start and completion dates be met? Are other qualified personnel available to assist in meeting the project schedule if required? Is the project team available to attend meetings as required by the Scope of Work? 1.0 Motivation Is the firm interested and are they capable of doing the work in the required time frame? 2.0 Cost and Work Hours Do the proposed cost and work hours compare favorably with the project Manager's estimate? Are the work hours presented reasonable for the effort required in each project task or phase? 2.0 Firm Capability Does the firm have the support capabilities the assigned personnel require? Has the firm done previous projects of this type and scope? REFERENCE EVALUATION (TOP RATED FIRM) The project Manager will check references using the following criteria. The evaluation rankings will be labeled Satisfactory/Unsatisfactory. QUALIFICATION STANDARD Overall Performance Would you hire this Professional again? Did they show the skills required by this project? Timetable Was the original Scope of Work completed within the specified time? Were interim deadlines met in a timely manner? Completeness Was the Professional responsive to client needs; did the Professional anticipate problems? Were problems solved quickly and effectively? Budget Was the original Scope of Work completed within the project budget? Job Knowledge a) If a study, did it meet the Scope of Work? b) If Professional administered a construction contract, was the project functional upon completion and did it operate properly? Were problems corrected quickly and effectively? SERVICES AGREEMENT THIS AGREEMENT made and entered into the day and year set forth below by and between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred to as the "City" and , hereinafter referred to as "Service Provider". WITNESSETH: In consideration of the mutual covenants and obligations herein expressed, it is agreed by and between the parties hereto as follows: 1. Scope of Services. The Service Provider agrees to provide services in accordance with the scope of services attached hereto as Exhibit "A", consisting of ( ) page and incorporated herein by this reference. 2. The Work Schedule. [Optional] The services to be performed pursuant to this Agreement shall be performed in accordance with the Work Schedule attached hereto as Exhibit "B", consisting of ( ) page , and incorporated herein by this reference. 3. Time of Commencement and Completion of Services. The services to be performed pursuant to this Agreement shall be initiated within ( ) days following execution of this Agreement. Services shall be completed no later than . Time is of the essence. Any extensions of the time limit set forth above must be agreed upon in a writing signed by the parties. 4. Contract Period. [Option 1] This Agreement shall commence upon the date of execution shown on the signature page of this Agreement and shall continue in full force and effect for one (1) year, unless sooner terminated as herein provided. In addition, at the option of the City, the Agreement may be extended for an additional period of one (1) year at the rates provided with written notice to the Professional mailed no later than ninety (90) days prior to contract end. 5. Contract Period. [Option 2] This Agreement shall commence , 200 , and shall continue in full force and effect until , 200 , unless sooner terminated as herein provided. In addition, at the option of the City, the Agreement may be extended for additional one year periods not to exceed ( ) additional one year periods. Renewals and pricing changes shall be negotiated by and agreed to by both parties. The Denver Boulder Greeley CPIU published by the Colorado State Planning and Budget Office will be used as a guide. Written notice of renewal shall be provided to the Service Provider and mailed no later than ninety (90) days prior to contract end. 6. Delay. If either party is prevented in whole or in part from performing its obligations by unforeseeable causes beyond its reasonable control and without its fault or negligence, then the party so prevented shall be excused from whatever performance is prevented by such cause. To the extent that the performance is actually prevented, the Service Provider must provide written notice to the City of such condition within fifteen (15) days from the onset of such condition. [Early Termination clause here as an option 7. Early Termination by City/Notice. Notwithstanding the time periods contained herein, the City may terminate this Agreement at any time without cause by providing written notice of termination to the Service Provider. Such notice shall be delivered at least fifteen (15) days prior to the termination date contained in said notice unless otherwise agreed in writing by the parties. All notices provided under this Agreement shall be effective when mailed, postage prepaid and sent to the following addresses: City: City of Fort Collins Attn: Purchasing PO Box 580 Fort Collins, CO 80522 Copy to: City of Fort Collins Attn: PO Box 580 Fort Collins, CO 80522 Service Provider: In the event of early termination by the City, the Service Provider shall be paid for services rendered to the date of termination, subject only to the satisfactory performance of the Service Provider's obligations under this Agreement. Such payment shall be the Service Provider's sole right and remedy for such termination. 