HomeMy WebLinkAboutCHANGE ORDER - BID - 7529 ROOF REPLACEMENT AT DRAKE WASTEWATER TREATMENT PLANTCHANGE ORDER NO. 1 PROJECT TITLE: DWRF Roof Replacement Project CONTRACTOR: Douglass Colony Group, Inc P.O. NUMBER: 9135293 VENDOR NUMBER: 524939 CHARGE NUM BER: 15308.563040.6 DESCRIPTION In preparing change orders show i norder as separate numbered paragraphs the following: 1. Reason for change. 2. Description of change.. 3. Change i n contract cost. 4. Change i n contract time 1. Additional Work requested and liquidated damages 2. See attached 3.-$4,878.25 4.30 days (Weather + Requested) (Attach additional sheets as required) 6- ORIGINAL CONTRACT COST $306,088.80 TOTAL APPROVED CHANGE ORDERS $0.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER ($3,878.25) TOTAL % ORIGINAL CONTRACT, THIS CO: -1.28% TOTAL % OF ORIGINAL CONTRACT, ALL CaS: -1.28% ADJUSTED CONTRACT COST $302,210.55 (AssumingalI change orders approved) ACCEPTED BY: REVIEWED BY: (Water esburces and Trey en( Ops M an ger) APPROVED BY: _ (Purchasi ng Agent Over $30,000) DATE: / o2ai DATE: ZO 20/y DATE: •y 23 /y DATE: 0 DATE: CC: Purchasing NOTE: Signature of Contractor indicates Contractor Project File agreement hereroithin, induding any adjustment in contract sum or contract time. City 1 F6rt Collions /11�''- ,s4-> MEMORANDUM Date: January 27, 2014 To: File From: Link Mueller, Utilities Project Manage Utilities electric - stormwater - wastewater � water 700 Wood Street PO Box 580 Fort Collins, CO 80522 970.221.6700 970.221.6619 —fax 970.224.6003 — Too utilities@fcgov.com fcgov.com/utifiUes RE: DWRF Roof Replacement Project D-WRF-2013-11 Reconciliation Change Order The following information is provided as backup to this Changer Order: Owner-Requested/Changed Condition Changes a. Digester Building Scuppers — replaced north side scuppers in lieu of installing new drains interior to the building: $1, 121.25 and 4 days b. Additional work around corroded drains on the Digester and Dewatering Buildings: 3 days' c. Revisions to Boiler Vent Trap: 2`d"ays Sub Total: $1,121.25 9 days. 2. Liquidated Damages a. Days over Contract Coinpletion (10/31/13-12/31/13) 40 days b. Documented Weather Days - 21 days c. Changed Ordered Days - 9 days 10 days Sub Total Liquidated Damages (10 days x $500/day) = 45,000 Total Dollar Change to Contract = 43,878.25 LHM �D DOUGLASS I COLONY To: Dave Michaels Techniscan, Inc 1873 S.Bellaire Street Suite 1400 Denver, CO 80222-4358 Ph:303-329-0535 Fax:303-377-2740 Douglass Colony Group Inc Change Request Description: Add Collector heads and downspouts Number: 1 Date: 1213/13 Job: 50-050-2053 Drake WWTP Phone: Fax: We hereby propose to make the following changes: Bid #23 - Digester Facility - Furnish and install two new scuppers, collector heads and downspouts with inner lining. The total amount to provide this work is .................. (Please refer to attached sheet for details.) If you have any questions, please contact me at 303.288.2635. Submitted by: Kenneth Wickwar Douglass Colony Group Inc. Cc: Link Mueller (Ft. Collins Coloradoan) Approved by: Date: $1,121.25 Page 1 of 2 �D DOUGLASS I COLONY Douglass Colony Group Inc Total: Subtotal: $975.00 Markup $975.00 15.00% $146.25 Total: $1,121.25 Page 2 of 2