HomeMy WebLinkAboutBID - 7579 RIVER RESTORATION AT WOODWARD TECHNOLOGY CENTER LOT 4 (2)ADDENDUM NO. 2
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of BID 7579: River Restoration at Woodward Technology Center Lot 4
OPENING DATE: 3:00 PM (Our Clock) December 10, 2013
To all prospective bidders under the specifications and contract documents described
above, the following changes/additions are hereby made and detailed in the following
sections of this addendum:
1. The Opening Date has been changed to 3:00 PM (our clock) on December 10, 2013.
2. Additional Information
Exhibit 1 – Questions & Answers
Exhibit 2 – Clarifications & Revisions
Exhibit 3 – Typical Pedestrian Bridge Section
Exhibit 4 – Boring Logs
Please contact John Stephen, CPPO, LEED AP, Senior Buyer at (970) 221-6777 with
any questions regarding this addendum.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN
STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS
ADDENDUM HAS BEEN RECEIVED.
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
fcgov.com/purchasing
Addendum 2
7579 River Restoration at Woodward Technology Center Lot 4
Page 1 of 8
EXHIBIT 1 – QUESTIONS & ANSWERS
A. Questions regarding the pedestrian bridge - see attached Exhibit 3 - Typical
Pedestrian Bridge Section and the answers below:
1. Q: What is the bridge width?
A: 10’ clear width, rubrail to rubrail.
2. Q: What type of safety system is required?
A: Vertical pickets with 4” max gap
3. Q: Are there any other attachments such as rub rail, hand rail or toe-plate on
the bridge?
A: Rubrail and steel toe-plate required.
4. Q: Who is to supply the Mag Particle testing or any other inspections required
on the bridge?
A: The manufacturer provides with a COC.
B. Q: Please confirm the milestones and dates when the phase 1 contractor will be
done with the excavation on this project site.
A: The project site earthwork will be completed by Woodward’s contractor
in December 2013, prior to start of work for the River Restoration project.
C. Q: Can the anticipated delivery dates of the owner provided plantings be provided.
A: Contract grown plant material is scheduled for delivery at the end of
June 2014.
D. Q: In the provided soils report from EEC, there are 3 boring locations in the work
limits. They are B-1, B-9, and B-12. All these boring logs are missing from the
Geotech report provided. This information would be helpful to understand
groundwater depths, subgrade materials, etc.
A: Additional soil boring logs 1, 9, and 12 are attached by exhibit for your
use.
E. Q: The type of valve specified for the master valve does not come in a 4” size. What
should we use?
A: There is no master valve called out on the plans, the master valve detail
shall be disregarded.
F. Q: The Nibco T-136 gate valve does not come in a 4”, 6” or 8” size. What should be
used?
A: The Contractor shall use Matco model 10RT isolation gate valves on all
4", 6" and 8" mainline pipe.
Addendum 2
7579 River Restoration at Woodward Technology Center Lot 4
Page 2 of 8
G. Q: Where will power be able to be drawn from for the irrigation controller?
A: Power source is available from an existing City of Fort Collins
transformer. Coordinate electrical power to the controller with the Owner’s
Representative. Owner’s Representative will provide electrical design.
H. Q: Will we need to as-built the final grades completed for the unclassified excavation
portion of the project because this work is in a floodplain?
A: The Contractor is required to complete the topsoil placement and finish
grading as per the requirements of the contract, but will not be required to
provide an as-built survey of final grades.
Addendum 2
7579 River Restoration at Woodward Technology Center Lot 4
Page 3 of 8
EXHIBIT 2 – CLARIFICATIONS & REVISIONS
I. SECTION 00100 IINSTRUCTIONS TO BIDDERS – In Item 3.0 the following section
has been added:
3.5 CONTRACTOR QUALIFICATIONS
General Contractor Qualifications:
General Contractor shall have completed at least four (4) projects of similar size,
scope and complexity in the past five (5) years under similar guidelines to the
ones provided herein.
Contractor shall hold the appropriate State and/or local licenses to perform the
work in the local jurisdiction.
Contractor shall submit a list of reachable references, including name, telephone
number, and address for persons who can verify successful completion of work
including bank stabilization, concrete flatwork, landscape projects, and wetlands
planting of similar size, scope and complexity. Positive verification results from
references shall be a condition precedent to award of this contract.
Superintendent Qualifications:
The Contractor’s superintendent shall be a competent, experienced person
employed by the Contractor.
The Contractor shall submit the proposed superintendent’s resume with the
qualifications package as part of the bid documents.
The superintendent shall be assigned to this contract full-time until the job
reaches substantial completion.
The superintendent must have completed at least 2 similar projects in the past 5
years.
II. REVISIONS TO PROJECT SPECIAL PROVISIONS
a. REVISION SECTION 207 TOPSOIL - The following revision has been added:
Subsection 207.03 shall include the following:
Grade placed topsoil to a smooth, uniform surface to within one-tenth of one foot
of finish elevation. Roll and rake, remove ridges, and fill depressions to meet
finish grades.