8. Contract Sum. The City shall pay the Service provider for the performance of this Contract, subject to additions and deletions provided herein, per the attached Exhibit " ", consisting of page , and incorporated herein by this reference. 9. City Representative. The City will designate, prior to commencement of the work, its representative who shall make, within the scope of his or her authority, all necessary and proper decisions with reference to the services provided under this agreement. All requests concerning this agreement shall be directed to the City Representative. 10. Independent Service provider. The services to be performed by Service Provider are those of an independent service provider and not of an employee of the City of Fort Collins. The City shall not be responsible for withholding any portion of Service Provider's compensation hereunder for the payment of FICA, Workmen's Compensation or other taxes or benefits or for any other purpose. 11. Personal Services. It is understood that the City enters into the Agreement based on the special abilities of the Service Provider and that this Agreement shall be considered as an agreement for personal services. Accordingly, the Service Provider shall neither assign any responsibilities nor delegate any duties arising under the Agreement without the prior written consent of the City. 12. Acceptance Not Waiver. The City's approval or acceptance of, or payment for any of the services shall not be construed to operate as a waiver of any rights or benefits provided to the City under this Agreement or cause of action arising out of performance of this Agreement. 13. Warranty. a. Service Provider warrants that all work performed hereunder shall be performed with the highest degree of competence and care in accordance with accepted standards for work of a similar nature. b. Unless otherwise provided in the Agreement, all materials and equipment incorporated into any work shall be new and, where not specified, of the most suitable grade of their respective kinds for their intended use, and all workmanship shall be acceptable to City. c. Service Provider warrants all equipment, materials, labor and other work, provided under this Agreement, except City-furnished materials, equipment and labor, against defects and nonconformances in design, materials and workmanship/workwomanship for a period beginning with the start of the work and ending twelve (12) months from and after final acceptance under the Agreement, regardless whether the same were furnished or performed by Service Provider or by any of its subcontractors of any tier. Upon receipt of written notice from City of any such defect or nonconformances, the affected item or part thereof shall be redesigned, repaired or replaced by Service Provider in a manner and at a time acceptable to City. 14. Default. Each and every term and condition hereof shall be deemed to be a material element of this Agreement. In the event either party should fail or refuse to perform according to the terms of this agreement, such party may be declared in default thereof. 15. Remedies. In the event a party has been declared in default, such defaulting party shall be allowed a period of ten (10) days within which to cure said default. In the event the default remains uncorrected, the party declaring default may elect to (a) terminate the Agreement and seek damages; (b) treat the Agreement as continuing and require specific performance; or (c) avail himself of any other remedy at law or equity. If the non-defaulting party commences legal or equitable actions against the defaulting party, the defaulting party shall be liable to the non-defaulting party for the non-defaulting party's reasonable attorney fees and costs incurred because of the default. 16. Binding Effect. This writing, together with the exhibits hereto, constitutes the entire agreement between the parties and shall be binding upon said parties, their officers, employees, agents and assigns and shall inure to the benefit of the respective survivors, heirs, personal representatives, successors and assigns of said parties. 