Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7558 ARTHUR DITCH CBC REPLACEMENT AT MOUNTAIN AVE & MYRTLE STREET (2)Planning, Development&Transportation City of Engineering pbAr u 281N6dh Cotlege Avenue ®� � � 0.0.Box 660 Foil ClCO e05220580 ngineering 970.221.6605 970.221.6378 - fax Change Order Form PROJECT TITLE: Arthur Ditch CDC at Min. & Myrtle Bridge Rpcimt PROJECT NUMBER: 254902105 (Bid #7558) CONTRACTOR: Zak Dirt (PO #9136003) CHANGE ORDER NUMBER: 2 In.preparing change orders show In order as separate numbered paragraphs the following: 1. Reason for change. 2. Description of change. 3. Change In contract cost. 4. Change In contract time. 1.&2. See attached Invoice for details 3. The contract cost will Increase by $4,125.67 A. There will be no change In contract time. ORIGINAL CONTRACT COST $924,949.05 TOTAL APPROVED CHANGE ORDERS $50,013.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $4,125.67 TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED BY: REVIEWED BY: SUBMITTED BY: APPROVED BY: 0,45% 5.85%' DATE: all, /.. DATE: 02— - 1 1 - IiLl TE: APPROVED BY: v DATE: (Purchasing Agent over $60,000) x: Contractor Purchasing Project Fie $979,087.72 CHANGE ORDER NO.x ar. Itom1 '��_ _ _Itam0eacdpdon. _ _ _ �Lu unit ia :202 REMOVAL OF TREE EA$2,000.00 E2,DDO.00 2.00 34000.00 1.00 $2 000.02 202REMOVAL OF ASPHALT MAT SY $4.90 $11,245.50 2380.00 $11662.00 85.00 5416.50 3 CO2-005 TREE TRIMMING MYRTLE STREE LS $125.00 $0.00 1.005125.001004 CO2-006 2"CONDUIT LS 5584.17 50.00 100 5584.17 1.00 E$84,17 5 CO2 �007 SANITARY FACILITIES LS 51,000.00 E0.00 1.00 E1,000.00 100 1 51,00G,G0 54,125.67 lufti0catlon rC0 Reason - 1 Cost to remove additional tree We dose to emsbng Culvert, pmIllbiling a safe working envimnmenl 2 Cost to remove additional asphalt pavOMCnt to facilitate constmcllon 3 Cost to tdm existing tree. Work originally schedded to Da perfornied by Cityforces, out due to smeaming cornet; mnUaGor perfornied 4 Atltlitlonal conduit t0 mNtle means to clots below the box el M rtle for utilities 5 The addition of sanitary facilities for both work stet