Addendum 2
7579 River Restoration at Woodward Technology Center Lot 4
Page 4 of 8
EXHIBIT 3 - TYPICAL PEDESTRIAN BRIDGE SECTION
Addendum 2
7579 River Restoration at Woodward Technology Center Lot 4
Page 5 of 8
DATE:
RIG TYPE: CME45
FOREMAN: DG
AUGER TYPE: 4" CFA
SPT HAMMER: MANUAL
SOIL DESCRIPTION D N QU MC DD -200
TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF
TOPSOIL & VEGETATION _ _
SILTY CLAYEY SAND (SM/SC); brown 1
_ _
SAND & GRAVEL (SP/GP) 2
brown _ _
medium dense to dense 3
_ _
4
_ _
SS 5 22 -- 7.0
_ _
6
_ _
7
_ _
8
_ _
9
_ _
SS 10 37/7" -- 7.1
_ _
11
apparent cobbles _ _
12
_ _
13
_ _
14
_ _
SS 15 49 -- 11.3
_ _
16
_ _
SILTSTONE/SANDSTONE, grey 17
BOTTOM OF BORING DEPTH 17.0' _ _
18
_ _
19
_ _
20
_ _
21
_ _
22
_ _
23
_ _
24
_ _
25
_ _
Earth Engineering Consultants
LEMAY/LINCOLN CAMPUS
PROJECT NO: 1122080 DATE: OCTOBER 2012
RIG TYPE: CME45 WATER DEPTH
FOREMAN: DG
AUGER TYPE: 4" CFA
SPT HAMMER: MANUAL Not Reported
D N QU MC DD A-LIMITS -200 SWELL-CONSOLIDATION
(feet) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % - 500 PSF
TOPSOIL & VEGETATION _ _
SILTY CLAYEY SAND (SM/SC) 1
_ _
SAND & GRAVEL (SP/GP) 2
brown _ _
dense to medium dense 3
_ _
4
_ _
SS 5
32/9" -- 4.3
_ _
6
_ _
7
_ _
8
_ _
9
_ _
SS 10
25 -- 10.5
_ _
11
_ _
12
SILTSTONE / SANDSTONE / CLAYSTONE _ _
grey 13
_ _
CS 14
50/4.5" 9000+ 13.3 114.2
BOTTOM OF PIEZOMETER DEPTH 14.0' _ _
15
_ _
16
_ _
17
_ _
18
_ _
19
_ _
20
_ _
21
_ _
PIEZOMETER LEGEND 22
_ _
Concrete Mix - 4" Diameter Lockable Steel Cover 23
2-Inch Diameter Flush Threaded- Schedule 40 PVC riser pipe _ _
Bentonite Seal 24
2-Inch Dia. Flush Threaded- Schedule 40 PVC Slotted pipe - 5' _ _
Silica Sand and/or Sand & Gravel Cave-In 25
PROJECT NO: 1122080 DATE: OCTOBER 2012
RIG TYPE: CME45 WATER DEPTH
FOREMAN: DG
AUGER TYPE: 4" CFA
SPT HAMMER: MANUAL Not Reported
D N QU MC DD A-LIMITS -200 SWELL-CONSOLIDATION
(feet) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % - 500 PSF
TOPSOIL & VEGETATION _ _
SILTY CLAYEY SAND (SM/SC); brown 1
_ _
SAND & GRAVEL (SP/GP) 2
brown _ _
dense 3
_ _
4
_ _
SS 5
49 -- 0.8
_ _
6
apparent cobbles _ _
7
_ _
8
_ _
9
_ _
SS 10
37 -- 10.9
_ _
11
_ _
12
SILTSTONE / SANDSTONE / CLAYSTONE _ _
brown / grey CS 13
31/5" 4000 18.6
BOTTOM OF PIEZOMETER DEPTH 13.0' _ _
14
_ _
15
_ _
16
_ _
17
_ _
18
_ _
19
_ _
20
_ _
21
_ _
PIEZOMETER LEGEND 22
_ _
Concrete Mix - 4" Diameter Lockable Steel Cover 23
2-Inch Diameter Flush Threaded- Schedule 40 PVC riser pipe _ _
Bentonite Seal 24
2-Inch Dia. Flush Threaded- Schedule 40 PVC Slotted pipe - 5' _ _
Silica Sand and/or Sand & Gravel Cave-In 25
_ _
Earth Engineering Consultants, Inc.
LEMAY/LINCOLN CAMPUS
FORT COLLINS, COLORADO
LOG OF BORING/PIEZOMETER B-12 SHEET 1 OF 1
PZ DETAILS
SAMPLE TYPE
START DATE 10/19/2012
FINISH DATE 10/19/2012 WHILE DRILLING 7.0'
GROUND SURFACE ELEV Not Reported 10/19/2012 N/A
TOP OF CASING ELEV. 10/22/2012 7.0'
SOIL DESCRIPTION
Addendum 2
7579 River Restoration at Woodward Technology Center Lot 4
Page 8 of 8
_ _
Earth Engineering Consultants, Inc.
N/A
LEMAY/LINCOLN CAMPUS
FORT COLLINS, COLORADO
LOG OF BORING/PIEZOMETER B-9 SHEET 1 OF 1
PZ DETAILS 10/19/2012
FINISH DATE
TOP OF CASING ELEV.
10/19/2012
10/22/2012 5.4'
SOIL DESCRIPTION
WHILE DRILLING 6.0'
GROUND SURFACE ELEV Not Reported 10/19/2012
SAMPLE TYPE
START DATE
Addendum 2
7579 River Restoration at Woodward Technology Center Lot 4
Page 7 of 8
FORT COLLINS, COLORADO
PROJECT NO: 1122080 OCTOBER 2012
LOG OF BORING B-1
SHEET 1 OF 1 WATER DEPTH
START DATE 10/19/2012 WHILE DRILLING 8.0'
FINISH DATE 10/19/2012 AFTER DRILLING N/A
SURFACE ELEV N/A 24 HOUR N/A
A-LIMITS SWELL
EXHIBIT 4 - BORING LOGS
Addendum 2
7579 River Restoration at Woodward Technology Center Lot 4
Page 6 of 8