Loading...
HomeMy WebLinkAboutCORRESPONDENCE - BID - 7536 DIAGONAL WALK & STAGE IMPROVEMENTS FOR POUDRE RIVER PUBLIC LIBRARY DISTRICT (3)dnesco Project and Construction Services August 29, 2013 Ms. Holly Carroll Executive Director Poudre River Public Library District 201 Peterson Street Fort Collins, CO 80524 RE: Poudre River Public Libraries - Library Diagonal Walk Improvements Hoff Construction Award Recommendation Dear Holly: 1315 Oakridge Drive - Suite 120 Fort Collins, CO 80525 970.204.1673 fax ditescoservices.com Delivery by email Following our meeting earlier today, we would like to recommend award to. G.L,Moff Construction for the Library Diagonal Walk Improvements project. The items listed below are a summary of Hoff's qualifications and recommendation of award. Bidding Submittal Requirements Hoff Construction met all bidding submittal requirements. Summary and Recommendation Following the Library Streetscape project, it appears Hoff has had success completing their projects on schedule and within budget, with minimal RFIs and Change Orders. Hoff Construction provided their financial reference, Chase Bank. Hoff Construction has adequate financial and bonding resources to complete the Work on the Library Diagonal Walk Improvements Project. Considering the information presented above, we believe Hoff Construction is a qualified contractor to perform the Library Streetscape Project and thus, recommend contract award. The contract award shall include the contractor's base bid as well as alternates as described below: 1. Base Bid: $230,206.00 The Work of this Contract consists of demolition, concrete sitework, architectural concrete finishing, grading, installation of architectural benches and tables, electrical bollard relocation, up -lighting artistic boulders, and installation of new artistic signage at both ends of the project. 2. Lighting - Alternate 2: $11'2,657.00 The Work of this alternate consists of pedestrian and Tivoli light procurement and installation. All trenching, conduit, wiring, and termination related to the pedestrican poles and Tivoli light strands are included in this alternate. Benches - Alternate 3: $4,730.00 The Work of this alternate consists of bench procurement and installation, etched plaque procurement and installation. These benches will be installed adjacent to the game board installed by the Elks. The total cost of the Work for contract award is valued at $347,593.00. The total project cost has been value engineered to 20% of the original bid; an itemized breakdown is attached to this letter. Page 1 of 2 Please let me know if you have any questions or require further information regarding this letter. I can be reached by phone at 970.690.1889 or email fill.burrell(a)ditescoservices.com. Sincerely, i /Jill Burrell Cc: Library Diagonal Walk Improvements Project File Ken Draves — Poudre River Public Libraries Gerry Paul — City of Fort Collins Purchasing John Stephen — City of Fort Collins Purchasing Page 2 of 2 Bid Analysis - Summary Report Bench Allee & Amphitheater Poudre River Public Library District Bid Analvsis 09-29-13 Original Bid 08-08-13 Revised Bid 08-23-13 Percent Difference _ Comments 1 Base Bid $230,206 $230.206 0% No Change to Base Bid 2 Alternate #2 Lighting Package $192,270 $112,657 -52% At bid time, Lighting package was applied as a budget number. After bid time, the Contractor received a firm price and was able to revise their bid. 3 Alternate #3 Bench Procurement & Instatllation $4,730 $4,730 0% No Change to Alternate #4. SUBTOTAL $427,206 $347,593 -21% 1 Construction Contingency 6.1% of construction costs $23,021 $22,557 -2% Total Project $450,227 $370,150 ' Total Available Budget $431,042 $431,042 Bench Allee Amphitheater Library Trust DDA Bohemian Foundation $121,837 $148,002 $108,000 $23,203 $30,000 $121,837 $148,002 $108,000 $23,203 $30,000 Difference 1 -$19,185 $60,892 Last Updated 8/29/2013 Page 1