Loading...
HomeMy WebLinkAboutCORRESPONDENCE - BID - 7195 CONCRETE REQUIREMENTS (2)F` h ���1 (6ti[itfi� Martin Marietta Materials ^ ^ 246Q'LLtr January 24,2014 John Stephen, CPPO, LEED AP Senior Buyer 215 N Mason City of Fort Collins 970-221-6777 RE: 2014 City of Fort Collins Concrete Pricing Proposal' Dear Mr. Stephen Thank you for your time. It was good to hear from you, it has been a little while. We have read your response to our proposed price increase for 2014. We evaluated our pricing prior to submittal and stand behind our quote. We understand your analysis of increase in percentages. MMM has experienced increased costs in our..materials, labor, and other costs that have been driven by supply and demand. In regards to your inquiry pertaining to Holcim, we do not purchase product from them, therefore we didn't refer to them in our proposal. We have appreciated the opportunity to work with the City of Fort Collins over the past several years and look forward to the possibility of working with the City in the future. We understand if the City will need to put this contract out for bid as we can't accept a 5% increase. I will follow up with you early next week. If you decide to present this for public bid, we look forward to submitting our proposal. Respectfully submitted, Ken Nelson Sales Representative Martin Marietta Materials Inc. Northern Concrete Division Cell (970) 215-4082 Martin Marietta Materials Rocky Mountain Division 1800 N Taft HN Road Fort Colrm% CO 80521 Telephone: (970) 407-3600 December 19tl', 2013 Dear Valued Customer: We want to thank you for your business and continued support during these challenging times. Over the last three and a half years, we have experienced an absorption in increased costs. During that time, we have also witnessed substantial deterioration in pricing and profitability. While we have taken measures to modify our operations, we have not compromised health & safety, product quality, new product development, or customer service. As key components In our cost structure continue to rise, we find ourselves in an unfortunate situation. The following increases have had an adverse impact to our cost structure: Cement-15% Raw Materials —14% Utilities —20% Labor —12% Insurance —14% In order to continue to provide quality products and services, we have been forced to increase our material prices. These increases are effective January 11% 2014. We value our relationship and look forward to continue providing you excellent products and services. Please feel free to contact me anytime with any concerns you may have. , Thank you, Marvin Meyer Martin Marietta Materials Inc. July 9, 2013 AM< MOUNTAIN CEMEM COMPeWY To our Valued Mountain Cement Customers: 1630 35th SI. Demer, Colorado 80216 (303) 295-1W As we enter the third quarter of 2013, we hope the resurgence in the marketplace finds you busy. As we continue to evaluate the factors affecting our manufacturing costs, we are seeing significant increases across all components. These include increasing raw material costs, increased transportation costs, significant increases in energy costs, and continued environmental constraints resulting in increased costs as well. As a result of these increased cost factors, and with respect to your long term planning and forecasting, please plan on the following price adjustments: o Effective January P, 2014, please plan on an increase of $8.00 per short ton No price protection will be provided for this increase o In addition, we strongly anticipate another price increase in the 3 d quarter of 2014 as we foresee continued manufacturing cost increases. We truly value your loyalty and the relationships -,ve have forged with your company, and we will make every effort to keep you informed and advised of the ever -changing dynamics within our industry. Should you have further questions please call your Mountain Cement Sales Representative or me directly at 303-295-1940. Respectfully, Casey Mendenhall Vice President, Sales and Marketing Mountain Cement Company Martin Marietta Materials 1 SOON. 71gfk Hill Road, Port