.PROJECT TITLE: W. Prospect Bridge Replacement.
PROJECT NUMBER: 254002108 (Bid 07557)
CONTRACTOR: .Mountain Constructors, Inc. (PO #9135934)
CHANGE ORDER'NUMBER: 1
In preparing change orders show in order as, separate numbered paragraphs the following
1. Reason for change. 2. Description of change.
3. Change in contract cost., 4. Change In contract time:
1 &2. See oltached sheet for detall.
3. The contract cost Wll increase by $ 4,021.85.
4. _ There will be ro change in contract time.
ORIGINAL CONTRACT COST
$798,879.75
TOTAL APPROVED CHANGE ORDERS
$0.00
TOTAL PENDING CHANGE ORDERS
$0.00
TOTAL THIS CHANGE ORDER
$4,021.85
TOTAL % OF THIS CHANGE ORDER
...............
0.60%
TOTAL C.O. Vo OF ORIGINAL CONTRACT
0.50%
ADJUSTED CONTRACT COST
$802,901.60
(Assuming all change orders approved)
ACCEPTED BY:
- - DATE:
(Conir cto a as ta,tive)
DATE: A `
REVIEWED BY:
(Engl
t
DATE: (T _
SUBMITTED BY:
(Pro agar)
T'
.APPROVED BY:
DATE:- -- CZ"
Department Head)
APPROVED BY:
DATE: -- --
(Purchasing Agent oYer$60,000)
cc: Conueclor
.
Purchasing
Project M
==-C)WIGE ORDER IZ,JS'I -E��-X-ZP, U-7===
Quantity U. s I U. Toul
(Anode Bags, Solid Sleew, StainIess Steel waterline
Hardware, Additional Pipe Restraints
TOTAL
See Attached Dotournentatton
P"Wt*Pry APP#3
R
$4,021.85
t3 NU E QEPTIONS TAKEN 11 REVISE AND RESUBMT.
January 20, 2014 REVIEWED, COUWNTSAS NOTED []REJECTED
REVIEW IS ONLI FOR GENERAL CONFORNAhim WITH THE DESIGN
CONCEPT OF THE PROJECT AND GENERAL CMAJANCE WITH THE
INFORMATION GIVEN ON T�E CONTRACT DOCUMENT& ANYACTION
SHOWN IS SUBJECT TO THE'lREQUIRENENTS OF THE DRAWINGS
Mark Laken AND SPECIFICATKIN.& THE CONTRACTOR IS kESpONStlILF FOR
Engineering Department DIMNSIONS WHICH $HALL BE CONFhVAED AND CORRELATED AT.
City of Fort Collins THE PROJECT SITF_ FABRICATION PROCESSES AND TECHNIQUES
281 North College Avenue IOF CONSTRUCTION, COGROINArON OF HIS WORK WITH THAT OF
Fort Collins, Colorado 80522-0580ALL OTHER TRAMS, AND THE SATISFACTORy AND SAFE
PERFORIUNCES OF HISS WOFK
RE: West Prospect Road Bridge Repla 3y.A I L— DATE.
Dear -(Nark, -Enninaarinn r)Amr%n
Ment
During the lowering of the waterline we
addressed in the plans that resulted in increased
items and some of the costs were increased quantities; i.e. * the plans called for 2 EA - 60
lineal feet of Pipe Restraints without any further information but we installed 6 not 2
restraints. We are requesting compensation for the additional 4 restraints that were
installed as well as compensation for the new items. The following details the additional
costs:
Item Description aty Unit Price Extended Amount
Anode Bags 2-EA $ 1155.50 EA $ 311.00
(includes labor and all items necessary to complete the Installation)
Solid Sleeve 1 EA $ 725.35 EA $ 725.35
(Labor and Material)
Stainless Steel Bolts M EA $ 73.25 EA $1,025.50
(Material Only)
Total Increase for Now Items $2,061.85
Add'I Pipe Restraints 4 EA $ 490.00 EA $1,960.00
Total Increase to the Project $4,021.85
Please review this information and if you have any questions or need additional
Information glease call me at 303-910-4102.
President