Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7557 WEST PROSPECT ROAD BRIDGE REPLACEMENT AT NEW MERCER DITCHCI�y O� Collins Planning, Development & Transportation �t 281FriNdedny 281 Narlh College Avenue Engineering P.O. Box 580 - FM Collins, CO 00522AW SM221.6605 970.221.677E-fax Chan& order Form .PROJECT TITLE: W. Prospect Bridge Replacement. PROJECT NUMBER: 254002108 (Bid 07557) CONTRACTOR: .Mountain Constructors, Inc. (PO #9135934) CHANGE ORDER'NUMBER: 1 In preparing change orders show in order as, separate numbered paragraphs the following 1. Reason for change. 2. Description of change. 3. Change in contract cost., 4. Change In contract time: 1 &2. See oltached sheet for detall. 3. The contract cost Wll increase by $ 4,021.85. 4. _ There will be ro change in contract time. ORIGINAL CONTRACT COST $798,879.75 TOTAL APPROVED CHANGE ORDERS $0.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $4,021.85 TOTAL % OF THIS CHANGE ORDER ............... 0.60% TOTAL C.O. Vo OF ORIGINAL CONTRACT 0.50% ADJUSTED CONTRACT COST $802,901.60 (Assuming all change orders approved) ACCEPTED BY: - - DATE: (Conir cto a as ta,tive) DATE: A ` REVIEWED BY: (Engl t DATE: (T _ SUBMITTED BY: (Pro agar) T' .APPROVED BY: DATE:- -- CZ" Department Head) APPROVED BY: DATE: -- -- (Purchasing Agent oYer$60,000) cc: Conueclor . Purchasing Project M ==-C)WIGE ORDER IZ,JS'I -E��-X-ZP, U-7=== Quantity U. s I U. Toul (Anode Bags, Solid Sleew, StainIess Steel waterline Hardware, Additional Pipe Restraints TOTAL See Attached Dotournentatton P"Wt*Pry APP#3 R $4,021.85 t3 NU E QEPTIONS TAKEN 11 REVISE AND RESUBMT. January 20, 2014 REVIEWED, COUWNTSAS NOTED []REJECTED REVIEW IS ONLI FOR GENERAL CONFORNAhim WITH THE DESIGN CONCEPT OF THE PROJECT AND GENERAL CMAJANCE WITH THE INFORMATION GIVEN ON T�E CONTRACT DOCUMENT& ANYACTION SHOWN IS SUBJECT TO THE'lREQUIRENENTS OF THE DRAWINGS Mark Laken AND SPECIFICATKIN.& THE CONTRACTOR IS kESpONStlILF FOR Engineering Department DIMNSIONS WHICH $HALL BE CONFhVAED AND CORRELATED AT. City of Fort Collins THE PROJECT SITF_ FABRICATION PROCESSES AND TECHNIQUES 281 North College Avenue IOF CONSTRUCTION, COGROINArON OF HIS WORK WITH THAT OF Fort Collins, Colorado 80522-0580ALL OTHER TRAMS, AND THE SATISFACTORy AND SAFE PERFORIUNCES OF HISS WOFK RE: West Prospect Road Bridge Repla 3y.A I L— DATE. Dear -(Nark, -Enninaarinn r)Amr%n Ment During the lowering of the waterline we addressed in the plans that resulted in increased items and some of the costs were increased quantities; i.e. * the plans called for 2 EA - 60 lineal feet of Pipe Restraints without any further information but we installed 6 not 2 restraints. We are requesting compensation for the additional 4 restraints that were installed as well as compensation for the new items. The following details the additional costs: Item Description aty Unit Price Extended Amount Anode Bags 2-EA $ 1155.50 EA $ 311.00 (includes labor and all items necessary to complete the Installation) Solid Sleeve 1 EA $ 725.35 EA $ 725.35 (Labor and Material) Stainless Steel Bolts M EA $ 73.25 EA $1,025.50 (Material Only) Total Increase for Now Items $2,061.85 Add'I Pipe Restraints 4 EA $ 490.00 EA $1,960.00 Total Increase to the Project $4,021.85 Please review this information and if you have any questions or need additional Information glease call me at 303-910-4102. President ROLBOX 405 - PLATTIEVILI-E,C0L0RAD68o6si-o4o5 - (970)785-6161