17. Indemnity/Insurance. a. The Service Provider agrees to indemnify and save harmless the City, its officers, agents and employees against and from any and all actions, suits, claims, demands or liability of any character whatsoever brought or asserted for injuries to or death of any person or persons, or damages to property arising out of, result from or occurring in connection with the performance of any service hereunder. b. The Service Provider shall take all necessary precautions in performing the work hereunder to prevent injury to persons and property. c. Without limiting any of the Service Provider's obligations hereunder, the Service Provider shall provide and maintain insurance coverage naming the City as an additional insured under this Agreement of the type and with the limits specified within Exhibit , consisting of one (1) page, attached hereto and incorporated herein by this reference. The Service Provider before commencing services hereunder, shall deliver to the City's Director of Purchasing and Risk Management, P. O. Box 580 Fort Collins, Colorado 80522 one copy of a certificate evidencing the insurance coverage required from an insurance company acceptable to the City. 18. Entire Agreement. This Agreement, along with all Exhibits and other documents incorporated herein, shall constitute the entire Agreement of the parties. Covenants or representations not contained in this Agreement shall not be binding on the parties. 19. Law/Severability. The laws of the State of Colorado shall govern the construction interpretation, execution and enforcement of this Agreement. In the event any provision of this Agreement shall be held invalid or unenforceable by any court of competent jurisdiction, such holding shall not invalidate or render unenforceable any other provision of this Agreement. 20. Prohibition Against Employing Illegal Aliens. Pursuant to Section 8-17.5-101, C.R.S., et. seq., Service Provider represents and agrees that: a. As of the date of this Agreement: 1. Service Provider does not knowingly employ or contract with an illegal alien who will perform work under this Agreement; and 2. Service Provider will participate in either the e-Verify program created in Public Law 208, 104th Congress, as amended, and expanded in Public Law 156, 108th Congress, as amended, administered by the United States Department of Homeland Security (the “e-Verify Program”) or the Department Program (the “Department Program”), an employment verification program established pursuant to Section 8-17.5-102(5)(c) C.R.S. in order to confirm the employment eligibility of all newly hired employees to perform work under this Agreement. b. Service Provider shall not knowingly employ or contract with an illegal alien to perform work under this Agreement or knowingly enter into a contract with a subcontractor that knowingly employs or contracts with an illegal alien to perform work under this Agreement. c. Service Provider is prohibited from using the e-Verify Program or Department Program procedures to undertake pre-employment screening of job applicants while this Agreement is being performed. d. If Service Provider obtains actual knowledge that a subcontractor performing work under this Agreement knowingly employs or contracts with an illegal alien, Service Provider shall: 1. Notify such subcontractor and the City within three days that Service Provider has actual knowledge that the subcontractor is employing or contracting with an illegal alien; and 2. Terminate the subcontract with the subcontractor if within three days of receiving the notice required pursuant to this section the subcontractor does not cease employing or contracting with the illegal alien; except that Service Provider shall not terminate the contract with the subcontractor if during such three days the subcontractor provides information to establish that the subcontractor has not knowingly employed or contracted with an illegal alien. e. Service Provider shall comply with any reasonable request by the Colorado Department of Labor and Employment (the “Department”) made in the course of an investigation that the Department undertakes or is undertaking pursuant to the authority established in Subsection 8-17.5-102 (5), C.R.S. f. If Service Provider violates any provision of this Agreement pertaining to the duties imposed by Subsection 8-17.5-102, C.R.S. the City may terminate this Agreement. If this Agreement is so terminated, Service Provider shall be liable for actual and consequential damages to the City arising out of Service Provider’s violation of Subsection 8-17.5-102, C.R.S. g. The City will notify the Office of the Secretary of State if Service Provider violates this provision of this Agreement and the City terminates the Agreement for such breach. 