Collins, CO 8052I Main Office: 970407-3600 Dispatch 970407--3700 Pax: 970407.3900 Proud to be American Owned and Operated To: City of FC Date: January 6th, 2014 Attention: John Stephen Project: Electric - Exempt Light 8 Power Customer If: 639772 Address: Various Locations Phone: 970-221-6777 Fort Collins, CO Fax: 970-221-6707 E-Mail: isteohenCdfcaov.com CONCRETE MATERIAL PRICE QUOTE r -MIxq 6 Mli Use B'Type s X ,�re - Streng�-hd'(a�]ISlump 'r28�D r -•.lAlr -.iiaili •2013�Prlee Eattmated Volume �P rice 1 or FF0934 Flow Fill 100 7-9" NIA $54.25 500 $66.25 N2310 2000 City Slurry 2000 6-8" N/A $72.70 500 $82.70 A2350 . Lean Concrete 2000 24' 4-7% $72.70 500 $82.70 SNO099 Sand 8 Water NIA NIA NIA $50.50 500 $60.50 A4780 City Exterior 4000 24" 4.5-7.5% $88.90 500 $98.90 Fibennesh $7:90 $8.00 "--''- =r "r+" 's"d r - • 'Sale"s6Tai1a6diTaiing fi 4YfPPojg4lPiease Note Concrete pricing as quoted does not include sales tax. The appropriate Sales Tax Rate will be charged to the project If the project is Tax Exempt the Tax Exempt Certificate must be received prior to the first shipment to the project. If the Tax Exempt Certificate is received after the start of the project, the purchaser is responsible for all applicable taxes associated with the delivery of material up until the date that the Tax Exempt Certificate is received by Martin Marietta Materials. It will be the purchaser's responsibility to file for a tax refund from the appropriate taxing authority for all shipments made prior to the date the Tax Exempt Certificate is received. Martin Marietta Materials will not issue a credit for taxes Projed.Speclfic�Notesl- vAll concrete as bla is per tOU minute max aelivery and vu Oegree max concrete temperature. All concrete pricing above is valid from 6:00am to 5:00pm Monday thru Friday. Price Escalators: TBA Per Cubic Yard Price Increase 08-01-14 Fees: Prices are F.O.B. job site and do not Include taxes. TERMS: NET 30 DAY$, 18% APR Interest will be added to all past due accounts. Add Miscellaneous Extra Charges: $8.00 Per Cubic Yard Per Each 1% Non Chloride Accelerator $3.50 Per Cubic Yard per each 1% Calcium Chloride $3.50 Per 20 Minute Increment of Retarder Per Cubic Yard $8.00 Per Cubic Yard for 1.5 Lbs.Fiber $0.00 Per Cubic Yard for Saturday Premium Charge $0.00 For Orders of 4 Cubic Yards or Less $0.00 Per Minute of Walt Time After 7 minutes Per Yard -Maximum of 45 minutes $275.00 Per Cubic Yard of Pump Prime $9.00 Extra Sack of Cement .(94 Pounds) Iffaren elarkMe Nararrats ^^ Pricing Good Through: IV3112014 Quotation expires 30 days from above data By: lRoper Marquise ITdle Sales Representative Cell: (970) 556-0119 ] E-mail: I Roper.Marauissomartinmarietta.com AZCMEX August 5, 2013 Dear Valued Customer, We want to thank you for your business and continued support Your support during 2013 has been greatly appreciated and is never taken for granted. We are hoping for your continued support next year. As we head into the New Year, we are encouraged that the construction economy remains robust with nearly all the indicators pointing upwards. We have seen an increase in residential building permits and new starts, as well as increases in commercial and infrastructure construction activity. Cleary we am well on our way out of the extended construction recession, but volumes are not enough to keep up with the growing Inflationary pressures arising from increasing electricity, lbel, maintenance and labor and environmental compliance costs. At this time we would like to inform you that our bulk cement prices out of our Lyons plant and Florence terminal in Colorado will increase by $8 per ton effective January 1, 2014, followed by an S8 per ton Increase effective July 1, 2014. All of our cement plants will treed to come into compliance by September of 2015 with the new National Emissions Standards for Hazardous Atr Pollutants (NP,SHAP). These standards were arrived at after a thorough multi year review by the Environmental Protection Agency (EPA) as they weighed the societal benefit of the increased regulations to the cost of implementing