Loading...
HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 91411951_/ // ?5� WORK ORDER PURSUANT TO. AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND, AECOM DATED: February 14, 2104 Work Order Number: 1-254902105-14 Purchase Order Number: Project Title: Arthur bitch Replacement Project at Mountain Avenue Original Bid I - Project Number & Name: Arthur Ditch Replacement Project at Mountain and, Myrtle Commencement Date: January 27, 2014 Completion.Date: June 2.0, 2014 Maximum Fee: (time and reimbursable directcosts): $29,930.00 Project Description: Provide design services and construction observation services'for.the Arthur Ditch Replacement Project at Mountain Avenue. Scope of Services: See.attached scope of services. Professional agrees to perform the services identified above and on the attached forms .in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity "in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of five (5) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Professional By: Date. / y' z o r City of rt ollins 1 By: { fL(ist Project anager Date: By: Gerry Paul Director of Purchasing and Risk Management (over$6o,000.00) Date: February 10, 2014 ACOM Scope of Service City of Fort Collins Arthur Ditch CBC Replacement Construction Management Services Additional Work Overview Several changes have been requested by the City and new work items will be required that were not part of the original scope and fee for the project. Following is a rough breakdown of the revisions and additional work that has been requested. It is assumed this work will occur over a 4 month timeline. Task 1— Project Coordination/Data Collection 1.1 Project Coordination and Management Activities Additional project management and coordination effort is required due to the increased work and requested revisions. Task 2 —Additional Preliminary Design No additional work required. Task 3 —Re-Design Efforts at Mountain Avenue AECOM will be required to perform re -design services that were required at the Arthur Ditch Reconstruction at Mountain Avenue. Project construction limits confirmed in the advertisement plans need to be reduced to minimize any potential conflicts with adjacent property owners. The following sections describe the anticipated level of additional effort required. 3.1 Roadway Plaits. This work requires design development and redesign efforts with the City to identify project solutions at the Mountain Avenue location. Plan revisions in the removal and roadway plans are anticipated. 3.2 Grading Plaits This work requires design development and redesign efforts with the City to identify grading solutions at the Mountain Avenue location. Plan revisions in the grading plans are anticipated. 3.3 Structure Transitions. This work requires design development and redesign efforts with the City to identify structural solutions at the Mountain Avenue location. This work requires adjustments to the pre - approved precast concrete box sections to identify reconstruction requirements of the precast sections adjacent to the cast -in -place transition box sections and analysis at the sidewalk location to confirm a separate or integral solution. Task 4 —Post Design Services 4.1 Review of Shop Drawings Shop drawing review was completed under our previous task orders with the City. No additional work is required. Scope of Service, Construction Management Arthur Ditch CBC Replacement s February 10, 2014 4.2 Construction Services When requested by the appropriate Fort Collins/PM, AECOM shall continue to provide the field observation for structure -critical activities. This includes limited technical assistance on an as -needed basis. This service shall include, but not be limited to, the following: responding to questions in the field that arise relative to the plans, details or special provisions; and providing engineering and drafting services for design revisions required due to changes in construction or field conditions. Assume 4 hours per month over a 4 month time. 4.3 Requests For Information (RFIs). AECOM staff will support Fort Collins by responding to general field questions and/or design related RFIs corresponding to the project construction activities. AECOM will prepare and submit RFI responses and maintain a RFI log of submitted construction questions. Assumes up to 32 hours required. 4.4 Post Design Services. AECOM staff will support Fort Collins by developing post design services to the advertisement plans as a result of requested changes or discovered field changes. Assumes up to 20 hours required. 4.SAs-Built Plans. AECOM staff will make final plan revisions to the field construction plan set so that field changes or quantity updates reflect the final conditions. End of Scope Page 2 Proposal for Arthur Ditch CDC Replacements City of Port Collins - Mountain Avenue and Myrtle Street Date Pehrnary 10, 2014 M/ II'a)' L..".r....:_.:.... PAt ,4 11" Rnndu,ur I Cadd I S9raewir I Adminhiralinn Project Cadd AdminisdntAe Employee Classifscutim, Menace, Taskblunuger, Fisgiucs,I Alunagcr Eng;neerd Asslrtaat .Sub Tnuel .Vub Cost Nara• Loris Jeffrey Gary Moji Fergru»n Jim Slab, Frerlersl .Sean {.asiner Uegun Feammn s Ids S 165 S 75 S 100 5 75 5 60 Tusk I —Project Canrdinatins✓Addiiierul Data Collection 1.1 ProJecr COordiu0limr nndA4uMrgenrcntAnirines 20 8 28 S 3,780 Tusk 2—Addiennal Pmliminory Design 0 S - Task 3 - ReDesign Effora at hfauutaiaArcnue 3.1 Routl"w Plea 4 20 12 36 S 5,160 3.2 Grmkng Plans 4 20 24 48 S 6,360 3.3 Sinrnum 1•mn111lons 4 24 28 S 3,060 Task 4- Pusi Design S'ercices 4.1 ReWcu. ofShnp Dmangs 0 S - 4.2 Constr..Imu Seniors 2 2 4 8 16 5 1,560 Assume 4 h6Anonm 4.3 Requests,forRfnnnnfion 12 12 8 32 $ 3.480 Assume 6hr one 4.41bst-Design.l'enicrs 4 8 8 20 $ 1.860 Assume 20lrrs 4.5 As -Ruin Drrmings 2 4 32 38 $ 4,190 Snnunnq Task l— Prrfrcl Cnurditmtimr AddillMrallMta ('allrcnorr 20 0 0 0 0 8 28 $ 3.780 7osk2—Addirimail Pelimivan, Design 0 0 0 0 0 0 0 $ - Task3- Relh•.dgn I. -forts atAlmeu jr, AlYrlae 12 40 0 60 0 0 112 S 14,580 71,sk 4- Pail Design Seniees 4 22 24 32 24 0 106 S 11,090 Total Harms 36 62 24 92 24 6 246 S 29.450 7•otal liaecl Lnhar S 29,450 UD(ls (we lnrh u) S 380 Total Costs $ 29,930 Other U/rrcl Cons Repmducllun priming S 100 Pnslage;EspressMail S 45 Mileage S 235 Asaumefhmatrips(140m1@5.56J 7'atal 0M.'s S 380