21. Special Provisions. [Optional] Special provisions or conditions relating to the services to be performed pursuant to this Agreement are set forth in Exhibit " ", consisting of ( ) pages, attached hereto and incorporated herein by this reference. CITY OF FORT COLLINS, COLORADO a municipal corporation By:_______________________________ James B. O'Neill II, CPPO, FNIGP Director of Purchasing and Risk Management Date:_____________________________ ATTEST: _________________________________ City Clerk APPROVED AS TO FORM: ________________________________ Assistant City Attorney By:_______________________________ __________________________________ PRINT NAME __________________________________ CORPORATE PRESIDENT OR VICE PRESIDENT Date:_____________________________ ATTEST: (Corporate Seal) _____________________________ CORPORATE SECRETARY EXHIBIT “ ” INSURANCE REQUIREMENTS 1. The Service Provider will provide, from insurance companies acceptable to the City, the insurance coverage designated hereinafter and pay all costs. Before commencing work under this bid, the Service Provider shall furnish the City with certificates of insurance showing the type, amount, class of operations covered, effective dates and date of expiration of policies, and containing substantially the following statement: "The insurance evidenced by this Certificate will not be cancelled or materially altered, except after ten (10) days written notice has been received by the City of Fort Collins." In case of the breach of any provision of the Insurance Requirements, the City, at its option, may take out and maintain, at the expense of the Service Provider, such insurance as the City may deem proper and may deduct the cost of such insurance from any monies which may be due or become due the Service Provider under this Agreement. The City, its officers, agents and employees shall be named as additional insureds on the Service Provider's general liability and automobile liability insurance policies for any claims arising out of work performed under this Agreement. 2. Insurance coverages shall be as follows: A. Workers' Compensation & Employer's Liability. The Service Provider shall maintain during the life of this Agreement for all of the Service Provider's employees engaged in work performed under this agreement: 1. Workers' Compensation insurance with statutory limits as required by Colorado law. 2. Employer's Liability insurance with limits of $100,000 per accident, $500,000 disease aggregate, and $100,000 disease each employee. B. Commercial General & Vehicle Liability. The Service Provider shall maintain during the life of this Agreement such commercial general liability and automobile liability insurance as will provide coverage for damage claims of personal injury, including accidental death, as well as for claims for property damage, which may arise directly or indirectly from the performance of work under this Agreement. Coverage for property damage shall be on a "broad form" basis. The amount of insurance for each coverage, Commercial General and Vehicle, shall not be less than $500,000 combined single limits for bodily injury and property damage. In the event any work is performed by a subcontractor, the Service Provider shall be responsible for any liability directly or indirectly arising out of the work performed under this Agreement by a subcontractor, which liability is not covered by the subcontractor's insurance. DN DN REF. DW REF. DW DN DN DN DN REF.DW DN DN UP UP 33" Four Inch Flange Diameter J J J J J J J J J J J J J J DN E 1 21 2 21 3 21 4 21 5 21 6 21 7 20 8 20 E E 16 21 15 21 14 21 13 21 12 21 11 21 DN DN UP UP 33" Four Inch Flange Diameter OS J J J J J J J J J J J J J J OS T CO² T DN D C B 7 8 9 1 A4.2.1 A6.2.2 4 226 SF CONFERENCE ROOM LOBBY 301A 1 A4.2.2 A6.2.1 4 A6.1.1 3 301A 301D 2,721 SF ROOF DECK 302 A4.1.3 1 A4.1.3 9 A4.1.3 10 A4.1.3 11 T.O. SLAB @ PARAPET T.O PARAPET PARAPET SLOPES UP 6 LOBBY FFE 100' - 0" UPPER ROOF 144' - 0" A B C D E F G GALLERY FFE 97' - 0" STRUCTURAL MEZZANINE 114' - 7" 115' - 0" 1 A4.2.1 4" / 12" T.O. PARAPET 120' - 0" A5.1.1 1 Sim COLLECTION STORAGE 128 GALLERY 126 114' - 11" T.O. UPPER PARAPET 147' - 7" 1 A9.2.3 H 1 RFI 0197 A1 LOBBY FFE 100' - 0" UPPER ROOF 144' - 0" 2 3 4 5 6 7 8 9 10 GALLERY FFE 97' - 0" STRUCTURAL MEZZANINE 114' - 7" 14' - 7" 2 7/16" / 12" A9.0.1 7 T.O. PARAPET 120' - 0" A5.1.1 3 Sim COLLECTION STORAGE 128 TRAVELING EXHIBITS 127 ARTIFACT PROCESSING LOBBY FFE 100' - 0" UPPER ROOF 144' - 