Change Order Form
PROJECT TITLE: Arthur Ditch CDC at Min. & Myrtle Bridge Rpcimt
PROJECT NUMBER: 254902105 (Bid #7558)
CONTRACTOR: Zak Dirt (PO #9136003)
CHANGE ORDER NUMBER: 2
In.preparing change orders show In order as separate numbered paragraphs the following:
1. Reason for change. 2. Description of change.
3. Change In contract cost. 4. Change In contract time.
1.&2. See attached Invoice for details
3. The contract cost will Increase by $4,125.67
A. There will be no change In contract time.
ORIGINAL CONTRACT COST $924,949.05
TOTAL APPROVED CHANGE ORDERS $50,013.00
TOTAL PENDING CHANGE ORDERS $0.00
TOTAL THIS CHANGE ORDER $4,125.67
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
ACCEPTED BY:
REVIEWED BY:
SUBMITTED BY:
APPROVED BY:
0,45%
5.85%'
DATE: all, /..
DATE: 02— - 1 1 - IiLl
TE:
APPROVED BY: v DATE:
(Purchasing Agent over $60,000)
x: Contractor
Purchasing
Project Fie
$979,087.72
CHANGE ORDER NO.x
ar.
Itom1 '��_
_ _Itam0eacdpdon. _ _ _ �Lu
unit ia
:202
REMOVAL OF TREE
EA$2,000.00
E2,DDO.00
2.00
34000.00
1.00
$2 000.02
202REMOVAL
OF ASPHALT MAT
SY
$4.90
$11,245.50
2380.00
$11662.00
85.00
5416.50
3
CO2-005
TREE TRIMMING MYRTLE STREE
LS
$125.00
$0.00
1.005125.001004
CO2-006
2"CONDUIT
LS
5584.17
50.00
100
5584.17
1.00
E$84,17
5
CO2 �007
SANITARY FACILITIES
LS
51,000.00
E0.00
1.00
E1,000.00
100
1 51,00G,G0
54,125.67
lufti0catlon
rC0 Reason -
1 Cost to remove additional tree We dose to emsbng Culvert, pmIllbiling a safe working envimnmenl
2 Cost to remove additional asphalt pavOMCnt to facilitate constmcllon
3 Cost to tdm existing tree. Work originally schedded to Da perfornied by Cityforces, out due to smeaming cornet; mnUaGor perfornied
4 Atltlitlonal conduit t0 mNtle means to clots below the box el M rtle for utilities
5 The addition of sanitary facilities for both work stet