HomeMy WebLinkAboutWORK ORDER - RFP - 7291 GEOTECHNICAL TESTING SERVICES (9)WORK ORDER
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
CTL'rhlompson incorporated
DATED: February 13, 2014
Work Order Number. CTL-400901811-14
Purchase Order Number:
Project Title: Ke6hter and Timberline Turn Lane Improvements
Original EMdIIRFP Project Number &.Narne; 7291 On -Call Geotechnical Testing Senti ices
Commencern0rit Date: May 1, 2014
Completion Date- November 1, 2014:
.Maximum Fee: (time and reimbursable, direct casts): Not to Exceed t6,obd,o0.
Project Description.- Earthwork, Concrete and Asphalt Testing as required for two new right turn lanes;
T6-"Wo*7 will be comPkete;d throug� the M! bn-'C . all Contract.
Scope of Services:. See Attached
Professional agrees to perform the Services
identified above and on the attached forms 16
- -
CityofFort Collin
accordance with :the terms and conditions
By:
contained herein and in the Professional Services
PioJect Managir
Agreement between the prties. In the event of a
conflict between or ambiguity in the.terms of the
Date: Idl) :7
Professional Services Agreement and this work
order (including the - attached forms) the
Prqfession6l Services Agreement shall control,
By'.
Gerry Paul
The attached forms consisting of Two L2) 0ages
Director of Purchasing and Risk: Management
are hereby accepted and incorporated herein, by
(over $60, 000,09)
this reference, and Notice to Proceed is hereby
given.
Date: -
Professional
By: IL(
Date:
0
February 13, 2014
City of Fort Collins
Engineering Department
281 N.'College Avenue
P.O. Box 680
Fort Collins, Colorado, 80522-0580
Attention: Mr. Tim Kemp
.Subject: Fee Estimate for Construction' Observation and Materials Testing Services
Timberline Road &.Kechter Road Right Turn Lanes
Fort Collins, Colorado
Fee Estimate No. FC-14-0056
At your request, CTLIThompson, Inc., is pleased to,provide this fee estimate for Construction
Observation: and,Materials Testing services for the Timberline Road &'Kechter Road Right Turn
Lanes project in Fort Collins, Colorado. We understand testing forthis project should be performed
In accordance with City of Fort Collins standards :and specifications. We, reviewed the plans
provided by the City of Fort Collins dated February 11. 2013 in preparation of our proposal.
We understand that the city will use our estimate for the basis of establishing a budget -for the
project and to issue a purchase order for our services. Our estimated scope of services; and
associated fees were prepared according to the terms and conditions of our professional services_
agreement with the City of Fort Collins and are presented below.
Earthwork; Compaction testing will be required for sidewalk subgrade,-curb subgrade, pavement
subgrade, and aggregate base course. We estimate a total of.12 site visits will be necessary:
Engineering Technician 12 days x 2 hrs/day x $60/hr $1,440:00
Standard Proctor 2 tests x $80/ea. $160.00
Atterberg Limits 2 tests x $60/ea $120.00
Gradation 2 tests x'$70/ea $146.ob
Subtotal: $1,860.00'
Concrete Testing: Concrete testing will be required for the sidewalk, curb and gutter,,and ramps.
We estimate 8 concrete tests consisting of 4.6ylinders each will be necessary.
Concrete Cylinders
8 tests x,$160/test
Subtotal:
351 Linden Street I Suite.140 1 Fort Collins, Colorado 80524
Telephone: 970-206-9455 Fax 970-206-9441
1 280.00
$1;280.00
roject'.will re dire 4 half days of a g halt compaction testing and 4 laboratory
We estimate the
pAsphalt Testincg- Compaction testing be required during asphalt placement.
samples.
Engineering Technician 4.days x; 4 hrs/day x $60/hr $960:00
Lab Density (Rice) 4 tests x $80/ea.. $320.00
AC ContentlGradation 4 tests x $150/ea $600.00
Subtotal: $1 880 00
TOTAL ESTIMATED FEE: $5,020.00
It should be emphasized that this estimate is based upon assumptions of actual.quantities and
contractor's schedule.. The fee'will be charged only for the actual hours and unit rates presented for
tests and observations requested by the owner, contractor or"subcontractors who schedule the
services.
_...
If we can be of further assistance,''please contact us at your convenience_
Very truly yours,
CTL I THOMPSON, INC.
Heather Grubb
Field Department -Manager
`CITY OF FORT COLLINS 2
TIMBERLINE RD & KECHTER RD RIGHT TURN LANES
CTLI T FEE ESTIMATE NO. FC-14-0056