HomeMy WebLinkAboutCHANGE ORDER - BID - 7536 DIAGONAL WALK & STAGE IMPROVEMENTS FOR POUDRE RIVER PUBLIC LIBRARY DISTRICTCHANGE ORDER NO.4
PROJECT TITLE: Library Streetscape Improvements
CONTRACTOR: Hoff Construction
PROJECT NUMBER: 7536
PURCHASE ORDER NO.: 9135154
DESCRIPTION: (See below)
1. Reason for change:
.. ..... ......_--
The reason for this contract change Includes modification to both contract value and time based upon
work change directives issued during the construction contract. Additionally, the contract time is being
extended to account for the long lead time of electrical components and fixtures.
2. Description of Change' _
The description of the contract changes can be found in the attached work change directives which are
incorporated into this change order by reference.
i Work Change Directives included in this change order are: Work Change Directive 006revi.
This work change directive is summarized on the attached pending issues log.
1 f
I. Substantial completion is being extended and redefined as the completion of all installation and operation
l of electrical components Iof the work along the Library Diagonal..
f
3. Change in Contract Cost
4. Change in Contract Time 14 calendar days for substantial completion
Change in Contract Time. calendar days for final completion
UKIIJINAL GUN I KAC 1 GUS I
- $347;593.00'
TOTAL APPROVED CHANGE ORDER
$70,576.05
TOTAL PENDING CHANGE ORDER
$0.00
TOTAL THIS CHANGE ORDER
$ (360.69)
TOTAL % OF ORIGINAL CONTRACT, THIS C.O.
-0.10%
TOTAL%o OF ORIGINALCONTRA_CT, ALL C.O.'S
20:20%:
ADJUSTED CONTRACT COST1. .
$417;811.06
(AsSuminiil"ail change orders aooroved)
ACCEPTED BY: jy_ ['}��o�c.�
DATE:
Contractor's Representative,' -'
ACCEPTED BY:
DATE:
Library Representative
t REVIEWED BY:
T
DATE: 47
Project Manager J
APPROVED BY:
DATE:
Purchasing Agent over $60,000
cc: Purchasing Architect
Contractor Project File
dmilesco
Project and Construction Services
CHANGE ORDER NO. 4
SUPPORTING DOCUMENTATION
Project: Library Diagonal Walk Improvements
Project No. 7536
Date: January 30, 2014
Description of Change:
1315 Oakridge Drive - Suite 120
Fort Collins, CO 80525
970.204.1673 fax
ditescoservices.com
This change order changes the total value of the Story Tree Boulder In -Fill as it was billed on a time and materials
basis. The WCD 006rev1 provides a redction to the contract value as the value of time and materials were less than
anticipated. This work was authorized through Work change directive (WCD) 006rev1. WCD 006rev1 is hereby
incorporated by reference and included as attached. This Change Order also adds additional contract time to allow for
the long lead time in electrical component procurement.
Change in Contract Value:
The contract value is being decreased by $360.59. Please see attached pending issues log summary and work
change directive(s) as summarized in the table(s) below.
Work Change Directives
Item Number
Description
Contract Value
WCD006rev1
Story Tree Boulder In -Fill - Revised
-$360.59
Total Work Change Directives:
-$360.59
Total Contract Change - this change order
Total Change Order: $360.59
Change in Contract Time:
Contract time changes associated with this change order are summarized below. All days shown are calendar days.
Contract Time Summary
Original Substantial Completion Date:
December 7, 2013
Original Final Completion Date:
December 14, 2013
Substantial Completion Date C01 :
December 17, 2013
Final Completion Date (C01):
December 24, 2013
Substantial Completion Date (CO2):
December 31, 2013
Final Completion Date CO2 :
January 7, 2014
Substantial Completion Date (CO3):
January 31, 2014
Final Acceptance Date CO3):
May 1, 2014
WCD 006rev1 - Tivoli Power Supply/Vault Change
0 calendar day(s)
Revised Substantial Completion Date (C04):
February 14, 2014
Final Acceptance Date unchan ed from CO3:
May 1, 2014
Page 1 of 1
Change Order 04
Library Diagonal Improvements
Pending Issues Log
ditesco
Project and Construction Services
Project: Library Diagonal Improvements
Contractor: G.L. Hoff Construction
Project No. #7536
Date: January 30, 2014
Ref. No.
