Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 7291 GEOTECHNICAL TESTING SERVICES (11)WORK ORDER PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND CTL Thompson Inc. DATED: February 19, 2014 Work Order Number: 1-254902108-14 Purchase Order Number: 1 Project Title: Prospect Road / New Mercer Ditch Bridge Project Original Bid/RFP Project Number& Name: 7557 Commencement Date: February 20, 2014 Completion Date: May, 2014 Maximum Fee: (time and reimbursable direct costs): $8,070.00 Project Description:. Provide material testing for Prospect/ New Mercer Bridge Replacement Project . Scope of Services: See attached scope.of services. Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event.of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of five (5) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Professional a N M-2 M51 By: 14- r- Project Cityf F oort C Manage Date: ?- r I t q r 1 L/ By: Gerry Paul Director of Purchasing and Risk Management (over $60,000.00) Date: February 13, 2014 City of Fort Collins Engineering Department 281 N. College Avenue P.O. Box 580 Fort Collins, Colorado 80522-0580 Attention: Mr. Mark Laken Subject: Fee Estimate for Construction Observation and Materials Testing Services W. Prospect Road Bridge Replacement Fort Collins, Colorado Fee Estimate No. FC-14-0055 At your request, CTLIThompson, Inc. is pleased to provide this fee estimate for Construction Observation and Materials Testing services for the W. Prospect Road Bridge Replacement project in Fort Collins, Colorado. We understand testing for this project should be performed in accordance with City of Fort Collins standards and specifications. We reviewed the plans provided by the City of Fort Collins dated September 9, 2013 in preparation of our proposal. We understand that the city will use our estimate for the basis of establishing a budget for the project and to issue a purchase order for our services. Our estimated scope of services and associated fees were prepared according to the terms and conditions of our professional -services agreement with the City of Fort Collins and are presented below. Earthwork: Compaction testing will be required for box culvert subgrade, culvert backfill, wingwall subgrade, wingwall backfill, sidewalk subgrade, curb subgrade, pavement subgrade, and aggregate base course. We estimate a total of 18 site visits will be necessary. Engineering Technician 18 days x 2 hrs/day x $60/hr $2,160.00 Standard Proctor 3 tests x $80/ea $240.00 Atterberg Limits 3 tests x $60/ea $180.00 Gradation 3 tests x $70/ea 2$ 10.00 Subtotal: $2,790.00 351 Linden Street I Suite 140 1 Fort Collins, Colorado 80524 Telephone:970-206-9455 Fax:970-206-9441 Concrete Testing: Concrete testing will be required for the box culvert slabs, walls, and wingwalls, column footings, sidewalk, curb and gutter, driveway, and pavement. We estimate 24 concrete tests consisting of 5 cylinders each will be necessary. We further estimate we will be requested to test the physical properties, of the concrete for the first 2 trucks, of each pour. Concrete Cylinders 24 tests x $160/test $3,840.00 Additional Cylinders 24 cyls x $10/cyl $240.00 Time to test extra trucks 24 hours x $50/hour $1,200.00 Subtotal: $5,280.00 TOTAL ESTIMATED FEE: $8,070.00 We would also be available to observe the reinforcing steel or structural welding/bolting if requested. It should be emphasized that this estimate is based upon assumptions of actual quantities and contractor's schedule. The fee will be charged only for the actual hours and unit rates presented for tests and observations requested by the owner, contractor or subcontractors who schedule the services. If we can be of further assistance, please contact us at your convenience. Very truly yours, CTL I THOMPSON, INC. Heather Grubb Field Department Manager 2 CITY OF FORT COLLINS W. PROSPECT ROAD BRIDGE REPLACEMENT CTL I T FEE ESTIMATE NO. FC-144M