HomeMy WebLinkAboutCHANGE ORDER - BID - 7382 MAX BRT SOUTH TRANSIT CENTER (7)PROJECT TITLE:
CONTRACTOR:
PROJECT NUMBER:
PURCHASE ORDER NO.:
DESCRIPTION:
1. Reason for change:
See attached Exhibit
2. Description of Change:
CHANGE ORDER NO. 12
Mason Corridor - South Transit Center
Growling Bear Inc.
7382
9124530
Landscaping and Irrigation Deletion
See attached Exhibit A
Only this amount is
agreed upon all
references to non
approved change
orders and revised
contract amount is
rejected
3. Change In Contract Cost
4. Change in Contract Time: 1 0 Icalendar days for substantial completion
0 icalendar days forfinal completion
TOTIAL APPROVIZI) CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL -4 GRORIGML—CONTRACT,- THIS -GOB
TATA6�4 0E-GRIGINAL GOP!TRAnr�AITo_on c
ADd
orders
ACCEPTED BY:
Contractor's Rep
REVIEW ED BY:
Construction Mai
APPROVED BY
City Project Manag t - "
APPROVED BY:
Director of infrastructure Services
APPROVED BY:
Purchasing Agent over S60,000
a: CIVCkrk Architect
Cortractcr Engineer
Pro}ect File Purchasing
2//th /
DATE: G - I. - A
DATE:,2 -(
DATE:2 - (Q —/ 4
DATE:
maxWORK CHANGE DIRECTIVE
TO CONTRACTOR: Growling Bear Inc. WCD NO: 021
PROJECT: Mason Corridor- MAX BRT (South Transit Center) PROJECT NO:
OWNER: City of Fort Collins- Engineering Department
ENGINEERIARCHITECT: Aller
The following additions, deletions, or revisions to the Work have been ordered and authorized:
(Title of WCD): Delete Irrigation and Landscaping
7382
This work change directive directs the Contractor to price, and if accepted, remove all irrigation and
landscaping project components as defined herein.
• Delete all irrigation mainline, laterals, sprinklers, drip system as defined in plan sheets IR1.0, IRM,
IR2.0, IR2.1, and specifications section 02810. The Contractor shall be compensated for work in place
included sleeving.
• Delete all landscaping materials and installation as defined in plan sheets D4.0, D5.0, L1.0, L2.0,
LS1.0, and LS3.0 including trees, shrubs, sod, seed, compost application and mixing, planting bed
mulch supply and installation (rock and wood), weed barrier fabric and crusher fines path according
to specification sections 02550, 02920, 02930. The Contractor shall provide a summary of landscaping
materials already paid as stored to reconcile the remaining materials to be purchased as shown in the
plant lists contained in the project drawings. The Contractor shall fine grade all planting areas to
within 0.1' of plan grade as part of substantial completion.
The Contractor shall maintain the base bid items defined in the sheets listed above that are not
landscaping or irrigation elements (e.g. fencing, concrete, benches, bike racks, etc.). The elements
shall remain part of the base contract.
This work shall be priced as a two lump sum credits to the based contract. One credit for irrigation
and one credit for landscaping/plantings. Each credit shall be accompanied by a detailed listing of
costs to support how the Contractor developed the credit for each lump sum amount. The detailed
listed shall include all labor, equipment and materials that were estimated as part of the base bid to
develop costs provided in the Schedule of Values items 1) STC Building item 2d - Landscaping; 2)
STC Park and Ride item 2d - Sprinkler Irrigation; 2d - Seeding and Landscape; 2d - Shrubs and
Plants; 2d - Ornamental. Trees; 2d - Shade Trees.
This change is being initiated by the City as Growling Bear/ Universal Surety do not have the contract
time to complete the work. The City desires to complete this work in the Spring of 2014 outside the
Growling Bear contract.
WCD021 DELETE IRRIGATION AND LANDSCAPING 12-12-13 FINAL PAGE 1 OF 2
Attachments (List Supporting Documents):
It is understood that this Work Change Directive may change the Contract Price and/or Time, and is evidence that the parties
expect a Change Order request for approval to subsequently follow this Work Change Directive.
