Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 7291 GEOTECHNICAL TESTING SERVICES (9)WORK ORDER PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND CTL'rhlompson incorporated DATED: February 13, 2014 Work Order Number. CTL-400901811-14 Purchase Order Number: Project Title: Ke6hter and Timberline Turn Lane Improvements Original EMdIIRFP Project Number &.Narne; 7291 On -Call Geotechnical Testing Senti ices Commencern0rit Date: May 1, 2014 Completion Date- November 1, 2014: .Maximum Fee: (time and reimbursable, direct casts): Not to Exceed t6,obd,o0. Project Description.- Earthwork, Concrete and Asphalt Testing as required for two new right turn lanes; T6-"Wo*7 will be comPkete;d throug� the M! bn-'C . all Contract. Scope of Services:. See Attached Professional agrees to perform the Services identified above and on the attached forms 16 - - CityofFort Collin accordance with :the terms and conditions By: contained herein and in the Professional Services PioJect Managir Agreement between the prties. In the event of a conflict between or ambiguity in the.terms of the Date: Idl) :7 Professional Services Agreement and this work order (including the - attached forms) the Prqfession6l Services Agreement shall control, By'. Gerry Paul The attached forms consisting of Two L2) 0ages Director of Purchasing and Risk: Management are hereby accepted and incorporated herein, by (over $60, 000,09) this reference, and Notice to Proceed is hereby given. Date: - Professional By: IL( Date: 0 February 13, 2014 City of Fort Collins Engineering Department 281 N.'College Avenue P.O. Box 680 Fort Collins, Colorado, 80522-0580 Attention: Mr. Tim Kemp .Subject: Fee Estimate for Construction' Observation and Materials Testing Services Timberline Road &.Kechter Road Right Turn Lanes Fort Collins, Colorado Fee Estimate No. FC-14-0056 At your request, CTLIThompson, Inc., is pleased to,provide this fee estimate for Construction Observation: and,Materials Testing services for the Timberline Road &'Kechter Road Right Turn Lanes project in Fort Collins, Colorado. We understand testing forthis project should be performed In accordance with City of Fort Collins standards :and specifications. We, reviewed the plans provided by the City of Fort Collins dated February 11. 2013 in preparation of our proposal. We understand that the city will use our estimate for the basis of establishing a budget -for the project and to issue a purchase order for our services. Our estimated scope of services; and associated fees were prepared according to the terms and conditions of our professional services_ agreement with the City of Fort Collins and are presented below. Earthwork; Compaction testing will be required for sidewalk subgrade,-curb subgrade, pavement subgrade, and aggregate base course. We estimate a total of.12 site visits will be necessary: Engineering Technician 12 days x 2 hrs/day x $60/hr $1,440:00 Standard Proctor 2 tests x $80/ea. $160.00 Atterberg Limits 2 tests x $60/ea $120.00 Gradation 2 tests x'$70/ea $146.ob Subtotal: $1,860.00' Concrete Testing: Concrete testing will be required for the sidewalk, curb and gutter,,and ramps. We estimate 8 concrete tests consisting of 4.6ylinders each will be necessary. Concrete Cylinders 8 tests x,$160/test Subtotal: 351 Linden Street I Suite.140 1 Fort Collins, Colorado 80524 Telephone: 970-206-9455 Fax 970-206-9441 1 280.00 $1;280.00 roject'.will re dire 4 half days of a g halt compaction testing and 4 laboratory We estimate the pAsphalt Testincg- Compaction testing be required during asphalt placement. samples. Engineering Technician 4.days x; 4 hrs/day x $60/hr $960:00 Lab Density (Rice) 4 tests x $80/ea.. $320.00 AC ContentlGradation 4 tests x $150/ea $600.00 Subtotal: $1 880 00 TOTAL ESTIMATED FEE: $5,020.00 It should be emphasized that this estimate is based upon assumptions of actual.quantities and contractor's schedule.. The fee'will be charged only for the actual hours and unit rates presented for tests and observations requested by the owner, contractor or"subcontractors who schedule the services. _... If we can be of further assistance,''please contact us at your convenience_ Very truly yours, CTL I THOMPSON, INC. Heather Grubb Field Department -Manager `CITY OF FORT COLLINS 2 TIMBERLINE RD & KECHTER RD RIGHT TURN LANES CTLI T FEE ESTIMATE NO. FC-14-0056