them. Consequently, we will be required to invest considerable capital and inaa significant ongoing operating costs to achieve the emissions and other limits required by NESHAP. Given the federal nature of this new standard you will notice your invoices already includes an environmental surcharge that currently has a $0 charge on it At a date yet to be determined between 2014 and September 2015, we will start charging an environmental surcharge within the range of $3.50 - $5.25/ST to cover the capital and ongoing operating costs to provide the societal benefits provided by these increased regulations. We will notify you at least 180 days prior to this fee coming into effect We felt it is important to give you this notice so that you may be fully prepared for next year during your planning and bidding processes. As always, all sales are subject to our Standard Terms and Conditions, and price protection will not be granted. Please note that our credit terms are as follows: Payments are due on or before the 20m day of the month following the month of the invoice date for such purchase. Payment outside these terms Is a defeolo lean and should be treated as such. Therefore, we will be assessing a finance charge of the lesser of 1%per mouth and the maximum amount of interest permitted under applicable law on all involves not paid within terms. We value our relationship and look forward to continue providing you excellent products and services. Please fed flee to contact us anytime with any concerns you may have. Sincerely, Robert F. Craddock Jr. Juan C. Castillo EVP Commercial and Government Affairs VP Cement Sales — Texas & Colorado Bata am 200 VW P4A Nee Be«adds, TX M32. M 9a23M MO) 2504 M. (NO) 2934153 Martin Marietta Materials 1800 N. Tat Hill Road, Fort Collins, CO 80521 Main Offica: 9704073600 Dispatch: 970407.3700 F= 9704073900 Proud to be American Owned and Operated To: City of FC Date: January 6th, 2014 Attention: John Stephen Project: Parks - FC Parks Maintenance Customer#: 639773 Address: Various Locations Phone: 970-221-6777 Fort Collins, CO Fax: 970-221-6707 E-Mail. isteohen(df000v.com CONCRETE MATERIAL PRICE QUOTE u ✓Mix # ` Mixy " 'Use&Type Strength@ 261D s -` Slump Alr , - " 1 2018'Prlee • F-stlmated volume :'Pelee ercY A4780 City Exterior 4000 2-4" 4.5-7.5% $88.90 500 $98.90 PN4376 3/8" Grout 3000 4-6" 4-7% ; $86.80 100 $96.86 Fibermesh $7.00 $8.00 to w-. —='="--�'� a � _�- •, S Sales�Tez iindaTaningLforLP@jii- P,lease Note Concrete pricing as quoted does not include sales tax. The appropriate Sales Tax Rate will be charged to the project. If the project is Tax Exempt the Tax Exempt Certificate must be received prior to the first shipment to the project. If the Tax Exempt Certificate Is received after the start of the project the purchaser is responsible for all applicable taxes associated with the delivery of material up until the date that the Tax Exempt Certificate is received by Martin Marietta Materials. It will be the purchaser's responsibility to fife for a tax refund from the appropriate taxing authority for all shipments made prior to the data the Tax Exempt Certificate is received. Martin Marietta Materials will not Issue a credit for taxes Project SpecificNotesiand,Comments: - Ail concrete as bid is per minute max peirvery and tip degree max concrete temperature. All concrete pricing above is valid from 6:00am to 5:00pm Monday thru Friday. Price Escalators: TBA Per Cubic Yard Price Increase 08-01-14 - Prices are F.O.B. job site and do not include taxes. TERMS: NET 30 DAYS, 18% APR Interest will be added to all past due accounts. Add Miscellaneous Extra Charges: $8.00 Per Cubic Yard Per Each 1% Non Chlodde Accelerator $3.50 Per Cubic Yard per each 1% Calcium Chloride $3.50 Per 20 Minute Increment of Retarder Per Cubic Yard $8.00 Per Cubic Yard for 1.5 Lbs.Fiber $0.00 Per Cubic Yard for Saturday Premium Charge $0.00 For Orders of 4 Cubic Yards or Less $0.00 Per Minute of Waft Time After 7 minutes Per Yard -Maximum of 45 minutes $275.00 Per Cubic Yard of Pump Prime $9.00 Extra Sack of Cement (94 