Ordered By: j/ ./�t.,- CGGt'�'-'� December 12, 2013
mer Date
Recommended By: & December 12, 2013
Construction M ager Dale
Copy: Owner; Engineer/Architect; Field File - SharePoint
WCDO21_DELETE IRRIGATIONAND LANDSCAPING_12-12-13 FINAL PAGE 2OF2
Fort Collins
February 18, 2014
Mr. Curt Hartter
Universal Surety Company
601 South 12ei Street, Suite 100
P.O. Box 80468
Lincoln, Nebraska 68501
Planning, Development & Transportation
Engineering
281 North College Avenue
P.O. Box 580
Fort Collins, CO 80522.0580
970.221.6605
970.221.6378 -fax
kgov.coMengineering
RE: South Transit Center — City of Fort Collins Project -No: 7382
Response to Universal Protest of Change Order 12
Mr. Hartter,
Deliveryby email to
cnrthna,umversahnland. com
The City is in receipt of a letter from Universal/Growling Bear dated February 11, 2014 accepting only
the value of Change Order 12 and rejecting the total contract amount and all other referenced change
orders. In addition, Universal has modified the City's change order form to reflect this opinion. The City
has executed the change order in this format only in the interest of formalizing approval of the Change. in
Contract Cost value.
The City's acceptance of the modified form is not a settlement, accord & satisfaction, or other
compromise of any prior change order value or the calculation of total impact to the contract price of all
project change orders to date. The City reserves all rights with regard to such prior values and
calculations, including the stated Adjusted Contract Price as reflected in Change Order 12, as provided by
the City on January 31, 2014.
Sincerely,
Erika Keeton, P.E
Special Projects Engineer
City of Fort Collins
CC: Kent Mills, Universal Surety
Keith Meyer — BRT Construction Manager
Cyril Vidergar — Assistant City Attorney
John Stephen— Senior Buyer
Gerry Paul — Director of Purchasing and Risk Management
Ron Kechter — Project Engineer
Growling Bear Co. Inc.
South Transit Center Change order 12
Only the amount of change order 12 is accepted references to total amount of all change orders, total contract
amount, and all other change orders references are rejected and all rights are reserved. Growling Bear and Universal
Surety have not signed nor agreed with city on change orders 2, 3, and 6 — 11.
Gary Shironaka
Growling Bear cc Inc
c
Curt k / 41L
Hartter
Universal Surety
2330 4th Avenue, Greeley, Colorado 8o631 Phone: 97o-353-6964 Fax.- 97o-353-6974
Flilot�.
Y
}
CHANGE ORDER NO. 12
Exhibit A
Project: Mason Corridor — South Transit Center
Project No. 7382
Date: January 31, 2014
Description of Change:
MAX Field Construction Office
3000 South College Ave., Suite 201
Fort Collins, CO 80526
fcgov.com/maxconstruction
This change order removes the landscaping, plantings, seeding and Irrigation from the Universal Surety/Growling
Bear contract. This change is being made to allow the Contractor rel ief from this scope of work as the schedule for
installation is expected to extend into early spring 2014. Removing this from the contract will allow earlier
completion and avoid extended liquidated damages being withheld by the City.
Change in Contract Value:
The contract value is being decreased by $134,578.16. Please see attached pending issues log summary and
work change directives as summarized in the table(s) below.
eDirectivesfltems or V 5
Item Number
Description
Contract Value
WCD021
Delete Landscaping and irrigation
-$133,245.70
Reduction for Bond Q 1%
-$1,332.46
Total Work Change Directives Change:
-$134,578.16
Change in Contract Time:
This change order authorizes a contract time extension of zero (0) calendar days.
Page 1 of 1
Pending Issues Log
ma>:
Data: 01131/14
Rd. No.
CO/
SCC
Saw Seobon
Item Dmaletion
Data
Rmuashd
Amourd
Shan
1
20.04
Varies
Tree Ramovel; Seale and Leath Red; Artwork
11262012
S20044.57
Adds tee Denoval, septic lank and hi tank removal artwgrk relocatlon
2
20.04
none
Adds veetDer der,e to cantrea
2/ Wdl It
$0.00
Adds 18 waalher d to contract Island by CRY
3
20.04
ndre
Demob't cwhorkmobilira6m.
322/2013
SOM
2 dayb grearted,mst ds uted, unfl.tenel by Cis - wanuitinic positio, from Lhivemel
4
20.04
Dv 16
GmOult for commmlcadon and efectlr9 work; vaalls
5/142013
312,830.53
Adds vauhs b fiber, r sini c rnunicalims and flow fill for tranchra
5
20.04
dv 2115
Bookflar.ecentorraoca9on
52420/3
$9,61 40
RMocales BFP into S ndle Ban buildn :rernows vaull
6
20.04
Div2
Storm Sewer Pratte A adusnent (bulity, cm0iets
St82013
$6,810.58
Adusts storm proffle A - mating position from Unismsal .,mated pilyn, ant in pay app 13
WCDO01
7
20.04
dv2
FCLWD waterline lowarina Fesel BIW
5/62013
f22,229.00
Adds waterline Immnng In Fossil BIM. patching (Decked units and matedats) -awaiting position tan
Uniceni pmc .d DevrDent in Day sop 13
WCDO02
8
20.04
MvS
Structural changes to gilifline 48 and 99
WnO13
f1314G.88
Adds np in9 and formwork at 9ddline 8 and 9- awaiting position Bean Universal; fallowbeen
calculations(icon at" unce, final rem.