Section ec
Reference
Item Description
Date Requestetl
Amount
Status
1
WAW2
WCD4001
WGD.002
DiagonallLighting Change
Plaques
9/24/2013
($6, 135.00),
9/25/2013
$1,254.60
$1,h18,1O
$15„7.4500
3
WGD1003
WCD 004
Railin at Rear Access Door
Rain Garden Bx ansion
10/2/2013
9/25/2013
4
5M
6
11M
SM"C"DT0`75M
WCDA006, .
Install,Concrete River ArtiWork
Complete StoryATree,Boulderaln,F,ill.
10Gb7/201:3
10/2/2013
1/6/2014
81;424,00
($360.59)
11
WCDOO6rev1
WCD006 Boulder Iin-fill Time 8 Matierals final cost deduct
This value amends the pricing of WCD006 based on total from time and materials costs
7
WCD 007
Stage
10/15/2013
This WCD was revised and replaced with WCD007rev1
SME71M
,VW8"=
'9
MM
MW
CD007rev,1
WCD 006
WCD009
Stage
Rain.Gerden:SigniFountlation
Ddveway;Thickness Change
td41272013
tOGi6/20,13
$54,79005
$568510
i,Vd/2D,13
$622.00
10
WCD0.10
Tivoli P.oweriSuppl /vault change
L167/2D,13
$7,76.80W
Job Totals: $70,216.06
CO#1 $15,011.80
CO#2 $54,790.05
CO#3 $776.80
Remaining: ($360.59)
Total Contract Amount $347,593.00
Pending Issues as a % of Contract Amount 20.20
Pending
OVENNOW Change Order 1
BEEWSAMEM Change Order 2
Change Order 3
Proposal Request
Number. 4 - Revised / Hfial
.Hoff Construction
Final Accepted pricing for
WCDO06revl
Project# 13-237
Project'. Poudre Library Diagonal Walk Date, 116M14
Owner/GC Poudre1ibrary District Via: Ditesco I Jill Burrell E.I.
Descriptibn-
Cost for infill grouting,of boulders at the Story Tree per.VVCD 006
Cost to be tracked and billed on'a time and . materials. . , . basis.
Actual cost,listed below, results In a net deduct to the contract total,'preVidti§ly added per CO #1 at $1,015.00
Attachments-:
Change Proposal Request:
Equipment'Small Tools
-$15 0 . .3 1 7-
Supervision
$0.00
Labor
$255.0 , 0
Materials
s14940
Subcontracts
$0.00
Subtotal
$555:17
GIC General Conditions
$55'52
,GC Markup
$2T'76
GC Bond
$15.96 -
Total cost ofchange
$654.41
Calendar Days Extension to Contract Substancial Completion Date 2, (added previously -CO,# -I)
No Change in Contract -Price,(Initial if no change)
ADD to the Contract Price
DEDUCT from the Contract Price,
CONTRACTOR'S SIGNATURE: DATE:
. Approved-, by Architect:
:Approved by Owner'.
Canceled byArchiIect/Qwner-..
Approved Change in Work•requesrt.will be included in a future.forrrm61 chanqe order.
ig,15-West•12thStredtip.Q.Igoxj448IL6velarid, CO 80537 [Tel. 970,669.3125-5 Fax,970.663.1566
Www.hoffizomtruction.c.onn
John Stephen
From: Draves, Ken
Sent: Wednesday, February 05, 2014 12:18 PM
To: Barnes, Jeff
Cc: John Stephen; Jill Burrell (fill.burrell@ditescoservices.com); Carroll, Holly
Subject: Re: 7536 Library Diagonal - Change Order 4
Yes, thanks John.
Ken
Sent from my iPhone
On Feb 5, 2014, at 12:06 PM, "Barnes, Jeff" <JBarnes@poudrelibraries.ora> wrote:
Hi John — that's OK with me.
Thanks for taking care of it.
Jeff
From: John Stephen
Sent: Wednesday, February 05, 2014 11:32 AM
To: Draves, Ken; Barnes, Jeff
Cc: Jill Burrell(jill.burrell(�Oditescoservices.com); Carroll, Holly
Subject: FW: 7536 Library Diagonal - Change Order 4
Ken and Jeff, I will go ahead and decrease the existing PO per this change order with Hoff if that is ok
with you. Just saves you entering in a negative req. Let me know if ok. Thanks ... John
John Stephen, CPPO, LEED AP
Senior Buyer
215 N Mason
City of Fort Collins
970-221-6777
From: Jill Burrell fmailto:fill.burrell(�)ditescoservices.com]
Sent: Wednesday, February 05, 2014 10:23 AM
To: John Stephen
Subject: 7536 Library Diagonal - Change Order 4
Hi John,
Attached is Change Order 04 for the Library Diagonal Improvements Project.