0" GALLERY FFE 97' - 0" STRUCTURAL MEZZANINE 114' - 7" LOBBY 100 T.O. PARAPET 120' - 0" DOME M02 VEST 101A 114' - 1 3/4" T.O. UPPER PARAPET 147' - 7" A9.2.1 3 A5.1.2 2 PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS © OZ ARCHITECTURE SCALE: SHEET NUMBER SHEET TITLE: ISSUED FOR: APPROVED: 1805 29th Street Suite 2054 Boulder, Colorado 80301 phone 303.449.8900 UPDATED CONSTRUCTION DOCUMENT SET 03/25/11 408 MASON COURT, FORT COLLINS, CO 80524 3/25/2011 9:24:37 AM C:\Users\jlevy\Desktop\DISCOVERY MUSEUM REVIT\809001-FT COLLINS MUSEUM-jlevy local032211.rvt 1/8" = 1'-0" FORT COLLINS DISCOVERY MUSEUM 809001.00 JPL/KG PS/DS 8/18/10 FINAL CONSTRUCTION DOCUMENTS BUILDING SECTIONS A4.2.2 FORT COLLINS DISCOVERY MUSEUM DS 1 1/8" = 1'-0" SECTION - DIAGONAL LOBBY FFE 100' - 0" UPPER ROOF 144' - 0" GALLERY FFE 97' - 0" STRUCTURAL MEZZANINE 114' - 7" DOME COORDINATION IN PROGRESS W21X73 A9.2.1 6 9' - 0" OVERFRAME MEZZANINE 119' - 7" T.O. UPPER PARAPET 147' - 7" A9.2.1 2 LOBBY FFE 100' - 0" UPPER ROOF 144' - 0" GALLERY FFE 97' - 0" STRUCTURAL MEZZANINE 114' - 7" DOME COORDINATION IN PROGRESS A9.2.1 6 OH 17.00° OVERFRAME MEZZANINE 119' - 7" T.O. UPPER PARAPET 147' - 7" A9.2.1 2 PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS © OZ ARCHITECTURE SCALE: SHEET NUMBER SHEET TITLE: ISSUED FOR: APPROVED: 1805 29th Street Suite 2054 Boulder, Colorado 80301 J J J J J J J J J J J J J J E 1 21 2 21 3 21 4 21 5 21 6 21 7 20 8 20 E E 16 21 15 21 14 21 13 21 12 21 11 21 10 20 9 20 D 1 21 2 21 3 21 4 21 5 21 6 UPPER ROOF 144' - 0" STRUCTURAL MEZZANINE 114' - 7" 1 A5.2.9 OVERFRAME MEZZANINE 119' - 7" A7.4 6 A7.4 7 STRUCTURAL MEZZANINE 114' - 7" OVERFRAME MEZZANINE 119' - 7" UPPER ROOF 144' - 0" STRUCTURAL MEZZANINE 114' - 7" 1 A5.2.9 OVERFRAME MEZZANINE 119' - 7" A7.4 7 A7.4 6 STRUCTURAL MEZZANINE 114' - 7" OVERFRAME MEZZANINE 119' - 7" 4" BLACK FIBERGLASS ON ALL INTERIOR WALLS AND CEILING SURFACES OF THE DOME CYLINDER BEHIND THE PROJECTION SCREEN TYP. A7.4 8 C 8 A7.4 3 2 4 1 19' - 0" 1" FABRIC WRAPPED ACOUSTICAL PANELS 1" FABRIC WRAPPED ACOUSTICAL PANELS 7 DN DN UP UP 33" Four Inch Flange Diameter J J J J J J J J J J J J J J DN E 1 21 2 21 3 21 4 21 5 21 6 21 7 20 8 20 E E 16 21 15 21 14 21 13 21 12 21 11 21 10 20 9 20 D 1 21 2 21 3 21 4 21 5 21 6 21 7 21 8 20 D 15 21 14 21 13 21 12 21 11 21 10 21 9 21 25'-7" C 1 21 2 21 3 21 4 21 5 20 6 20 7 20 8 20 C 15 21 14 21 13 21 12 21 11 20 10 20 9 20 1 21 2 21 3 21 4 21 5 21 6 21 7 20 8 20 9 20 15 21 14 21 13 21 12 2 1 11 21 10 21 8 21 9 21 10 21 11 21 12 21 13 21 14 21 A 7 21 6 21 5 21 4 21 3 21 2 21 1 21 A F 1 20 2 20 2-20 6 20 7 20 2-20 11 20 12 20 F 2-20 3 20M 4 20M 5 20M 8 20M 9 20M 10 20M 3-20(MB) WC WC WC WC 14-21 8-21,7-20 14-21,1-20 B 12-21,3-20 12-21,4-20 3-20(MB) D C B 7 8 9 CONFERENCE ROOM LOBBY 301A ROOF DECK 302 CONFERENCE ROOM 301B CPT-3 CPT-3 1. SEE SHEET _____ FOR FINISH LEGEND. 2. SEE INTERIOR ELEVATIONS AND REFLECTED CEILING PLANS FOR ADDITIONAL FINISH INFORMATION. 3. SEE SHEET 12 / A9.5.2 FOR FLOOR TRANSITION DETAILS. 4. FLOOR MATERIAL TRANSITIONS SHALL OCCUR AT THE CENTERLINE OF DOOR UNLESS OTHERWISE NOTED. 5. PROVIDE A FINE ORANGE PEEL TEXTURE AT ALL WALLS AND CEILINGS TO BE PAINTED. 6. ALL PAINT TRANSITIONS TO OCCUR AT INSIDE CORNERS UNLESS OTHERWISE NOTED. 7. PAINT ALL WALLS P____ UNLESS OTHERWISE NOTED. 8. PAINT ALL COLUMNS AND PILASTERS P____ UNLESS OTHERWISE NOTED. 9. PAINT ALL GYPSUM BOARD CEILINGS P____. U.O.N. 10. PAINT ALL EXPOSED CEILING STRUCTURE & DUCTWORK P___. U.O.N. 11. PAINT ALL DOOR FRAMES P___. U.O.N. 12. PAINT ALL EXPOSED STEEL OR WOOD (UNLESS NOTED OTHERWISE). 13. PAINT EXPOSED CONDUIT AND PIPES TO MATCH ADJACENT FINISHES. 14. SEAM SEALER REQUIRED AT ALL CARPET SEAMS IN ACCORDANCE WITH THE CARPETING INSTALLATION INSTRUCTIONS. 15. ALL CARPET TO BE CPT____ UNLESS OTHERWISE NOTED. 16. PROVIDE RUBBER COVE BASE RB_____ AT ALL AREAS UNLESS OTHERWISE NOTED. 17. PROVIDE SMOOTH FINISH AT ALL WALLS TO RECEIVE WALLCOVERINGS PER THE MANUFACTURER'S INSTRUCTIONS. 18. WRAP ALL COVERPLATES AND SWITCHES WITH WALL COVERING IN ROOMS WHERE WALLCOVERING OCCURS. 19. DO NOT PROVIDE RUBBER/VINYL BASE ON MILLWORK. PROVIDE PLASTIC LAMINATE AT MILLWORK TOE-KICKS. REFER TO MILLWORK SECTIONS AND DETAILS. 