Pounds) Martin Marietta Material �^ Pricing Good Through: 1213112014 Quotation expires 30 days from above data By: Roper Marquiss Title: Sales RepresenfatNe Celt: (970) 556-0119 ' �E-mail: I Roder.Marauissomartinmarietta.com Martin Marietta Materials 1900 N. Tq t Hill Road, Port Collins, CO 80521 Main Office: 9704073600 Dispatch 97OL407-3700 Paz: 970407-3900 Proud to be American Owned and Operated To: City of FC Date: January 6th, 2014 Attention: John Stephen Project: Streets - FC Streets Division Customer il: 639774 Address: Various Locations Phone: 970-221-6777 Fort Collins, CO Fax: 970.221.6707 E-Mail: isteoheniiifcoov.com CONCRETE MATERIAL PRICE QUOTE ;.. _ Mix # -� Y .'; ""' %+`" ,onStrengtpl� ; " Mix Use & Type .t: �.,.�.�iu^' �: 3 rs3' 28il)s r'- ,Slump mac$ Alr; s. .,rm .2013 Prke : as,.4r,s�.u�e�; Fsdmeted - + dt+Volume Pilee' k`. a r.CY A3501 General Exterior 3000 24" 4-7% $83.45 500 $93.45 PN4376 3/8" Grout 3000 4-6" 4-7% $86.80 500 $96.80 HE5224 24 Hour High Early 5000 3-5" 5-8% $112.55 100 $122.55 Fibennesh $7.00 $8.00 i „_,;:Y' ' ;' Q "::. r tSelesJatUand 7axing'fUf PFojeetPlaa`se Noted-' Concrete pricing as quoted does not include sales tax. The appropriate Sales Tax Rate will be charged to the project If the project Is Tax Exempt the Tax Exempt Certificate must be received prior to the first shipment to the project. If the Tax Exempt Certificate is received after the start of the project, the purchaser is responsible for all applicable taxes associated with the delivery of material up until the date that the Tax Exempt Certificate is received by Martin Marietta Materials. It will be the purchasers responsibility to file for a tax refund from the appropriate taxing authoritv for all shipments made prior to the date the Tax Exempt Certificate is received. Martin Marietta Materials will not issue a credit for taxes P.r_oJec_tS_pedffc Notes�I:and�Gomments ;„u.,`�,,,,�.'_^�':;., *,, mi concrita as uiu Is per VU minute max aefivery and WU degree max concrete temperature. All concrete pricing above is valid from 6:00am to 5:00pm Monday thru Friday. Price Escalators: TBA Per Cubic Yard Price Increase 08-01-14 Prices are F.O.B. job site and do not include taxes. TERMS: NET 30 DAYS, 18% APR Interest will be added to all past due accounts. Add Miscellaneous Extra Charges: $8.00 Per Cubic Yard Per Each 1 % Non Chloride Accelerator $3.50 Per Cubic Yard per each 1% Calcium Chloride $3.50 Per 20 Minute Increment of Retarder Per Cubic Yard $8.00 Per Cubic Yard for 1.5 Lbs.Fiber $0.00 Per Cubic Yard for Saturday Premium Charge $0.00 For Orders of 4 Cubic Yards or Less $0.00 Per Minute of Wait Time After 7 minutes Per Yard -Maximum of 45 minutes $275.00 Per Cubic Yard of Pump Prime $9.00 Extra Sack of Cement (94 Pounds) Martin Marietta Materlab" V� Pricing Good Through: 1213112014 Quotation expires 30 days from above date By: I Roper Marquiss Title: Sales Representative Cell: (970) 55641119 E-mail: Roper.Marouisstr�martinmarietta.com Martin Marietta Materials 1800 N. Tgfi Rill Road, Fort Collins, CO 80521 Main office: 970407-3600 Dispatch: 970407-3700 Pax 9704073900 Proud to be American Owned and Operated To: City of FC Date: January 6th, 2014 Attention: John Stephen Project: Traffic - FC Traffic Division Customer#: 639775 Address: Various Locations Phone: 970-221-6777 Fort Collins, CO Fax: 970-221-6707 E-Mail: isteohen0fogov.com CONCRETE MATERIAL PRICE QUOTE Stren901T� s umpAir "-=' - 2013'Prke Fstlrireted 'Volume JPdAceeD FF0934 Flow Fill 100 7-91, WA $54.25 500 A4780 City Exterior 4000 24" 4.5-7.5% $88.90 500 $98.90 PN4376 3/8" Grout 3000 ".1 4-7% $86.80 100 $96.80 CBZ4901 BZ Caissons 4000 6-81. N/A $90.70 100 $100.70 Fibermesh $7.00 $8.00 Tazlii,tofPro eclRPlease'Note .c.�_1_..