WCDO03
11
20.04
Div
Site m adinc-no weslcdnercmnactlon to Idawe
3282013
$1,488.55
Adds grating to naMwest caner of site to matO guideway (f8M); pending canplello, by contractor;
TBM costs paid In PA 15
WCM04
10
20.04
Civ2
Detention Pend rt dins
32B2013
$3,993.67
Atlds mina reprodiel, to detention pond 8M
WCW05,,.r
10
Pv3
Te beam plan disaman
625I2013
$4847.21
Was tracked as Ume and in atedal costs for Dam an: paid In pay mp 13
do CDOO6t 1
L-1,
D5'20.04
1+20.04
dv3
Daecleble.Wamin stf 5
9/1
515285:55
guaeitl,to De erecondled emin9sMps (cnmgm to rxltiron); cmLs'uptletedendmder
WCD007
11
20.04
'dv2
Storm Inlet and one conneclien el bell phase
9O/2013
$3709.59
Adds an veer inlet and op. emnection to"n Me Mason "it; avalling can clib contactor
1Y:>:.r.:yy4plm6'nyY.�-r,x
F�.]W000OB,f
11 t�
20.045
a
o0iv21
BRT.cub rofile mdlh ht than oaF IaVams
B/A2013
f1129:74
CDanT-Tpes�rD.pIF ana,9hl.at'B��Ririn0 plal_s:a, r�a18n9mpv�rsahwn cmtatlwmrub
nil cad ale aedtnd rowtled :Ci .will .Nor eosl Nrou C011 and PA15
WGD009
10
20.04
Div
Adds banner arts al future cmnedon to Spradley Ban
922013
$392.06
Adds l T tan baner curb at road to Salads, Barr
WC0010
10
1 20.Oa
I Civil)
Beenreal then es to In clam antl monumem sl n:1.13
902013
$3960.55
Adds an indepandanL cincwt to inch location aniss,ing from design
WCD011
20A4
Van..
widno mock be
922013
S0.W
Clarifies mock up parameters and adds sces.of work$24752-rod sesepted by Owner
WC0012
10
20.04
On,2
Conbs/Fossll lNa work-T&M
5212013
$3,028.10
Tracked as Unhe and material cosh for paygn ant Paid in pay asp 13
WCM13
10
20.04
Div 2 and 16
Sprinkler Tap, lnf atim Seening, Cmtrader Relocation
MWO13
51,351.05
Costs in response to RM70 for ion ati. and tap Dean. ending, t.p paidN M app13
WCDO14
10
20.04
Uv2
Waterline Lae, Cmneefl./abandon saMce to hmse
92MO13
S12821.16
Tracked as ih,e and m eteri.l costs for pament
WCW15
11
20.W
Div2
Concrete -HMA pabp aanvdm
Wei
S0.00
Changes concrete to asphalt paving bansition of site entance (GBI dery $1.463.93); amount not
agreed b by City -details proldeel to Cmtar2m no remake as of 12-13-13; G01 agmed to SO value
on12-23-13.
WC13016
11
20.04
dv2
Grades at East Ramps
9282013
f0.00
Changed prodes at seat handcar nwDDS
WCW17
11
20.04
dv3
D mds at CA Onto in oancrde p"nq
tO11112013
$3,1M.03
Adds d.MW esprit. ants to concrete paning around painsion
WC0018
10
20.N
dv3
Trereterfar IaHam mob
102312013
$1956.17
rebartiemds from oladdrm cublo ttncrete amn
WCM19
11
20.04
dv2
Daa'nsCadcmn.Wmst0salrrl Diin m latlwm
10212013
$3689.37
Reauests .tfordavmsadconne mstuslmndminset GL3519'undmr mbyCity
role
9
20.04
Civ 3
ESD Demegad mob et BRTW by
11212013
f1 52,.901
Rc a'r of ESD de nor ed mrb by CEI
�YIC0020
=13�=20:041.:.
-.-
-
_dv27. �.-
�.- �� + •. :." ;'x
Chen eta MOFneeks=��_'X
�17J12/2013�
53397-182
Chen a/Gadfi MOFiafk`oeit numDers'."2 t: =:2�b `� d`-;. + 3h,rsR'f <eFi.a y:.*:::j
wCD021
12
20.U4
dv2
Delelelandsce Inaandhl aim
12D22013
4134.578.16
Removes ltl ation and landscaping balance from contact
�''WCD622d-
-
's
F12/L.