20. PAINT ALL PLYWOOD BACKBOARDS TO MATCH THE ADJACENT WALL COLOR. FINISH PLAN NOTES D C B A 7 8 9 19' - 0" MEZZ M01 DOME M02 STORAGE M04 SERVER ROOM M03 CPT-3 CPT-3 ? CPT-3 CPT-4 4 PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS © OZ ARCHITECTURE SCALE: SHEET NUMBER SHEET TITLE: ISSUED FOR: APPROVED: 1805 29th Street Suite 2054 Boulder, Colorado 80301 phone 303.449.8900 UPDATED CONSTRUCTION DOCUMENT SET 03/25/11 408 MASON COURT, FORT COLLINS, CO 80524 3/25/2011 9:34:24 AM C:\Users\jlevy\Desktop\DISCOVERY MUSEUM REVIT\809001-FT COLLINS MUSEUM-jlevy local032211.rvt As indicated FORT COLLINS DISCOVERY MUSEUM 809001.00 JPL/KG PS/DS 8/18/10 FINAL CONSTRUCTION DOCUMENTS MEZZANINE AND ROOF DECK FINSIHES A11.2 FORT COLLINS DISCOVERY MUSEUM DS 1 1/8" = 1'-0" ROOF DECK PLAN - FINISHES 2 1/8" = 1'-0" MEZZANINE PLAN - FINISHES A7.4 8 A7.4 A7.4 10 11 A7.4 9 Sim 104 2 A5.1.2 TYP. 1' - 5" TYP. 1' - 5" TYP. 1' - 5" TYP. 1' - 5" TYP. 1' - 5" 6' - 5" 6' - 4 5/8" 7' - 0 1/8" 6' - 10 1/2" 5' - 11 1/4" 8' - 7 1/2" 9' - 4 7/8" 10' - 2 1/2" 11' - 1 1/2" 10' - 8" 217 VARIES 1" 6" TO BE CONFIRMED BY G.I. DIGITAL DOME SCREEN KNEE WALL CYLINDER WALL HANDRAIL VARIES 1" 6" TO BE CONFIRMED BY G.I. DIGITAL DOME SCREEN KNEE WALL CYLINDER WALL HANDRAIL PROJECTOR W/ FLIP UP ACCESS SPRING ISOLATORS UNDERCUT CARPET NOSING TYP. CARPET TILE RE: FINISH SCHEDULE SUPPLY GRILL: INSTALL @ FACE OF RISER CARPET TILE RE: FINISH SCHEDULE OVERFRAMING FOR LANDINGS RE:STRUCT. 1' - 0" 6" 1" TYP. 4 1/2" 217 C A7.4 10 11 104 FLIP TOP COUNTER 3' - 0" OVERFRAME MEZZANINE 119' - 7" FLIP TOP COUNTER 7' - 0" 12 A7.4 PLASTIC LAMINATE WRAPPED SUPPORT FOR FLIP TOP COUNTER 104 3'-0" TYP. OVERFRAME MEZZANINE 119' - 7" 2' - 6" 4' - 6" 13 A7.4 104 1' - 0" ALL EXPOSED SURFACES TO BE PLASTIC LAMINATE SCHEDULED PARTITION SCHEDULED BASE CONTROL ROOM DIGITAL DOME 2'-6" TYP. 104 2' - 6" 1 1/2" ALL EXPOSED SURFACES TO BE PLASTIC LAMINATE COUNTER SUPPORT BOTH SIDES OF COUNTER VERTICAL ARM OF BRACING IN WALL SCHEDULED BASE 1 1/2" 2' - 0" SCHEDULED PARTITION 104 OPENING RUNNING THE LENGTH OF COUNTER TO ALLOW FOR ACCESS TO POWER BELOW PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS © OZ ARCHITECTURE SCALE: SHEET NUMBER SHEET TITLE: ISSUED FOR: APPROVED: 1805 29th Street Suite 2054 Boulder, Colorado 80301 phone 303.449.8900 RECORD DRAWINGS 01/06/12 408 MASON COURT, FORT COLLINS, CO 80524 1/11/2012 5:36:38 PM C:\Revit Local Files\Revit 2010\809001 Discovery\Revit boulder local\809001-FT COLLINS MUSEUM-jlevy local.rvt As indicated FORT COLLINS DISCOVERY MUSEUM 809001.00 Author Checker 08/18/10 FINAL CONSTRUCTION DOCUMENTS INTERIOR ELEVATIONS - DIGITAL DOME A7.4 FORT COLLINS DISCOVERY MUSEUM Approver 1 DOME 1/4" = 1'-0" - NORTH 2 DOME 1/4" = 1'-0" - WEST 3 DOME 1/4" = 1'-0" - SOUTH 4 DOME 1/4" = 1'-0" - EAST 5 DOME 1/4" = 1'-0" PLAN 6 KNEEWALL 1 1/2" = 1'-0" TO DOME 7 1 1/2" = 1'-0" KNEEWALL TO DOME W/ PROJECTOR 8 1 1/2" = 1'-0" DOME STAIR LANDING DETAIL 9 DOME 1/2" = 1'-0" PLAN - CONTROL ROOM 10 DIGITAL 1/2" = 1'-0" DOME - CONTROL ROOM SOUTH 11 1/2" = 1'-0" DIGITAL DOME - CONTROL ROOM EAST 12 1 1/2" = 1'-0" DIGITAL DOME - CONTROL ROOM FRONT COUNTER 13 1 1/2" = 1'-0" DIGITAL DOME - CONTROL ROOM BACK COUNTER (NOT PART OF PROJECT SCOPE) (NOT PART OF PROJECT SCOPE) (NOT PART OF PROJECT SCOPE) (NOT PART OF PROJECT SCOPE) (NOT PART OF PROJECT SCOPE) (NOT PART OF PROJECT SCOPE) (NOT PART OF PROJECT SCOPE) 623 21 7 21 8 20 D 15 21 14 21 13 21 12 21 11 21 10 21 9 21 25'-7" C 1 21 2 21 3 21 4 21 5 20 6 20 7 20 8 20 C 15 21 14 21 13 21 12 21 11 20 10 20 9 20 1 21 2 21 3 21 4 21 5 21 6 21 7 20 8 20 9 20 15 21 14 21 13 21 12 21 11 21 10 21 8 21 9 21 10 21 11 21 12 21 13 21 14 21 A 7 21 6 21 5 21 4 21 3 21 2 21 1 21 A F 1 20 2 20 2-20 6 20 7 20 2-20 11 20 12 20 F 2-20 3 20M 4 20M 5 20M 8 20M 9 20M 10 20M 3-20(MB) WC WC WC WC 14-21 8-21,7-20 14-21,1-20 B 12-21,3-20 12-21,4-20 3-20(MB) UPPER ROOF 144' - 0" STRUCTURAL MEZZANINE 114' - 7" 1 A5.2.9 OVERFRAME MEZZANINE 119' - 7" A7.4 6 A7.4 7 STRUCTURAL MEZZANINE 114' - 7" OVERFRAME MEZZANINE 119' - 7" UPPER ROOF 144' - 0" STRUCTURAL MEZZANINE 114' - 7" 1 A5.2.9 OVERFRAME MEZZANINE 119' - 7" A7.4 7 A7.4 6 STRUCTURAL MEZZANINE 114' - 7" OVERFRAME MEZZANINE 119' - 7" 4" BLACK FIBERGLASS ON ALL INTERIOR WALLS AND CEILING SURFACES OF THE DOME CYLINDER BEHIND THE PROJECTION SCREEN TYP. 2" FABRIC WRAPPED ACOUSTICAL PANELS ON WALLS BELOW PROJECTION SCREEN TYP. A7.4 8 C 8 A7.4 3 2 4 1 19' - 0" 1" FABRIC WRAPPED ACOUSTICAL PANELS 1" FABRIC WRAPPED ACOUSTICAL PANELS 2" FABRIC WRAPPED ACOUSTICAL PANELS BELOW PROJECTION SCREEN TYP. 6 A7.4 7 A7.4 8 A7.4 A7.4 10 11 A7.4 9 Sim 104 2 A5.1.2 VARIES 1" 6" TO BE CONFIRMED BY G.I. DIGITAL DOME SCREEN KNEE WALL CYLINDER WALL HANDRAIL VARIES 1" 6" TO BE CONFIRMED BY G.I. DIGITAL DOME SCREEN KNEE WALL CYLINDER WALL HANDRAIL PROJECTOR W/ FLIP UP ACCESS SPRING ISOLATORS UNDERCUT CARPET NOSING TYP. SUPPLY GRILL: RUNS ALONG FACE OF STAIR, EVERY OTHER RISER CARPET TILE RE: FINISH SCHEDULE OVERFRAMING FOR LANDINGS RE:STRUCT. C A7.4 10 11 104 FLIP TOP COUNTER 3' - 0" OVERFRAME MEZZANINE 119' - 7" FLIP TOP COUNTER 7' - 0" 12 A7.4 PLASTIC LAMINATE WRAPPED SUPPORT FOR FLIP TOP COUNTER 104 3'-0" TYP. OVERFRAME MEZZANINE 119' - 7" 