HomeMy WebLinkAboutCHANGE ORDER - BID - 7332 MAX BRT PROJECT (13)CHANGE ORDER N0.22
PROJECT TITLE: Mason Corridor - MAX BRT
CONTRACTOR;. Concrete Express, Inc.
PROJECT,NUMBER: 7332 (CEI project no. 12-009)
PURCHASE ORDER NO.: 9124039 -
DESCRIPTION: Partially reconciles BNSF Flagging with Concrete Slab (SSC 40 to 20)
Reason for change:
See attached Exhibit to this change order.
2. Description of Change:
See attached Exhibit A to this change order:
3. Change in Contract Cost: $
4. Change in Contract Time: See attached Exhibit A
TOTAL APPROVED CHANGE ORDERS
$ 3,393,553.63
TOTAL PENDING CHANGE ORDERS
$
TOTAL THIS CHANGE ORDER
$ �—
TOTAL % OF ORIGINAL CONTRACT, THIS C.O.
'2 /0
TOTAL 9/6OF ORIGINAL CONTRACT, ALL C.O.'S
—1;0t4%
ADJUSTED CONTRACT COST
$35,280,432.57
(Assuming all change orders approved)
ACCEPTED
Contractor's Representative
REVIEWED BY:
Construction Manager .
APPROVED BY:
City Project Manag
APPROVED BY:
Director of Infrast re Service
APPROVED BY:
Purchasing Agent over $60,000
c
DATE: Ib
DATE:
' DATE:
DATE:
cc: City Clerk. Architect
Contractor .Engineer
Project File Purchasing
DATE:
.ma>c
CHANGE ORDER NO. 22
Exhibit A
Project: Mason Corridor — MAX BRT
Project No. 7332 (CEI project #12-009)
Date: January 29, 2014
MAX Field Construction Office
3000 South College Ave., Suite 201
Fort Collins, CO 80526
fcgov.com/maxconstruction
Description of Change:
This change order reconciles costs withinConcrete Express' contract using offsetting savings from the BNSF
Flagging force account•to reconcile the Concrete Slab (Special) line item. This internal change to the CEI purchase
order reconciles contract value between two business units and'SCC codes. Please reference the summary
provided as attached and below. This change order also reconciles CEI's contract time for the remainder of the
MAX BRT contract.
Change in Contract Value:
The contract value is unchanged. Please reference the table below.
C_ontracttVal
uet_Cha_nge
SCC
Item
Description
Bid
Installed
Bid Contract
in Place
Contract
Difference
Number
Quantity
Quantity
Value
Value
601-.
Concrete
20.01
03100
Slab
955 SY
1,713.30
$272,175.00
$488,290.50
-$216,115.50
Special)
700-
F/A 04
40.08
70042
Railroad
-
-
$1,752,000.00
$1,112,724.49
$639,275.51
Flagging
SCC
Item
Description
Contract Amount
Line Item
Number
Change
Remainder
20.01
601-03100
Concrete Slab
+$216,115.50
$0.00
(Special)
40.08
700-70042
F/A 04 Railroad
-$216,115.50
$423,160.01
Flagging
Line item 700-70042 is being reduced by $216,115.50 to reconcile line item 601-03100. As such, the balance for
line item 700-70642 will be $423,160.01.
Change in Contract Time:
The contract time and agreement terms are hereby changed as outlined below.
The MAX Project Bid #7332 contract documents; Section 00520 — Agreement, Article 3, Part 3.2 Liquidated
Damages is hereby modified as follows.
1) Substantial Completion:
Modify the first paragraph as follows:
Delete:
INFINITE
NOW
Page 1, of
Replace with:
Two Thousand Dollars ($2, 000) for each calendar day or fraction thereof that expires after February 24, 2014 for
Substantial Completion Milestone 3.