�__� Concrete pricing as quoted does not include sales tax. The appropriate Sales Tax Rate will be charged to the project. If the project is Tax Exempt the Tax Exempt Certificate must be received prior to the first shipment to the project. If the Tax Exempt Certificate Is received after the start of the project, the purchaser is responsible for all applicable taxes associated with the delivery of material up until the date that the Tax Exempt Certificate is received by Martin Marietta Materials. It will be the purchasers responsibility to file for a tax refund from the appropriate taxing authority for all shipments made prior to the date the Tax Exempt Certificate is received. Martin Marietta Materials will not Issue a credit for taxes P,rojectSpecificNotes?and•Comments; Au concrete as old is per minute max delivery and 9U degree max concrete !emperatUre. All concrete pricing above is valid from 6:00am to 5:00pm Monday thru Friday. Price Escalators: TBA Per Cubic Yard Price Increase 08-01-14 Prices are F.O.B. job site and do not include taxes. TERMS: NET 30 DAYS, 18% APR Interest will be added to all past due accounts. Add Miscellaneous Extra Charges: $8.00 Per Cubic Yard Per Each 1% Non Chloride Accelerator $3.50 Per Cubic Yard per each 1 % Calcium Chloride $3.50 Per 20 Minute Increment of Retarder Per Cubic Yard $8.00 Per Cubic Yard for 1.6 Lbs.Fiber $0.00 Per Cubic Yard for Saturday Premium Charge $0.00 For Orders of 4 Cubic Yards or Less $0.00 Per Minute of Wait Time After 7 minutes Per Yard -Maximum of 45 minutes $275.00 Per Cubic Yard of Pump Prime $9.00 Extra Sack of Cement (94 Pounds) Martin Marietta sAatedata Pricing Good Through: 1273112014 Quotation expires 30 days from above date By: IRoperMarquiss fill.: Sales Representative Cell: ___ (970)556-0119 JE-mail: IRoper.MarauSs�martinmarietta.com Martin Marietta Materials 1800 N. Tq/t Hill Roa4 Fort ColNns, CO 80521 Main Office: 970407-3600 Mspatah: 9704073700 F= 970407-3900 Proud to be American Owned and Ooerated To: City of FC Date: January 6th, 2014 Attention: John Stephen Project: Water- FC Water Division Customer#: 639776 Address: Various Locations Phone: 970-221-6777 Fort Collins, CO Fax: 970-221-6707 E-Mail: isteohen(aZfcaov.com CONCRETE MATERIAL PRICE QUOTE Mix # r .._. ....w� .L .MIx,Use &Type c ,u - ., ..". ��.;. A .. - -StrengthA@ ;281D-sv Slump:Al; ,"r.; , .. r 2013 Price .v a`,-"^ I Fstlmate ;'Volume �PrleeFv iper,C,V i FF0934 Flow Fill 100 7-9" WA $54.25 500 $66.25 A4780 City Exterior 4000 24" 4.5-7.5% $88.90 Soo $98.90 PN4376 3/8" Grout 3000 4-6" 4-7% $86.80 100 $96.80 Fibermesh $7.00 $8.00 4Ta>i_end_Taxln9,foiP,roJeet Concrete pricing as quoted does not include sales tax. The appropriate Sales Tax Rate will be charged to the project. If the project is Tax Exempt the Tax Exempt Certificate must be received prior to the first shipment to the project. If the Tax Exempt Certificate is received after the start of the project, the purchaser is responsible for all applicable taxes associated with the delivery of material up until the date that the Tax Exempt Certificate is received by Martin Marietta Materials. It will be the purchasers responsibility to file for a tax refund from the appropriate taxing authoritvfor all sh" ments made prior to the date the Tax Exempt Certificate is received. Martin Marietta Materials will not issue a credit for taxes P,rojectySpectfic Notes;and Pit concre a as 010 is per UU minute max delivery and titt degree max concrete tempera ure. All concrete pricing above is valid from 6:00am to 5:00pm Monday thru Friday. Price Escalators: TBA Per Cubic Yard Price Increase 08-01-14 Prices are F.O.B. job site and do not include faxes. TERMS: NET 30 DAYS, 18% APR Interest will be added to all past due accounts. ' Add Miscellaneous Extra Charges: $8.00 Per Cubic Yard Per Each 1 % Non Chloride Accelerator . $3.50 Per Cubic Yard per each 1 % Calcium Chloride $3.50 Per 20 Minute Increment of Retarder Per Cubic Yard $8.00 Per Cubic Yard for 1.5 Lbs.Fiber $0.00 Per Cubic Yard for Saturday Premium Charge $0.00 For Orders of 4 Cubic Yards or Less $0.00 Per Minute of Wait Time After 7 minutes Per Yard -Maximum of 45 minutes $275.00 Per Cubic Yard of Pump Prime $9.00 Extra Sack of Cement (94 Pounds) aa.w, rna.r.v. M ftft nn Pricing Good Through: 12131/2014 Quotation expires 30 days from above date By: Roper Marquiss Title: Sales Representative Cell: 970 55"119 E-mail: RooecMamulssi�marilnmarietta.com