2' - 6" 4' - 6" 13 A7.4 104 1' - 0" ALL EXPOSED SURFACES TO BE PLASTIC LAMINATE SCHEDULED PARTITION SCHEDULED BASE CONTROL ROOM DIGITAL DOME 2'-6" TYP. 104 2' - 6" 1 1/2" ALL EXPOSED SURFACES TO BE PLASTIC LAMINATE COUNTER SUPPORT BOTH SIDES OF COUNTER VERTICAL ARM OF BRACING IN WALL SCHEDULED BASE 1 1/2" 2' - 0" SCHEDULED PARTITION 104 OPENING RUNNING THE LENGTH OF COUNTER TO ALLOW FOR ACCESS TO POWER BELOW PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS © OZ ARCHITECTURE SCALE: SHEET NUMBER SHEET TITLE: ISSUED FOR: APPROVED: 1805 29th Street Suite 2054 Boulder, Colorado 80301 phone 303.449.8900 UPDATED CONSTRUCTION DOCUMENT SET 03/25/11 408 MASON COURT, FORT COLLINS, CO 80524 3/25/2011 9:29:32 AM C:\Users\jlevy\Desktop\DISCOVERY MUSEUM REVIT\809001-FT COLLINS MUSEUM-jlevy local032211.rvt As indicated FORT COLLINS DISCOVERY MUSEUM 809001.00 Author Checker 8/18/10 FINAL CONSTRUCTION DOCUMENTS INTERIOR ELEVATIONS - DIGITAL DOME A7.4 FORT COLLINS DISCOVERY MUSEUM Approver 1 1/4" = 1'-0" DOME - NORTH 2 1/4" = 1'-0" DOME - WEST 3 1/4" = 1'-0" DOME - SOUTH 4 1/4" = 1'-0" DOME - EAST 5 1/4" = 1'-0" DOME PLAN 6 1 1/2" = 1'-0" KNEEWALL TO DOME 7 1 1/2" = 1'-0" KNEEWALL TO DOME W/ PROJECTOR 8 1 1/2" = 1'-0" DOME STAIR LANDING DETAIL 9 1/2" = 1'-0" DOME PLAN - CONTROL ROOM 10 1/2" = 1'-0" DIGITAL DOME - CONTROL ROOM SOUTH 11 1/2" = 1'-0" DIGITAL DOME - CONTROL ROOM EAST 12 1 1/2" = 1'-0" DIGITAL DOME - CONTROL ROOM FRONT COUNTER 13 1 1/2" = 1'-0" DIGITAL DOME - CONTROL ROOM BACK COUNTER phone 303.449.8900 UPDATED CONSTRUCTION DOCUMENT SET 03/25/11 408 MASON COURT, FORT COLLINS, CO 80524 3/25/2011 9:26:06 AM C:\Users\jlevy\Desktop\DISCOVERY MUSEUM REVIT\809001-FT COLLINS MUSEUM-jlevy local032211.rvt 1/4" = 1'-0" FORT COLLINS DISCOVERY MUSEUM 809001.00 JPL PS/DS 8/18/10 FINAL CONSTRUCTION DOCUMENTS DIGITAL DOME SECTIONS A5.2.9 FORT COLLINS DISCOVERY MUSEUM DS 1 1/4" = 1'-0" DOME SECTION 1 2 1/4" = 1'-0" DOME SECTION 2 131 COLLECTION STORAGE 128A STOR 128B NA 101 DOME M02 LOBBY 100 113' - 0" 110' - 0" 111' - 6" A9.2.1 5 A9.2.1 6 T.O. UPPER PARAPET 147' - 7" PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS © OZ ARCHITECTURE SCALE: SHEET NUMBER SHEET TITLE: ISSUED FOR: APPROVED: 1805 29th Street Suite 2054 Boulder, Colorado 80301 phone 303.449.8900 UPDATED CONSTRUCTION DOCUMENT SET 03/25/11 408 MASON COURT, FORT COLLINS, CO 80524 3/25/2011 9:24:27 AM C:\Users\jlevy\Desktop\DISCOVERY MUSEUM REVIT\809001-FT COLLINS MUSEUM-jlevy local032211.rvt 1/8" = 1'-0" FORT COLLINS DISCOVERY MUSEUM 809001.00 JPL/KG PS/DS 8/18/10 FINAL CONSTRUCTION DOCUMENTS BUIDLING SECTIONS A4.2.1 FORT COLLINS DISCOVERY MUSEUM DS 2 1/8" = 1'-0" SECTION -EAST/WEST 1 1/8" = 1'-0" SECTION - NORTH/SOUTH A5.1.1 301B 1 A5.2.9 2 A5.2.9 143' - 4" T.O. CONF. ROOM SLAB SLOPE 1/4" / 12" 4' - 6 5/8" 7' - 6 5/8" 8' - 6 3/8" 12' - 6 5/8" 378 SF CONFERENCE ROOM 301B 301C 9 A9.2.1 SLOPE 1/4" / 12" T.O PARAPET @ DOOR 9' - 10 7/8" 3' - 10 5/8" SLOPE STARTS T.O PARAPET T.O PARAPET 3' - 11 7/8" 17' - 5 1/4" 142' - 11" T.O. SLAB @ DRAIN 143' - 2 1/4" T.O. SLAB @ DRAIN 143' - 4" @ DOOR 16' - 0 3/8" 16' - 5 5/8" 6 A6.2.1 F.E.C. 142' - 8 7/8" A7.4 3 1 146' - 10" 146' - 10" 147' - 6" 3' - 8 1/2" 12' - 7" PARAPET SLOPES DN 302C 143' - 2" 4' - 6" 23L 23D 7 18' - 1 1/2" 3' - 10 1/8" 5' - 9" 11' - 5 1/2" 2' - 2 1/8" 7' - 3 5/8" 8' - 11 1/2" 6' - 0" 4' - 0" 2 A5.1.2 D C B A 7 8 9 2 A4.0.3 1 A4.2.1 OPEN TO BELOW 1 A4.2.2 6" 1' - 4 5/8" 1,165 SF MEZZ M01 M02B M01A 1,054 SF DOME M02 M02A A6.2.2 2 2 A5.1.1 3 A5.1.1 6 A5.1.1 A6.1.1 3 Sim A6.2.1 2 Sim 1 A5.2.9 2 A5.2.9 46C 46C 26C 66G 23J 46J 46J 46J 23J 23J M01B 119' - 7" 114' - 7" 23 3' - 10 5/8" 9' - 10 7/8" R = 19' - 0" 6 A6.2.1 F.E.C. M02E M02F 16B B 23C A7.4 3 2 4 1 1' - 4 5/8" 1' - 4 5/8" 1' - 4 5/8" 5 5/8" 5 5/8" 4 5/8" 5 5/8" 18.75° 11.44° 30.29° 30.00° 15.00° 4' - 7 7/8" 18' - 8 1/8" 18' - 10 7/8" 5 1/4" 1' - 11 1/2" 12.35° 4.13° 4.95° 1 A9.2.3 4 1 PR 008 A16 1 PR 008 A17 DELETE INTERIOR DRYWALL, CARPET AND RUBBER BASE IN DOME CYLINDER M02. LEAVE 6" OF DRYWALL AT EACH DOOR JAMB TO ALLOW FRAME TO MOUNT PROPERLY. LEAVE INSULATION AND BATT EXPOSED DELETE INTERIOR DRYWALL, RUBBER BASE AND CARPET IN MEZZANINE M01. LEAVE 6" OF DRYWALL AT EACH DOOR JAMB TO ALLOW FRAME TO MOUNT PROPERLY. LEAVE INSULATION AND BATT EXPOSED. ADD 10'-0" TALL WALL AND DOOR TO SEPARATE UNFINISHED SPACE FORM STAIR 2 5' - 0" 23L 44 44 MO2G A7.4 10 11 1 RFI 0197 A1 11' - 0" 1' - 11 7/8" 1' - 11 7/8" 4' - 0" 5' - 9 5/8" 1' - 11 5/8" 5' - 8 3/8" 1' - 11 5/8" 5' - 10" 1' - 11 5/8" 1' - 9 5/8" 1' - 11 5/8" 5' - 8 7/8" 3' - 11" 5' - 9 1/4" 1' - 11 5/8" 2 A5.1.2 1. TOP OF CONCRETE FLOOR AT LEVEL ONE LOBBY IS DEFINED AS PROJECT EL.100'-0". ELEVATION 100'-0" EQUATES TO USGS DATUM ELEVATION OF 4976.0'. 