Substantial Completion Milestone 3 shall be defined as completion of the MAX BRT ITS communications
systems including installation of all ITS components in each station ICON, and materials provided for the South
Transit Center and Transfort Maintenance Facility. The fiber optic communications backbone shall be
complete, communications cabinet installation complete, all components installed and ready for testing
including but not limited to UPS, firewall, environmental monitors, variable message signs, LCD signs,
switches, panels, call boxes, public address system, cameras, and media converters. This milestone shall also
include installation of all access gates, control wiring and gate communications from the South Transit Center
west entrance (STA 8+26) to Maple Street (STA 2268+00).
Five Thousand Dollars ($5, 000) for each calendar day or fraction thereof that expires after March 15. 2014 for
Substantial Completion Milestone 4.
Substantial Completion Milestone 4 shall be defined as completion of the BRT guideway paving and flatwork.
The guideway shall be accepted and ready for vehicle testing.
Twenty Thousand Dollars.($20, 000) for each calendar day or fraction thereof that expires after March 31 w14 for.,
Substantial Completion Milestone 5.
Substantial Completion Milestone 5 shall be defined as completion of the all MAX BRT project components
(except landscaping and irrigation) including all stations and station finishes, lights, light poles, beacons,
striping, signage, fencing, and guardrail. The Owner shall have beneficial use of the entire project by Milestone
5.
....
Four Thousand Dollars ( $4, 000)for each calendar day or fraction thereof that expires after May 31. 2014 for
Substantial Completion Milestone 6.
Substantial Completion Milestone 6 shall be defined as completion of the all MAX BRT project landscaping and
irrigation components as defined in the contract documents.
2) Final. Acceptance:
Modify the first paragraph as follows:
Delete:
Replace with:
After Substantial Completion of Milestone 6, Two Thousand Dollars ($2,000.00) for each calendar day or. fraction
thereof that expires after the thirty (30) calendar day period for Final Payment and Acceptance.
Final Acceptance of the MAX BRT project shall be defined as all work complete including any identified punch
list items. The project shall be fully complete and ready for Final Acceptance.
Page 2 of 3
Contract times for the MAX Project are outlined below.
The contract times for the MAX BRT project are hereby modified as outlined above and below. The overall MAX
BRT Project contract times and revised milestones are summarized below.
ContractTlme:Summary:r . P
Description
Contract Date
Modified Contract Date
Substantial Completion Milestone 1;
Complete
Complete
(Mason Grade Separation CO#5)
Substantial Completion Milestone 2:
(Mason Grade Separation CO#5)
February 28, 2014
Unchanged from CO #15
Final Acceptance:
(Mason Grade Separation CO#5)
March 31, 2014.
Unchanged from CO #15
Substantial Completion Milestone 3:
No original contract
February 24,2014
(BRT Project through CO#22)
date
-
Substantial Completion Milestone 4:
No original contract
March 15, 2014
(BRT Project through CO#22)
date
Substantial Completion Milestone 5:
No original contract
March 31, 2014
(BRT Project through CO#22)
date
Substantial Completion Milestone 6:
No original contract
May 31, 2014
(BRT Project through CO#22)
date
Final Acceptance
(BRT Project through CO#22)
Modified from below
June 30, 2014
Revised Substantial Completion Date
Febhanged
ebruary 11, 2014
as provided above
(BRT Project through CO #12)
through milestones 3-6
Revised Final Acceptance Date
(BRT Project through CO #12):
March 13, 2014
Changed as provided above
Page 3 of 3
Page:
Sales Order
Beacon Athletics
8233 Forsythia Street, #120
Middleton, WI 53562
BERCON
Order Number: 0242815
HT H L E T I C 5
�-.� .