1/13
59�.3Addrd
4
arVt'- '9'
WCDO23
20.04
Div 16
TVM 30A cirtVS
12/202013
$0.00
Ran change no cost per 4Mlersal
rdn:IWCD024ti6'��
�20.011
Mdvl
DiscmnocfatmeinseM w tobulldin
1�/23201'4��Adds
is
d'ucanneU:to main service to builGin x.catle
Pending
Changes to==Is mix design
9192013
$0.00
Ownv door not acoapt cost fachange to mix design; no benefit shove by Contmdar $12,673
COP05B
Ramobilization costs for Plkes Peak Steeltermination
101=013
$0.00
Rem Minzatnmcoskfdstmdumisteasube0nidmoBVGBlterminmim 5706.42 tsarecce tad
COP062
Cofae Bho Rdlin Oov
11222013
SD.00
Ownervoedea letter to install coiling door per cderact ammngs; no integral me: ,036.d7 nor
acceNed
Pending issues Log
mat:
OM: OV31114
Rol. No.
co/
I Scc
Spac Section
Itom Doccrlp0on
DWo
Requeetetl
Nnoum
StaNs
PentlinB oral: 1B�Wl.BJ
Total rW.I ormaa Amount 6, "0
Must wmaM MnrM p ak
PentlinB lawaae% ontrad MwM ORB%
naMe er%aapprwea 0.19%
noels onion by Owner
needle wMc "acr
Universal Surety TRANSMITTAL
No. 00035
PROJECT: FC South Transit
TO: Fort Collins South Transit Center
4915 Fossil Blvd
Fort Collins, CO 80525
ATTN: Ron Kechter
DATE: 112 U2014
REF: COP 064 Landscaping Dele
WE ARE SENDING,
B R:
TI NT
❑ ShoeDrawings
❑ Approval
❑ Approved as Submitted
❑
❑ Youruse
❑ A roved as Noted
ElPrin(s nls
❑ As R uested
❑ Returned After loan
❑ Change Order
❑ Revicw and Comment
❑ Resubmit
❑ Plans
❑ Submit
❑ Sam ter
SENT-VIA:..r..
El Returned
❑ S eifications
❑ Attached
❑ Returned Cot Corrections
❑ Olher. IQ
se ame Cover Via:
❑ Due Date:
TTEM"PACKAGE SUBMTTTAI. DRAWING .. REV: IT&M NOCOPIFS DATE" 'DESCRIPTION- STATUS"
Remarks:
CC:
001 1 1/18/2014 COP 064 Landscaping Delete
Signed:
Kent Mills
n.rmN1 a®
Growling Bear Construction Inc. PROPOSED CHANGE ORDER
No. 00064
2330 41h Ave Phone: 970-353-6964
Greeley, Colorado 80631 Fax: 970-353-6974
TITLE: WCD 021 Delete Landseping DATE:1/21/2014
PROJECT: FC South Transit JOB:
TO: Attn: Kent Mills CONTRACT NO:
Universal Surety
RE: To:
From:
Number:
DESCRIPTION OF P136POSAL
Delete
Remaining Landscaping excluding pavers
Item
- Deseripdo' u; , Stock#; -
Quantity " Units
Unit Pried' -
Tax Rate Tax-AinountNet Amount
00001
2C Landscaping
.1.000 LS
S92,215.70
0.0091,
S0.00
($92,215.70)
00002
2d Seeding S landscape
-1.000 LS
S10,166.00
0.00%
S0.00
($10,166.00)
00003
2d Shmbs and Plants
-1.000 LS
$7,328.00
0.00%
$0.00
(57328.00)
00004
2d Ornamental Trees 2.5'
-1.000 1S
S506.00
0.00%
$0.00
(S506.00)
00005
Shade Trees
-1.000 LS
S17,808.00
0.00%
$0.00
(S17,808.00)
00006
2d Sprinkler irrigation
-I.D00 IS
$5,222.00
0.00%
$0.00
($5,222.00)
APPROVAL:
By:
Gary Shironaka
Date:
Unit Cost:
Unit Tax:
Lump Sum:
Lump Tax:
Total:
($133,245.70)
$0.00
$0.00
$0.00
($133,245.70)
�IKJ Greil..rc�ji'l
By:
Date:
Kent Mills
v...uan o
Universal Surety
PCO 064
1/21/2014
CM
$ 125.00
1 $
- MHR
OHP
15.00%
$
Subtotal
$
Subcontractor
$
(133,245.70) LS
OH&P
5.00%
$
-
Subtotal
$
(133,245.70)
Bond
1.00%
$
Insurance
$
3.55 $
Total Costs
$
(133,245.70)
Adjustment
$
Time Extension
0 Calendar Days
Total Cost Increase
$
(133,245.70)