2. INTERIOR DIMENSIONS ARE TO FACE OF GYP BD., COLUMN CENTERLINE, OR FACE OF CONCRETE UNLESS OTHERWISE NOTED. ALL EXTERIOR DIMENSIONS ARE TO FACE OF SHEATHING OR FACE OF CONCRETE, UNLESS OTHERWISE NOTED. DIMENSIONS NOTED AS "CLEAR" OR "HOLD" SHALL BE MAINTAINED. 3. PROVIDE ALL NECESSARY BLOCKING IN WALLS AND CEILINGS. LOCATIONS INCLUDED, BUT ARE NOT LIMITED TO, ARE: CEILING AND WALL-MOUNTED FIXTURES, GRAB BARS, HANDRAILS, TOILETS, TOILET ACCESSORIES, CABINETRY, PANELING, COUNTERTOPS, SHELVES, CLOSET RODS, WHITE BOARDS, AND DECORATIVE BEAMS. 4. WHERE DOORS IN METAL STUD/GYPSUM BOARD PARTITIONS ARE NOT SPECIFICALLY LOCATED WITH A DIMENSION, PROVIDE A MINIMUM HINGE-SIDE JAMB DIMENSION OF 4" FROM DOOR OPENING TO ADJACENT PERPENDICULAR WALL. 5. PROVIDE 1/2" CLEARANCE FROM ANY DUCTWORK OR MECHANICAL EQUIPMENT THAT MAY CAUSE VIBRATION. 6. WHERE MECHANICAL DUCTWORK PENETRATES ANY COMPONENT OF A FIRE- RATED ASSEMBLY, PROVIDE FIRE AND/OR SMOKE DAMPERS IN ACCORDANCE WITH IBC SECTION 716. 7. THERE SHALL BE NO EXPOSED PIPE, DUCTS, ETC. ALL SUCH LINES SHALL BE CONCEALED OR FURRED, UNLESS NOTED AS EXPOSED CONSTRUCTION. 8. ALL NEW PARTITIONS ARE TYPE 26C, UNLESS OTHERWISE NOTED. RATED PARTITIONS AND WALLS ARE INDICATED ON CODE PLAN (SHEET A0.01). SEE SHEET A10.1.1 FOR PARTITION TYPES & WIDTH. PARTITION TYPES CONTINUE AROUND CORNERS UNLESS INDICATED OTHERWISE. 9. SEE A8 SERIES SHEETS FOR DOOR AND FRAME TYPES. 10. OUTLETS SHOWN BACK-TO-BACK SHALL BE OFFSET A MINIMUM OF 6". A STUD SHALL SEPARATE OUTLETS IN ACOUSTIC PARTITIONS. 11. RE A2.4.1 & A2.4.2 FOR PRE-CAST PANEL LAYOUT 12. DOOR TAG RE: A8.1.1 = FLOOR PLAN NOTES PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS © OZ ARCHITECTURE SCALE: SHEET NUMBER SHEET TITLE: ISSUED FOR: APPROVED: 1805 29th Street Suite 2054 Boulder, Colorado 80301 phone 303.449.8900 UPDATED CONSTRUCTION DOCUMENT SET 03/25/11 408 MASON COURT, FORT COLLINS, CO 80524 3/25/2011 9:17:43 AM C:\Users\jlevy\Desktop\DISCOVERY MUSEUM REVIT\809001-FT COLLINS MUSEUM-jlevy local032211.rvt As indicated FORT COLLINS DISCOVERY MUSEUM 809001.00 JPL/KG PS/DS 8/18/10 FINAL CONSTRUCTION DOCUMENTS LEVEL TWO FLOOR PLAN/DECK PLAN A2.2 FORT COLLINS DISCOVERY MUSEUM DS 2 1/8" = 1'-0" PLAN - ROOF DECK 0' 4' 8' 16' 32' 1 1/8" = 1'-0" MEZZANINE PLAN NOTE: TOP OF STRUCTURAL SLAB TO BE 6 1/4 BELOW TOPPING SLAB" 0' 4' 8' 16' 32' 10 20 9 20 D 1 21 2 21 3 21 4 21 5 21 6 21 7 21 8 20 D 15 21 14 21 13 21 12 21 11 21 10 21 9 21 25'-7" C 1 21 2 21 3 21 4 21 5 20 6 20 7 20 8 20 C 15 21 14 21 13 21 12 21 11 2 0 10 20 9 20 1 21 2 21 3 21 4 21 5 21 6 21 7 20 8 20 9 20 15 21 14 21 13 21 12 21 11 21 10 21 8 21 9 21 10 21 11 21 12 21 13 21 14 21 A 7 21 6 21 5 21 4 21 3 21 2 21 1 21 A F 1 20 2 20 2-20 6 20 7 20 2-20 11 20 12 2 0 F 2-20 3 20M 4 20M 5 20M 8 20M 9 20M 10 20M 3-20(MB) WC WC WC WC 14-21 8-21,7-20 14-21,1-20 B 12-21,3-20 12-21,4-20 3-20(MB) F E D C B A 2 3 4 5 6 7 8 9 10 G 1 CLASSROOM 110 CLASSROOM 109 LOBBY 100 REFERENCE 118 512 SF MECH 123 237 SF ELEC 122 GIFT SHOP 102 NA 101 VEST 101A MDF / IT 117 JAN 116 AREA A - A2.1a AREA B - A2.1b AREA A - A2.1a AREA B - A2.1b FAMILY LAV 115 WOMEN 113 MEN 114 MEN 107 WOMEN 108 JAN 106 1 A4.2.1 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" STORAGE 112 WORK ROOM 111 VOLUNTEER WORK 120 ADMINISTRATION 135 OFFICE 136 CONF. 137 OFFICE 138 OFFICE 139 OFFICE 140 H20 141 WORK ROOM 142 REC. 135A CIRC 128B RECEIVING 134 STAGING 133 ARTIFACT PROCESSING 131 COLLECTION STORAGE 128 VESTIBULE 126A COLLECTION STORAGE 128A UNISEX 129B UNISEX 130 1 A4.2.2 UNISEX 129A AREA A RE: A2.1a AREA B RE: A2.1b VEST 105A CAFE 104 CORRIDOR 103 2 A4.2.1 Sim COAT 100C STOR 128B TRAVELING EXHIBITS 127 GALLERY 126 9' - 4 1/4" H TYP. 4' - 0 1/2" 26 D C B 6 7 8 9 1 A4.2.1 1 A4.2.2 CONFERENCE ROOM LOBBY 301A ROOF DECK 302 D C B A 7 8 9 2 A4.0.3 1 A4.2.1 1 A4.2.2 19' - 0" MEZZ M01 DOME M02 A6.1.1 3 Sim A6.2.1 2 Sim SERVER ROOM M03 A9.4.1 4 A9.4.1 4 UNDERSLAB INSULATION ACCESS FLOORING LEGEND: PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS © OZ ARCHITECTURE SCALE: SHEET NUMBER SHEET TITLE: ISSUED FOR: APPROVED: 1805 29th Street Suite 2054 Boulder, Colorado 80301 phone 303.449.8900 UPDATED CONSTRUCTION DOCUMENT SET 03/25/11 408 MASON COURT, FORT COLLINS, CO 80524 3/25/2011 9:17:04 AM C:\Users\jlevy\Desktop\DISCOVERY MUSEUM REVIT\809001-FT COLLINS MUSEUM-jlevy local032211.rvt As indicated FORT COLLINS DISCOVERY MUSEUM 809001.00 JPL/KG DS/PS 8/18/10 FINAL CONSTRUCTION DOCUMENTS OVERALL FLOOR PLANS A2.1 FORT COLLINS DISCOVERY MUSEUM DS 1 3/32" = 1'-0" LEVEL 1 FLOOR PLAN - OVERALL 2 3/32" = 1'-0" ROOF DECK - PLAN RE. 1-A2.2b FOR ENLARGED 3 3/32" = 1'-0" MEZZANINE FLOOR PLAN - OVERALL RE 2/A2.2b FOR ENLARGED PLAN 02