Order Date: 2/21/2014
(800) 747-5985
Salesperson: SUE
visit our website at bM6nath�cs cotn
Customer Number: B80521
Sold To;:
Ship To:
FT COLLINS PARKS DIVISION
RICK JORDAN
ACCOUNTS PAYABLE
FT COLLINS PARKS DIVISION
413 S BRYAN AVE
413 S BRYAN AVE
FORT COLLINS, CO 80521
FORT COLLINS, CO
80521
Project name:
Customer P.O y - Ship VIA
F.O.B,,
Terms
BEST
NET 30
Item Number Unit Ordered
Shipped
Back Order
-
Price
-- --
Amount
301-105-430 EACH
14.0
0.0
0.0
7.0000
98.00
GROUND SLEEVE
DIGOUT TOOL
301-675-760 EACH
2O.0
0.0
0.0
5.0000
100.00
SQUARE RUBBER PLUG 12916575
SINGLE PLUG
SCHUTT
220-525-260 EACH
3.0
0.0
0.0
69.0000
207.00
TAMP 10" STEEL
HANDLE, RED
240-100-150 EACH
1.0
0.0
0.0
349.0000
349.00
STREAMLINER 353 W/PNEUM WHL
STRM353P
205-100-300 EACH
1.0
0.0
0.0
199.0000
199.00
DM6 DRAG MAT V X 3'
205-100-500 EACH
1.0
0.0
0.0
139.0000
139.00
PRO RIGID DRAG MAT, 48" W X 18" L
335-675-179 EACH
11.0
0.0
0.0
105.0000
1,155.00
HOLLYWOOD DBL STANCHION PITCHING RUBBER, 6" X 24" (#LBMPR224-12920704)
INCLUDES DOUBLE -STANCHION ANCHOR
335-675-199 EACH
2.0
0.0
0.0
75.0000
150.00
SCHUTT 4-SIDED PITCHING RUBBER (12808500 - SPR-4SO)
- REGULATION SIZE 6" X 24"
- PVC TUBE INSERT
230A30-110 EACH
3.0
0.0
0.0
85.0000
255.00
MEASURING TAPE 300
FT
230-105-009 EACH
4.0
0.0
0.0
69.0000
276.00
330' FIBERGLASS
MEASURING TAPE
220-525-370 EACH
2.0
0.0
0.0
92.0000
184.00
TOOLITE SIFTING
SCOOP SHOVEL
301-105-070 SET
8.0
0.0
0.0
209.0000
1,672.00
MAJOR LEAGUE BASE SET(3) 175-MLB
W/UNIV STANCHION, BOLCO,
NO ANCHORS OR PLUGS INCLUDED
240-100-190 EACH
1.0
0.0
0.0
399.0000
399.00
STREAMLINER70P W/PNEUM WHLS
STRM70P
Continued
Page:
Beacon Athletics
8233 Forsythia Street, #120
Middleton, WI 53562
(800)747-5985
Sold Toi
FT COLLINS PARKS DIVISION
ACCOUNTS PAYABLE
413 S BRYAN AVE
FORT COLLINS, CO 80521
Sales Order
BEACON,
i THLETlC5
visit our website at deacoiioth a lcs.com
Ship To:
Order Number:
0242815
Order Date:
2/21/2014
Salesperson:
SUE
Customer Number:
B80521
RICK JORDAN
FT COLLINS PARKS DIVISION
413 S BRYAN AVE
FORT COLLINS, CO 80521
Project name:
Customer P.O. Ship VIA F.O.B. Terms
BEST NET 30
Item Number Unit Ordered Shipped Back Order
Price
Amount
22CF100-010 EACH 2.0 0.0 0.0
99.0000
198.00
DELUXE OVERSEED
ENHANCING TOOL
220-100-140 EACH 2.0 0.0 0.0
135.0000
270.00
LEVEL BOARD
54" WIDE HEAD WITH STAINLESS STEEL CUTTING EDGE
225-740-210 EACH 6.0 0.0 0.0
19.0000
114.00
ECONOMY NOZZLE 1"
IPT Thread
/DISC-S
461.20-
FREIGHT ADJUSTMENT
50% DISC ON FRT DUE TO ORDER SIZE
Sign up for the Beacon Newsletter to receive product information, safes and specials, field tips,
Net Order:
5,303.80
demonstration videos and more.
Freight:
922.40
Sales Tax:
Go to httn.//beaconathletics.com/beacon-newsletted to sign up.
'
Order Total:
6,226.20